EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Program for Inspection of Non Federal Dams  Tihonet Pond Number 2 Dam  MA 00030   Massachusetts Coastal Basin  Wareham  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Tihonet Pond Number 2 Dam MA 00030 Massachusetts Coastal Basin Wareham Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 112 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Tihonet Pond No. 2 Dam consists of an earth embankment with a vertical stone masonry wall over a portion of the downstream face. The embankment has a minimum top width of approximately 30 feet, a maximum height of 15 feet, and upstream and downstream slopes that vary from vertical at a downstream cut-stone masonry wall to approximately 2 H to 1 V. The overall length of the dam is approximately 660 ft. Included in this length are two spillway structures located at the left and right ends of the dam. These structures consist of stoplogs in concrete slots emptying into conduits that pass through the dam. Based on visual inspection and a review of all available pertinent data, the dam is considered to be in poor condition. Features that could effect the structural integrity of the dam include wet areas at the downstream toe of the dam, erosion and slumping of dam slopes, extensive tree growth on the dam slopes, movement of the downstream vertical masonry wall. The test flood would overtop this dam by about 0.5 ft., it would also overtop a second dam located on this pond, Tihonet Pond No. 1 Dam, by about 2.5 ft. The crest of this second dam is approximately elevation 40 NGVD. The spillway for this dam would carry about 10% of the Test Flood.

Book National Program for Inspection of Non Federal Dams  Parker Mills Pond Dam  MA 00150   Massachusetts Coastal Basin  Wareham  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Parker Mills Pond Dam MA 00150 Massachusetts Coastal Basin Wareham Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 114 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Parker Mills Pond Dam, Wareham, Mass., is an earthen embankment with vertical, cut-stone masonry walls upstream and downstream, 3/4 of the crest is a bituminous concrete roadway. The embankment has a minimum top width of approximately 10 feet and a maximum height of 19 feet. The overall length of the dam is approximately 400 feet including two spillways. The dam is considered to be in fair condition. A test flood equal to 1/2 the PMF was selected.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1984-12 with total page 618 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Mill Pond Dam  MA 00027   Wareham River Basin  Wareham  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Mill Pond Dam MA 00027 Wareham River Basin Wareham Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 98 pages. Available in PDF, EPUB and Kindle. Book excerpt: Mill Pond Dam is an earth embankment dam believed to have been constructed around 1900. The facility is used as a bridge across the Agawam River and to impound water for recreational purposes. The dam is about 285 ft. long and 16.5 ft. high. The dam has two spillways. The primary spillway is a concrete sluiceway located near the left abutment. A two bay stoplog structure located at the downstream end of the sluiceway controls flows through the facility. The secondary spillway is a 5 ft. dia. metal pipe culvert located on the right side of the dam. A stoplog structure having a weir length of 5.4 ft. is located on the upstream end of this spillway. An 18 in. dia. outlet passes through the dam near mid-point. Outflow is controlled at a 6 ft. by 8 ft. by 6 ft. upstream concrete intake structure. The dam and appurtenant works are judged to be in fair condition. There is no low level outlet for draining the pond. Seepage was noted at four locations. There was erosion of both the upstream and downstream embankments in the vicinity of the 18 in. dia. outlet pipe. Tree and brush growth is abundant. The test flood inflow is 3,420 cfs; the routed test flood outflow of 3,150 cfs would overtop the low point in the left abutment by about 2.0 ft. The spillways can pass about 7 percent of the routed test flood outflow without overtopping the low point in the left abutment.

Book Tihonet Pond No  2 Dam  Wareham  Massachusetts

Download or read book Tihonet Pond No 2 Dam Wareham Massachusetts written by United States. Army. Corps of Engineers. New England Division and published by . This book was released on 1981 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government reports annual index

Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 1140 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Whiting Pond Dam  MA 00859   Massachusetts Rhode Island Coastal Basin  North Attleboro  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Whiting Pond Dam MA 00859 Massachusetts Rhode Island Coastal Basin North Attleboro Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: Whiting Pond Dam is approximately 600 ft. long, has a maximum height of 9 ft, and includes a 13-ft. long concrete spillway. The dam is in fair condition, based on a visual examination of the structure. Although some deficiencies were noted, there no evidence of settlement, lateral movement or other signs of structural failure or other conditions which would warrant urgent remedial action. The PMF outflow of 4160 cfs (1015 csm) would overtop the spillway platform by about 2.6 ft. and most of the embankment by 1 to 1.5 ft. With the water at the level of the platform, the spillway (without flashboards) can pass 312 cfs which is 7.5 percent of the test flood.

