EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Program for Inspection of Non Federal Dams  Woronoco Mills  60 Feet  Dam MA 00738  Woronoco Mills  29 Feet  Dam MA 00737  Connecticut River Basin  Russell  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Woronoco Mills 60 Feet Dam MA 00738 Woronoco Mills 29 Feet Dam MA 00737 Connecticut River Basin Russell Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 111 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dams are in fair condition, due to the potential overtopping of the dams during the occurrence of the test flood and the reported overtopping of the dams during prior floods. There is some eroding of concrete joints in the dam, deteriorated concrete on appurtenant structures and observed seepage both from the joints in the concrete and from the embankments. The east dike is heavily overgrown with brush and young trees. Hydraulic analysis indicates that the test flood stage would be at elevation 240.3 which is approximately 4.3 feet above the top of the right embankment. Approximately 95 percent of the test flood would pass over the 60 foot dam, 29 foot dam and the small dam spillways. The remaining flow would be over the right embankment between the screen house and the mill building.

Book Government Reports Annual Index

Download or read book Government Reports Annual Index written by and published by . This book was released on 1985 with total page 1016 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1985 with total page 1224 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Whites Mill Pond Dam  MA 00630   Connecticut River Basin  Winchendon  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Whites Mill Pond Dam MA 00630 Connecticut River Basin Winchendon Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 88 pages. Available in PDF, EPUB and Kindle. Book excerpt: White's Mill Pond dam which was built before 1923 is a 340-foot long earthfill dam with upstream and downstream dry stone masonry walls. The dam has a maximum height of 13 feet and consists of a spillway, low level outlet, an intake toi a plant, and an earth dike. The following deficiencies were observed at the site: severe seepage at several locations along the toe of the dam; downstream stone masonry walls are out of plumb; lack of access to the low level outlet operator; erosion at the low point of the dam crest; bulging of the downstream masonry wall in several locations; stone missing from the upstream face of the spillway, mortar missing from the stone masonry spillway of the dam; heavy growth of brush and trees on the dam crest and on the dike; and an accumulation of debris in the discharge channel. Hydraulic analyses indicate that the spillway (without stoplogs) can discharge 520 cfs, or 76 percent of the test flood outflow before the dam is overtopped. (With the stoplogs, the spillway can discharge 170 cfs or 22 percent of the test flood outflow before the dam is overtopped).

Book National Program for Inspection of Non Federal Dams  Powder Mill Pond Dam  MA 00092   Connecticut River Basin  South Barre  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Powder Mill Pond Dam MA 00092 Connecticut River Basin South Barre Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 107 pages. Available in PDF, EPUB and Kindle. Book excerpt: Powder Mill Pond Dam is located on the Ware River approximately one mile upstream of South Barre, Massachusetts. The dam, reconstructed in 1908 to generate electric power for the Barre Wool Combing Company, consists of an upgated concrete spillway approximately 125 ft. long and 20 ft. high, a short emergency spillway and an outlet canal with two inoperative timber gates. The dam was extensively modified during the 1930's. Based on a visual examination of the structure, the facility is in fair to poor condition. Nevertheless, there was no evidence of structural failure or other conditions which would warrant urgent remedial treatment. Based on size and hazard classifications in accordance with Corps of Engineers guidelines, the test flood for this dam is the Probable Maximum Flood (PMF). The PMF outflow of 48,160 cfs would overtop the dam by 5.15 ft. With the water level at top of dam, the main and emergency spillways can pass 17,940 cfs which is 37 percent of the test flood.

Book National Program for Inspection of Non Federal Dams  Westfield Reservoir Dam  MA 00734  Connecticut River Basin  Montgomery  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Westfield Reservoir Dam MA 00734 Connecticut River Basin Montgomery Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 79 pages. Available in PDF, EPUB and Kindle. Book excerpt: Westfield Reservoir Dam is an earthen embankment structure about 350 feet long and 40 feet high. It has an uncontrolled overflow spillway located on the left (east) abutment and a 24-inch diameter cast-iron pipe outlet conduit which passes beneath the dam and which is valve controlled at the outlet end. Based on the visual inspection, the dam is judged to be in air condition. The following deficiencies were observed at the dam: minor but widespread slumping on the downstream slope; an animal burrow on the downstream slope; large trees near both abutments; a soft, wet area along the right bank of the downstream channel; a small sinkhole on the right side of the spillway discharge channel; lack of vegetation on the crest of the dam; inoperable valves on the downstream end of the outlet conduit; and no valve or other means of regulating or shutting off flow at the intake end of the outlet conduit. With the stoplog in place, the spillway capacity of Westfield Reservoir Dam is 707 cfs, which is about 15 percent of the routed test flood outflow of 4670 cfs. With the stoplog removed, the spillway capacity is about 994 cfs, which is about 21 percent of the routed test flood outflow. The test flood would cause the dam to be overtopped by about 3.5 feet.

Book National Program for Inspection of Non Federal Dams  Lyman Mill Pond  MA 00500   Connecticut River Basin  Southampton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lyman Mill Pond MA 00500 Connecticut River Basin Southampton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 89 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a buttressed ten foot high, 90 feet wide spillway, with concrete training walls. The visual inspection of the dam indicated it to be in generally fair condition, due to the finding of a seepage boil. The dam has a size classification of small and a hazard classification of low. It is recommended that the owner engage a qualified engineer to investigate the foundation of the right abutment wall and if necessary, design a seepage protection system where a seepage boil was found.

Book National Program for Inspection of Non Federal Dams  Mill Pond Dam  MA 00575   Connecticut River Basin  Springfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Mill Pond Dam MA 00575 Connecticut River Basin Springfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 56 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is about 48 ft. long and 13 ft. high. It is constructed of cut stone masonry. The dam is generally in poor condition. The right end of the dam has had a partial failure at the crest. The dam is classified as small in size with a hazard potential of low. Recommendations for remedial work include repair of the failed area at the right end of the crest of the dam, the plugging of pressure leaks in the dam and mortaring of open joints, and the repair of erosion damage at the right abutment. (Author).

Book National Program for Inspection of Non Federal Dams  Cobble Mountain Reservoir Dam  MA 00068   Connecticut River Basin  Russell  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Cobble Mountain Reservoir Dam MA 00068 Connecticut River Basin Russell Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 122 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a sluiced earth fill between massive rock toe embankments. The top of dam is about 730 feet long about 250 above the valley bottom at the toe. The dam is generally in GOOD condition, well maintained, with no excessive or dangerous leakage. The preliminary hydrologic and hydraulic analysis for this LARGE size, HIGH hazard dam indicated that the spillway is adequate. The test field is the PMF and for the tributary drainage area of 45.8 square miles of mountainous terrain which is more than 80% forested, the unit discharge rate is 1440 CFS/square miles. (Author).

Book National Program for Inspection of Non Federal Dams  South Barre Mill Pond Dam  MA 00091   Connecticut River Basin  South Barre  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams South Barre Mill Pond Dam MA 00091 Connecticut River Basin South Barre Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 69 pages. Available in PDF, EPUB and Kindle. Book excerpt: The South Barre Mill Pond dam is a small dam consisting of two adjacent concrete ogee spillways, a short earth embankment on the right side and an outlet works to a penstock at the left abutment. The present dam, constructed about 1904, was extensively damaged in the floods of 1936 and 1938 and has been reconstructed on several occasions, the latest work in 1944. The dam is in fair to good condition. There are no obvious signs of failure or conditions which would warrant urgent remedial treatment. Hydraulic analyses indicate that the spillway will not pass one-half the probable maximum flood and the spillway is considered inadequate, Recommendations for remedial work include repair of concrete at the left training wall and right spillway weir and restoration of gates to good operating condition. Additional investigation of the right spillway weir is recommended, since no data are available concerning this portion of the structure.

Book National Program for Inspection of Non Federal Dams  Ware Industries Main  Upper  Dam  MA 00594   Connecticut River Basin  Ware  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Ware Industries Main Upper Dam MA 00594 Connecticut River Basin Ware Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Ware Industries Man (Upper) Dam consists of a main spillway 115 ft. long and approximately 34 ft. high, a spillway extension 50 ft. long and 4 ft. high, a concrete emergency spillway, a gate house with control works to a canal, and a 115 ft. long overflow weir from the canal. Based on a visual examination of the structure, the project is in good to fair condition. There was no evidence of structural failure or other conditions which would warrant urgent remedial action. The PMF outflow of 109,200 cfs would overtop the dam by 11.25 ft. With the water level at the top of dam, the spillway system can pass 7980 cfs which is 7.3 percent of the test flood.

Book National Program for Inspection of Non Federal Dams  Mill Pond Reservoir Main Dam  MA 01121   Merrimack River Basin  Burlington  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Mill Pond Reservoir Main Dam MA 01121 Merrimack River Basin Burlington Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is comprised of a 1,300 foot long, 49.5 foot high earth fill embankment having a concrete core wall. The reservoir is a pump storage facility, having no inlet stream or spillway. Between the design high water level, elevation 144, and the top of dam, elevation 147.5, there is 221 acre-feet of available storage. This capacity is sufficient to store all the runoff, 203 acre-feet, from the drainage area. There will be no test flood outflow. The dam will not be overtopped. The following remedial measures should be instituted by the Owner: grass and brush on the dam should be cut and maintained; animal burrows should be filled-in and prevented from reoccuring; trespassing on the dam should be prevented; a formal warning system for the downstream impact area should be developed and the dam should be inspected once every year by a qualified registered professional engineer.

Book National Program for Inspection of Non Federal Dams  Stevens Paper Company  Lower  Dam  MA 00074   Connecticut River Basin  Westfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Stevens Paper Company Lower Dam MA 00074 Connecticut River Basin Westfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 102 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam generally consists of a 190 foot masonry spillway, an earthfill embankment and 2 outlet pipes. The dam was designed in 1955 by Stone and Webster Engineering Corporation to replace an earlier dam, which was damaged by the flood of that year. Construction which utilized portions of the original structure was completed in 1957. The visual inspection showed the dam to be in good condition. However, water passing over the spillway limited the inspection of the spillway. The spillway is capable of passing 96% of the test flood outflow. The top of the embankment, elevation 175, would be overtopped by about 1 foot. However, failure under this condition would only cause insignificant damage as the downstream flooding would have already occurred. The dam is generally in good condition. However, it is recommended that the owner repair the drawdown outlet, and operate it at least once yearly to insure continued adequacy. After this outlet is repaired, or during a period of low flow, the owner should engage a qualified engineer to inspect the spillway without water flowing over it. Also the erosion of a retaining wall downstream of the spillway on the right abutment side should be repaired.

Book National Program for Inspection of Non Federal Dams  McLean Reservoir  MA 00539   Connecticut River Basin  Holyoke  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams McLean Reservoir MA 00539 Connecticut River Basin Holyoke Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 700 foot, 35 foot high earthfill embankment and a 920 foot long, 15 foot high earth-fill dike a gatehouse with outlet controls and a 10 foot wide concrete arch emergency spillway. With the water lever assumed to spillway crest at time of test flood, spilway discharge of about 30 cfs woudl occur. The reservoir woudl be surcharged to elevation 433, four feet above the spillway crest and two feet below the dam crest. The dam will not be overtopped. The dam is generally in fair condition. Remedial measures consist of removal of all brush and trees from the downstream slope of the main dam and spillway channel and repair of spalled and deteriorated concrete on the emergency spillway.

Book National Program for Inspection of Non Federal Dams  Northampton Reservoir  Upper Dam   MA 00521   Connecticut River Basin  Whately  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Northampton Reservoir Upper Dam MA 00521 Connecticut River Basin Whately Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 94 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam is a 940 foot long earth embankment dam with a concrete spillway. It is recommended that the areas of erosion both on the upstream and downstream faces where the abutments and embankment interface be repaired. Surface water in these areas should be redirected to prevent future erosion. The riprap on the upstream face should be extended to the dam's crest. The water exiting from the toe and core wall drains should be directed to a control channel and weir where the flow can be periodically measured. The 20-in capped pipe running beneath the dam to the downstream toe should be uncapped and extended to the lower reservoir. This will prevent the potential of a pressurized pipe (should the outlet gate be left open) from bursting and undermining the dam. Although the spillway can not discharge the test flood without overtopping the dam, the spillway capacity is comparatively large. Because of the hydrologic and safety relationships between this dam and the lower reservoir, it is necessary that future hydrologic studies concerning spillway capacities at either project should simultaneously encompass studies for both projects.

Book National Program for Inspection of Non Federal Dams  Diamond International Corporation  Upper Dam  MA 00562  Connecticut River Basin  Palmer  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Diamond International Corporation Upper Dam MA 00562 Connecticut River Basin Palmer Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 88 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a run-of-the-river type structure consisting of a 17 ft. high concrete overflow spillway and a 13 ft. high rockfill dike. The total height of the structure is 23 ft. from the top of the dike to the streambed at the toe of the spillway. There are deficiencies which must be corrected to assure the continual performance of this dam. The dam has been classified as intermediate in size with a hazard potential of high.