EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Program for Inspection of Non Federal Dams  Mountain Street Reservoir Dam  MA 00082   Mountain Street Reservoir Dikes  MA 01295   Connecticut River Basin  Williamsburg  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Mountain Street Reservoir Dam MA 00082 Mountain Street Reservoir Dikes MA 01295 Connecticut River Basin Williamsburg Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 81 pages. Available in PDF, EPUB and Kindle. Book excerpt: Mountain Street Reservoir Dam is a 1,300-foot long earth fill dam built in 1905 and used for public water supply. The dam has a maximum height of 33 feet and consists of an embankment, spillway and gatehouse. The low-level outlet is a 24-inch diameter pipe controlled by a gate valve in the gatehouse. There are also two earth fill dikes located on the east side of the reservoir. Dike No. 1 is 160 feet long and 16 feet high. Dike No. 2 is 180 feet long and 8 feet high. Generally the dam is in fair condition. The following deficiencies were observed at the site: an inoperable low-level outlet; seepage along the downstream slope; erosion and animal burrows on the downstream slope; riprap missing from the upstream slope; cracked and spalled concrete on the gatehouse service bridge and spillway; a heavy growth of brush and trees on the lower downstream slope; and an accumulation of debris on the crest and discharge channel of the spillway. The test flood would overtop the dam by 0.1 feet. Hydraulic analyses indicate that the spillway with the stoplog can discharge 220 cfs, or 92 percent of the test flood outflow before the dam is overtopped. Without the stoplog, the test flood outflow is 240 cfs with the pond at E1 461.4. In this case, the spillway can discharge 300 cfs or 125 percent of the test flood outflow, and the dam would not be overtopped.

Book National Program for Inspection of Non Federal Dams  Cobble Mountain Reservoir Dam  MA 00068   Connecticut River Basin  Russell  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Cobble Mountain Reservoir Dam MA 00068 Connecticut River Basin Russell Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 122 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a sluiced earth fill between massive rock toe embankments. The top of dam is about 730 feet long about 250 above the valley bottom at the toe. The dam is generally in GOOD condition, well maintained, with no excessive or dangerous leakage. The preliminary hydrologic and hydraulic analysis for this LARGE size, HIGH hazard dam indicated that the spillway is adequate. The test field is the PMF and for the tributary drainage area of 45.8 square miles of mountainous terrain which is more than 80% forested, the unit discharge rate is 1440 CFS/square miles. (Author).

Book Government reports annual index

Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 1296 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Provin Mountain Reservoir  MA 00528  Connecticut River Basin  Agawam  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Provin Mountain Reservoir MA 00528 Connecticut River Basin Agawam Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 117 pages. Available in PDF, EPUB and Kindle. Book excerpt: Provin Mountain Reservoir is a series of four concrete storage reservoirs, averaging 30 feet deep, constructed on the ridge of Provin Mountain in Agawam, Massachusetts. Two of the concrete reservoirs are rectangular in shape and were constructed in 1910 and 1932, respectively. The first reservoir is 288 feet by 320 feet with a maximum height of 30 feet while the second reservoir is 288 feet by 224 feet with a maximum centerline depth of 38 feet. The two other concrete structures are circular and were added to the facility in 1958. These tanks are 29.5 feet in height and 320 feet in diameter. The total storage capacity of the four reservoirs is approximately 60 million gallons or 184 Acre-Feet. The structures are covered with earth and have stone paved side slopes. The following deficiencies were observed at the site: areas of localized sloughing in the rock slope of the east and west sides of Reservoir No. 1; minor creep with a tendency towards bulging in the lower half of the rock slopes of Reservoir No. 1; and seepage at the toe of the slope, northeast of Reservoir No. 2.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1984-12 with total page 618 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Mountain Lake Dam  MA 00530   Connecticut River Basin  Chicopee  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Mountain Lake Dam MA 00530 Connecticut River Basin Chicopee Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 122 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is about 200 ft. long, having a maximum height of about 28 ft. It consists of an earth embankment with no upstream shore protection and natural vegetation on the crest and downstream face. It is in poor condition. It is small in size and has a high hazard potential classification.

Book National Program for Inspection of Non Federal Dams  Barre Reservoir Dam and Dike  MA 00094   Connecticut River Basin  Barre  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Barre Reservoir Dam and Dike MA 00094 Connecticut River Basin Barre Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 110 pages. Available in PDF, EPUB and Kindle. Book excerpt: The impoundment structures on Barre Reservoir consist of a 225-foot long earthfill dam and a 410-foot long earthfill dike. The spillway consists of a flat-crested, concrete weir 68.3 feet long and the low-level outlet is a 12-inch diameter iron pipe located at the dike, approximately 70 feet to the right of the left abutment. Generally, the dam and dike are in poor condition. The following deficiencies were observed at the site: severe seepage from the downstream toe of the dike at the left abutment; seepage along almost the entire length of both the dam and dike, at the downstream toe; heavy growth of vegetation on the crest and slopes of both the dam and dike; seepage through the vertical downstream stone spillway wall and beneath both left and right sidewalls of the spillway channel; minor bulging of the vertical stone spillway wall; spalling of the concrete approach apron, spillway crest, and splash apron, slight to heavy spalling of concrete along the upstream face of the spillway sidewalls; and an accumulation of debris in the spillway discharge channel. The test flood would overtop the dam by 0.1 feet but would not overtop the dike. Hydraulic analyses indicate that the spillway can discharge 1,370 cfs, or 93 percent of the test flood outflow before the dam is overtopped.

Book National Program for Inspection of Non Federal Dams  Chicopee Reservoir  MA 00720   Connecticut River Basin  Chicopee  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Chicopee Reservoir MA 00720 Connecticut River Basin Chicopee Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 103 pages. Available in PDF, EPUB and Kindle. Book excerpt: Chicopee Reservoir Dam is a 545-foot long, 47-foot high earth embankment dam constructed circa 1926. The spillway is a 44-foot long ogee crest which si located at the right abutment of the dam and has a crest elevation (El) 168.0. The outlet conduits are a 24-inch cast-iron former water supply line and a 30-inch cast-iron blowoff. The following deficiencies were observed at the site: high degree of erosion of the principal spillway chute structure and outlet training walls; erosion gullies on the right abutment above the dam crest; brush growth on the downstream slope of the embankment; and seepage from the left abutment downstream of the dam. Generally, the dam is in fiar condition. The adopted spillway Test Flood is equal to the Probable Maximum Flood which yields a peak test flood inflow of 7565 cfs. Hydraulic analyses indicate that the spillway, without flashboards, with the water surface at the top of the dam can discharge 3,950 cfs which is less than the total routed test flood outflow of 6,450 cfs. Thus, the spillway can discharge 60% of the routed test flood outflow.

Book National Program for Inspection of Non Federal Dams  Wrights Reservoir Dam  MA 00117   Connecticut River Basin  Gardner  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Wrights Reservoir Dam MA 00117 Connecticut River Basin Gardner Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 95 pages. Available in PDF, EPUB and Kindle. Book excerpt: Wright's Reservoir Dam is approximately 1,000 ft long. It consists of a small earth embankment approximately 14 ft high and an ungated concrete ogee spillway and stilling basin. An 800 ft long dike is present at this facility on the west side of the reservoir. Its maximum height is 12 ft. This facility was constructed in 1964 under the direction of the Corps of Engineers. The dam is generally in good to excellent condition. There are no obvious signs of failure or conditions which would warrant urgent maintenance treatment. Hydraulic analysis indicated that the spillway will pass the spillway test flood without overtopping the dam. The spillway test flood selected for this structure was the probable maximum flood. Recommendations for maintenance work include the clearing of brush and mowing of grass, especially at the west dike and the replacement of the operating handle for the reservoir drain at the outlet works. This work should be performed as part of the regular maintenance of the dam.

Book National Program for Inspection of Non Federal Dams  McLean Reservoir  MA 00539   Connecticut River Basin  Holyoke  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams McLean Reservoir MA 00539 Connecticut River Basin Holyoke Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 700 foot, 35 foot high earthfill embankment and a 920 foot long, 15 foot high earth-fill dike a gatehouse with outlet controls and a 10 foot wide concrete arch emergency spillway. With the water lever assumed to spillway crest at time of test flood, spilway discharge of about 30 cfs woudl occur. The reservoir woudl be surcharged to elevation 433, four feet above the spillway crest and two feet below the dam crest. The dam will not be overtopped. The dam is generally in fair condition. Remedial measures consist of removal of all brush and trees from the downstream slope of the main dam and spillway channel and repair of spalled and deteriorated concrete on the emergency spillway.

Book National Program for Inspection of Non Federal Dams  Lower Glen  Greenfield  Reservoir Dam  MA 00048   Connecticut River Basin  Leyden  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lower Glen Greenfield Reservoir Dam MA 00048 Connecticut River Basin Leyden Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lower Glen (Greenfield) Reservoir Dam is a 46-foot high stone masonry dam, spanning the lower portion of a 300-foot deep V-shaped valley. The dam has a crest approximately 95 feet long, a vertical downstream face, a service spillway and an auxiliary spillway. The upstream face of the dam is submerged, and since no construction data are available, the configuration of the upstream side of the dam is unknown. The dam was constructed around 1904 to provide a water supply reservoir for the Town of Greenfield. The reservoir has not been used for water supply purposes for more than 30 years; therefore, the dam now serves no useful purpose. The dam appears to be in poor overall condition. Several joints have opened due to structural movement of the dam as evidenced by a bulge on the downstream face of the dam located just to the east of the center dam pier at mid-height. A great deal of seepage was observed at the location of the bulge and toward the east side groin area. The test flood peak inflow to Lower Glen (Greenfield) Reservoir was computed to be 3,760 cfs. The test flood peak overflow is also 3,760 cfs, with a discharge 4.8 feet over the top of the dam. The service and auxiliary spillways have a combined discharge capacity of 740 cfs, or 20 percent of the routed test flood outflow, just prior to overtopping of the dam.

Book National Program for Inspection of Non Federal Dams  Springfield Water Works Intake  MA 00708  Connecticut River Basin  Russell  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Springfield Water Works Intake MA 00708 Connecticut River Basin Russell Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Springfield Water Works Intake dam is an approximate 295 foot long concrete masonry structure spanning a gorge in the Little River. This dam is built on a 180 foot radius and appears to be functioning as an arch. The visual inspection of this dam did not disclose any findings that indicate an unsafe condition. The spillway for this dam is able to pass a 1/2 PMF flow from its own drainage area of 3.15 s.m. It must be noted however, that the Cobble Mountain Reservoir, some 2.75 miles upstream, could affect the flow at this site. Should the Cobble Mountain Reservoir be full and overflowing its spillway at a time of flooding conditions, the flow at this site would change significantly. It is recommended that the owner have repairs made to certain spalled areas of the intake structure and wasteway.

Book National Program for Inspection of Non Federal Dams  Westfield Reservoir Dam  MA 00734  Connecticut River Basin  Montgomery  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Westfield Reservoir Dam MA 00734 Connecticut River Basin Montgomery Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 79 pages. Available in PDF, EPUB and Kindle. Book excerpt: Westfield Reservoir Dam is an earthen embankment structure about 350 feet long and 40 feet high. It has an uncontrolled overflow spillway located on the left (east) abutment and a 24-inch diameter cast-iron pipe outlet conduit which passes beneath the dam and which is valve controlled at the outlet end. Based on the visual inspection, the dam is judged to be in air condition. The following deficiencies were observed at the dam: minor but widespread slumping on the downstream slope; an animal burrow on the downstream slope; large trees near both abutments; a soft, wet area along the right bank of the downstream channel; a small sinkhole on the right side of the spillway discharge channel; lack of vegetation on the crest of the dam; inoperable valves on the downstream end of the outlet conduit; and no valve or other means of regulating or shutting off flow at the intake end of the outlet conduit. With the stoplog in place, the spillway capacity of Westfield Reservoir Dam is 707 cfs, which is about 15 percent of the routed test flood outflow of 4670 cfs. With the stoplog removed, the spillway capacity is about 994 cfs, which is about 21 percent of the routed test flood outflow. The test flood would cause the dam to be overtopped by about 3.5 feet.

Book National Program for Inspection of Non Federal Dams  Northfield School Upper Reservoir Dam  MA 00051   Connecticut River Basin  Northfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Northfield School Upper Reservoir Dam MA 00051 Connecticut River Basin Northfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 96 pages. Available in PDF, EPUB and Kindle. Book excerpt: Northfield School Upper Reservoir Dam is a 45-year old earth embankment dam which impounds water for the Northfield - Mt. Hermon School and the Town of East Northfield. The dam is approximately 240 feet long and has a maximum height of about 37 feet. A gatehouse located on the top of the dam provides access to outlet works for the dam. The dam appears to be in fair condition. No obvious signs of settlement or misalignment are evident; however, clear seepage and erosion are apparent at each of the abutments and at the toe of the dam. Lack of a comprehensive operation and maintenance program is also apparent, as evidenced by the presence of small trees and brush on the dam and large trees in close proximity to the dam. In addition, only one of the outlet valves was found to be operable. (Since the date of inspection, the Owner has notified us that all of the valves have been made operable.) The test flood peak inflow to Northfield School Upper Reservoir Dam was computed to be approximately 550 cfs. The corresponding outflow was also 550 cfs and resulted in a 0.5 foot depth of flow over the dam. The spillway (with the flashboards in place) has a discharge capacity of about 180 cfs, or roughly 33 percent of the routed test flood outflow, assuming the reservoir pool is at the top of the dam. Assuming the flashboards are removed or fail prior to overtopping of the dam, the spillway capacity would then be approximately 790 cfs or about 44 percent in excess of the routed test flood outflow.

Book National Program for Inspection of Non Federal Dams  Lower Roberts Meadow Reservoir Dam  MA 00753   Connecticut River Basin  Northampton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lower Roberts Meadow Reservoir Dam MA 00753 Connecticut River Basin Northampton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 135 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lower Roberts Meadow Reservoir Dam is an earthfill embankment with a maximum height of 22.7 feet and a greatly curved crest, 550 feet long and 10 feet wide. A concrete and stone masonry spillway about 50 feet long, 14 feet high, and a freeboard of 9.3 feet is located near the northeast end of the embankment. Concrete and stone masonry training walls flank the spillay. A concrete low level intake structure with a manully controled slide gate is located about 180 feet west of the spillway. Phase I inspection and evaluation of the Lower Roberts Meadow Reservoir Dam does not indicate conditions which would constitute an immediate hazard to human life or property. Based on engineering judgment and the performance of the earth embankment and the outlet works, the project is considered to be in good condition. The project has a number of deficiencies which, if not remedied, have the potential for developing into hazardous conditions. It is estimated that 23% of the PMF over the combined drainage area could be processed by the combined Middle and Lower Reservoir storage and spillway capacities without overtooping the Lower Dam.

Book National Program for Inspection of Non Federal Dams  Patch Reservoir Dam  MA 00122   Blackstone River Basin  Worcester  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Patch Reservoir Dam MA 00122 Blackstone River Basin Worcester Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 66 pages. Available in PDF, EPUB and Kindle. Book excerpt: Patch Reservoir Dam consists of a stone masonry spillway and earth dike. The spillway is about 6 feet high and 70 feet long. The earth dike has a maximum height of 11 feet and is about 200 feet long. Generally, the dike and spillway are considered to be in fair condition. Based on size and hazard classification, the test flood is considered to be one half of the PMF.

Book National Program for Inspection of Non Federal Dams  Northampton Reservoir  Upper Dam   MA 00521   Connecticut River Basin  Whately  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Northampton Reservoir Upper Dam MA 00521 Connecticut River Basin Whately Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 94 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam is a 940 foot long earth embankment dam with a concrete spillway. It is recommended that the areas of erosion both on the upstream and downstream faces where the abutments and embankment interface be repaired. Surface water in these areas should be redirected to prevent future erosion. The riprap on the upstream face should be extended to the dam's crest. The water exiting from the toe and core wall drains should be directed to a control channel and weir where the flow can be periodically measured. The 20-in capped pipe running beneath the dam to the downstream toe should be uncapped and extended to the lower reservoir. This will prevent the potential of a pressurized pipe (should the outlet gate be left open) from bursting and undermining the dam. Although the spillway can not discharge the test flood without overtopping the dam, the spillway capacity is comparatively large. Because of the hydrologic and safety relationships between this dam and the lower reservoir, it is necessary that future hydrologic studies concerning spillway capacities at either project should simultaneously encompass studies for both projects.