Book National Program for Inspection of Non Federal Dams  Lee Pond Dam  MA 00891   Massachusetts Coastal Basin  Uxbridge  Massachusetts  Phase I Inspection Program

Download or read book National Program for Inspection of Non Federal Dams Lee Pond Dam MA 00891 Massachusetts Coastal Basin Uxbridge Massachusetts Phase I Inspection Program written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 92 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Lee Pond Dam consists of an earthen embankment with a natural spillway and a vertical stone masonry wall along two short sections of the downstream face. The embankment has a minimum top width of 15 ft. and a maximum height of 25 ft. The overall length of the dam is 870 ft., including the natural spillway at the right end of the dam which is about 15 ft. wide at normal pool elevation. The outlet works consist of an inoperable sluice gate located about 250 ft. from the left end of the dam. The dam impounds Lee Pond, which is used for recreational purposes. Maximum storage capacity at the top of dam is 220 acre-feet. Based on visual inspection and a review of all available pertinent data, the dam is considered to be in poor condition. Features that could effect the structural integrity of the dam are seepage at the downstream toe of the dam, erosion and slumping of dam slopes, extensive tree growth on the dam slopes and animal burrows on the crest and downstream face. The calculated test flood inflow of about 660 cfs results in a routed outflow of about 650 cfs. The spillway passes 100% of the test flood outflow with a freeboard of about 3 ft.

Book National Program for Inspection of Non Federal Dams  Haskell Pond Dam  MA 00155   Massachusetts Coastal Basin  Gloucester  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Haskell Pond Dam MA 00155 Massachusetts Coastal Basin Gloucester Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 103 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Ellis Pond Dam  MA 00805   Massachusetts Coastal Basin  Norwood  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Ellis Pond Dam MA 00805 Massachusetts Coastal Basin Norwood Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 127 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is an earth dam about 400 ft. long and 16 ft. high. It is small in size with a high hazard potential. Generally, it is in poor condition. Many deficiencies which have been neglected for years were noted. In the event of failure of the dam there is an extent of downstream development that would be seriously affected.

Book National Program for Inspection of Non Federal Dams  Spring Pond Dam MA 00193  North River Basin  Peabody  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Spring Pond Dam MA 00193 North River Basin Peabody Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 89 pages. Available in PDF, EPUB and Kindle. Book excerpt: Spring Pond Dam is an earthfill embankment with a maximum height of about 10 feet and a relatively straight crest about 225 feet long, averaging about 20 feet wide. The dam is considered to be in good condition. The dam is classified as small in size with a significant hazard potential.

Book National Program for Inspection of Non Federal Dams  West Pond Outlet  MA 00186   Massachusetts Coastal Basin  Gloucester  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams West Pond Outlet MA 00186 Massachusetts Coastal Basin Gloucester Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 67 pages. Available in PDF, EPUB and Kindle. Book excerpt: The impounding structure at West Pond is a 123-foot long, 12-foot high earthfill dam with an overflow spillway at the east abutment. The spillway is located at the east abutment of the dam and consists of a notched ungated concrete weir with an overall length of 16 feet. The low point on the top of the dam is lower than the unnotched portion of the spillway. Based on the visual inspection of the site and a review of the limited data available on the dam, the dam is considered to be in poor condition and is in need of extensive repair work. The following deficiencies were observed at the site: moderate seepage below the toe of the dam; severe erosion of the upstream slope exposing the core wall; erosion of the top and downstream slope of the dam, localized buldging along the downstream slope; lack of a low level outlet; separation of the training walls from the spillway; seepage around and beneath the spillway; brush, timber, and debris in the discharge channel; and trees and vegetation growing on the slopes of the dam. The peak test flood outflow of 107 cfs will overtop the dam by a maximum of 1.3 feet. The spillway can discharge only 1.1 percent of the test flood before the dam is overtopped.

Book National Program for Inspection of Non Federal Dams  Fountain Pond Dam MA 00191  Massachusetts Coastal Basin  Peabody  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Fountain Pond Dam MA 00191 Massachusetts Coastal Basin Peabody Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 77 pages. Available in PDF, EPUB and Kindle. Book excerpt: The impounding structure at Fountain Pond is a 400-ft long, 16-ft high earth dam with a stone masonry wall on the downstream slope and an outlet conduit. There are deficiencies which must be corrected to assure the continued performance of this dam. The dam is in poor condition. The dam is small in size and has a significant hazard potential. There are various remedial measures that the owner should hire a professional engineer for.

Book National Program for Inspection of Non Federal Dams  Cook Pond Dam  MA 00123   Blackstone River Basin  Worcester  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Cook Pond Dam MA 00123 Blackstone River Basin Worcester Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 133 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Browns Pond Dam MA 00192  North River Basin  Peabody  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Browns Pond Dam MA 00192 North River Basin Peabody Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: Browns Pond Dam is an earthfill embankment about 200-feet long, with a maximum height of about 5 feet and a crest of about 10 feet. The dam has inadequacies and deficiencies which, if not remedied, have the potential for developing into hazardous conditions. The dam is classified as small in size with a low hazard potential.

Book National Program for Inspection of Non Federal Dams  Thirty Acre Pond Dam  MA 00423   Taunton River Basin  Brockton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Thirty Acre Pond Dam MA 00423 Taunton River Basin Brockton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: Thirty Acre Pond Dam is an earthen dam about 600 ft. long and 13 ft. high. The dam is in fair condition. The dam is considered to be small in size and has a high hazard potential. The spillway test flood selected is Probable Maximum Flood. Investigations are recommended to check the adequacy of the structure under seismic loading, etc.

Book National Program for Inspection of Non Federal Dams  Singletary Pond Dam  MA 00144   Blackstone River Basin  Millbury  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Singletary Pond Dam MA 00144 Blackstone River Basin Millbury Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: