EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Program for Inspection of Non Federal Dams  Falls Pond Dam  MA 00865   Taunton River Basin  North Attleboro  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Falls Pond Dam MA 00865 Taunton River Basin North Attleboro Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: Falls Pond Dam is an earthfill dam with a vertical stone masonry wall on the downstream face. The dam is a maximum 19 feet high and 185 feet long including main and auxiliary spillways at the south abutment. The main spillway is separated into three bays, each 15 feet long and controlled by a steel tainter gate. The auxiliary spillway is located adjacent to the main spillway and is ungated. Generally, the dam is i fair condition. Th following are deficiencies and visible signs of distress at the site: lack of a low-level outlet for draining the pond; deterioration of the downstream stone masonry wall; slight seepage through a crack on the auxiliary spillway, and at the toe of the main spillway; spalled concrete on both spillways; missing and dislodged riprap on the upstream face of the dam; trees growing on the embankment; and the accumulation of debris on the spillways and in the discharge channel. An outflow test flood of 7,010 cfs will overtop the dam by 3.1 feet. The spillways have the capacity to discharge 55 percent of the test flood before the dam is overtopped.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1985 with total page 1224 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Whiting Pond Dam  MA 00859   Massachusetts Rhode Island Coastal Basin  North Attleboro  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Whiting Pond Dam MA 00859 Massachusetts Rhode Island Coastal Basin North Attleboro Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: Whiting Pond Dam is approximately 600 ft. long, has a maximum height of 9 ft, and includes a 13-ft. long concrete spillway. The dam is in fair condition, based on a visual examination of the structure. Although some deficiencies were noted, there no evidence of settlement, lateral movement or other signs of structural failure or other conditions which would warrant urgent remedial action. The PMF outflow of 4160 cfs (1015 csm) would overtop the spillway platform by about 2.6 ft. and most of the embankment by 1 to 1.5 ft. With the water at the level of the platform, the spillway (without flashboards) can pass 312 cfs which is 7.5 percent of the test flood.

Book National Program for Inspection of Non Federal Dams  Thirty Acre Pond Dam  MA 00423   Taunton River Basin  Brockton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Thirty Acre Pond Dam MA 00423 Taunton River Basin Brockton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: Thirty Acre Pond Dam is an earthen dam about 600 ft. long and 13 ft. high. The dam is in fair condition. The dam is considered to be small in size and has a high hazard potential. The spillway test flood selected is Probable Maximum Flood. Investigations are recommended to check the adequacy of the structure under seismic loading, etc.

Book National Program for Inspection of Non Federal Dams  Forge Pond Dam  MA 00800   Taunton River Basin  Freetown  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Forge Pond Dam MA 00800 Taunton River Basin Freetown Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a former mill pond dam about 330 ft. long. It has a maximum height of about 8 ft. Past inspection records and the lack of operating and maintenance procedures, there are several deficiencies which must be corrected to assure the continued performance of the dam. Generally, the dam is in poor condition. It is small in size with a hazard potential of high.

Book National Program for Inspection of Non Federal Dams  Mill River Dam  MA 00813   Taunton River Basin  Taunton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Mill River Dam MA 00813 Taunton River Basin Taunton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 66 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of a 120 ft. long spillway which was originally built in 1932. There are deficiencies which must be corrected to assure the continued performance of the dam. Generally, the dam is in poor condition. It has been classified as small in size with a hazard potential of high. A test flood equal to one half the probable maximum flood. Recommendations were presented for constructing additional spillway capacity at both Morey's Bridge and Mill River dams. These recommendations have not been implemented.

Book National Program for Inspection of Non Federal Dams  Lower Porter Pond Dam  MA 00424  Taunton River Basin  Brockton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lower Porter Pond Dam MA 00424 Taunton River Basin Brockton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 86 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lower Porter Dam is an ill-defined earth embankment about 200 ft. long with a maximum height of about 12 ft. and a top width averageing 15 ft. The dam appears to be in fair condition. With a classification size of small and a hazard potential of significant, the recommended range for test flood is 1/2 of the Probable Maximum Flood. The owner should implement various operational and maintenance procedures.

Book National Program for Inspection of Non Federal Dams  Longwater Pond Dam  MA 00171   Taunton River Basin  Easton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Longwater Pond Dam MA 00171 Taunton River Basin Easton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: Longwater Pond Dam is a 200-foot long, 10-foot high earth dam. The upstream face of the dam is a vertical concrete wall with earth fill at the toe, and the downstream face is a vertical stone masonry wall. The outlet works consist of a central outlet plus a side channel spillway located to the right of the outlet. The intake to the central outlet is 7 feet by 7.5 feet and controlled by a dual set of stoplogs. The crest of the side channel spillway is 1 foot wide, 85 feet long and 6 feet wide. There are deficiencies which must be corrected to assure the continued performance of this dam. The following signs of distress were noted at the site: absence of riprap on the upstream slope of the dam below the concrete wall; uncompacted earth fill adjacent to the left abutment of the outlet; scoured and eroded concrete on the outlet works; and spalling on the crest of the side channel spillway; cracking and local depressions in the pavement on the crest of the dam. The stoplogs were replaced shortly after the inspection, and the pond level returned on a higher elevation. At a second visit to the site, seepage was noted through the crest of the spillway. The spillway can discharge 50 percent of the test flood.

Book National Program for Inspection of Non Federal Dams  Muddy Cove Pond Dam  MA 00793  Taunton River Basin  Dighton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Muddy Cove Pond Dam MA 00793 Taunton River Basin Dighton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 75 pages. Available in PDF, EPUB and Kindle. Book excerpt: Muddy Cove Pond Dam is approximately 985 feet long including the spillway and has a maximum height of approximately 32 feet. It consists of an embankment with riprap wave protection on the upstream face and a loamed and seeded crest and downstream face. The spillway is located approximately two thirds of the distance across the dam from the left abutment. The facility is considered in good condition. There are no obvious signs of impending failure or conditions which would warrant urgent remedial measures. The estimated test flood stage is about 2.7 feet below the spillway abutments. An investigation is recommended to evaluate the observed seepage at the toe of the dam embankment. Recommended remedial measures include the removal of brush from riprap and along spillway walls, restoration of eroded areas along spillway walls and gatehouse, filling of animal burrows, the monitoring of riprap erosion and seepage at embankment toe, and maintenance of the gatehouse door and reservoir sluice gate.

Book National Program for Inspection of Non Federal Dams  Chartley Pond Dam  MA 00814   Taunton River Basin  Norton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Chartley Pond Dam MA 00814 Taunton River Basin Norton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: Chartley Pond Dam is a 200-foot long 10-foot high earthfill dam built in the 1800's. A two-lane paved roadway is the crest of the dam while the downstream face includes a concrete wall and portions of the foundations for two structures. The embankment is in good condition but minor maintenance is required. Water discharges through a small outlet controlled by stop logs. An outlet at the dam for a water wheel is blocked and abandoned. An outlet controlled by removable stop logs functions as the spillway for the dam. Hydraulic analyses indicate that the outlet can discharge a flow of 1;70 cfs before overtopping the dam at El 105.6. This discharge represents 14 percent of the outflow test flood test flood discharge of 1,230 cfs. The outflow test flood which crests at EL 107.3 will overtop the dam by 1.7 feet. Draining the pond to El 96.5 prior to the outflow test flood will not appreciably reduce the amount of overtoping. The outlet cannot pass the test flood even with all stop logs removed, and overtopping of 1.2 feet will occur.

Book National Program for Inspection of Non Federal Dams  Prospect Hill Reservoir  MA 00811   Taunton River Basin  Taunton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Prospect Hill Reservoir MA 00811 Taunton River Basin Taunton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: Prospect Hill Reservoir is impounded by a rectangular, concrete-lined earth embankment. The reservoir, which was built in 1956, measures 604 feet by 274 feet. The embankment is about 1,200 feet long with a maximum height of 25 feet and side slopes at 2:1 (horizontal to vertical). There are two high-level overflow drains and two low-level drains which connect to a single 12-inch outlet conduit. The outlet conduit leads 200 feet downhill to an overflow pond with 1 mil. gal. capacity. The reservoir and embankment are generally in good condition and well maintained. The following deficiencies were observed at the site: growth of trees on the slopes of the embankment, slight leakage from some joints on the conduits, an leakage from a gate valve into the outlet conduit. It was also noted that a greater than expected amount of seepage is occuring in the under drain system. Under normal operating conditions, the reservoir cna discharge 100 percent of the test flood without overflowing the rim.

Book National Program for Inspection of Non Federal Dams  Cook Pond Dam  MA 00123   Blackstone River Basin  Worcester  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Cook Pond Dam MA 00123 Blackstone River Basin Worcester Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 133 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Singletary Pond Dam  MA 00144   Blackstone River Basin  Millbury  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Singletary Pond Dam MA 00144 Blackstone River Basin Millbury Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Browns Pond Dam MA 00192  North River Basin  Peabody  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Browns Pond Dam MA 00192 North River Basin Peabody Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: Browns Pond Dam is an earthfill embankment about 200-feet long, with a maximum height of about 5 feet and a crest of about 10 feet. The dam has inadequacies and deficiencies which, if not remedied, have the potential for developing into hazardous conditions. The dam is classified as small in size with a low hazard potential.

Book National Program for Inspection of Non Federal Dams  Upper Porter Pond Dam MA 00425  Taunton River Basin  Brockton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Upper Porter Pond Dam MA 00425 Taunton River Basin Brockton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 53 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a gravel and clay fill embankment about 340 feet long with a maximum height of about 11 feet and a top width averaging 80 feet. The dam appears to be in fair condition. The upstream slope and crest are well maintained. It has a classification of small in size and a significant hazard potential. The owner should retain the services of a registered professional engineer for various purposes.

Book National Program for Inspection of Non Federal Dams  Spring Pond Dam MA 00193  North River Basin  Peabody  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Spring Pond Dam MA 00193 North River Basin Peabody Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 89 pages. Available in PDF, EPUB and Kindle. Book excerpt: Spring Pond Dam is an earthfill embankment with a maximum height of about 10 feet and a relatively straight crest about 225 feet long, averaging about 20 feet wide. The dam is considered to be in good condition. The dam is classified as small in size with a significant hazard potential.