EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Program for Inspection of Non Federal Dams  Abbey Lake Dam MA 00305  Connecticut River Basin  Sandisfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Abbey Lake Dam MA 00305 Connecticut River Basin Sandisfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 154 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is earthfill embankment about 210 ft. long and 39.5 ft. high and has a concrete principal spillway which maintains the recreation pool level and controls the release of stored floodwater, and a 50 ft. wide earth excavated emergency spillway channel around the left abutment. The dam appears to be in generally good condition. The classification of the dam is small in size and the hazard potential is high.

Book National Program for Inspection of Non Federal Dams  West Lake Dam  MA 00288   Connecticut River Basin  Sandisfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams West Lake Dam MA 00288 Connecticut River Basin Sandisfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 181 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is an earthfill embankment about 920 feet in length, and 25 feet in height and has a reinforced concrete principle spillway, The dam has been rated fair. It has a classification of intermediate size and high hazard. Failure of the dam would pose a serious threat to about 11 houses, two major highway bridges, and three secondary road crossings.

Book National Program for Inspection of Non Federal Dams  North Silver Lake Dam  MA 00307   Connecticut River Basin  Sandisfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams North Silver Lake Dam MA 00307 Connecticut River Basin Sandisfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 130 pages. Available in PDF, EPUB and Kindle. Book excerpt: North Silver Dam is about 1550 feet long with a maximum height of 76 feet. The dam has a chimney drain and a rock toe for internal drainage. The dam has been classified as intermediate in size with a high hazard potential. The dam is considered to be in fair condition. A major breach of the dam could cause appreciable damage to roads, bridges and residences in the downstream area.

Book National Program for Inspection of Non Federal Dams  Clam Lake Dam  MA 01052   Connecticut River Basin  Sandisfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Clam Lake Dam MA 01052 Connecticut River Basin Sandisfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 136 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is an earthfill embankment about 950 feet in length, and 94 feet in height, has a reinforced concrete principal spillway which is designed to maintain the recreation pool level and control the release of stored floodwater, and a 385 foot wide earth fill and earth excavated emergency spillway channel around the left abutment. No water is presently impounded by the dam because of serious deficiencies related to the soundness of the principal spillway structure and emergency spillway side slopes. The dam and appurtenances were found to be in POOR condition. The visual inspection indicated that the emergency spillway slopes are unstable, the downstream emergency spillway slopes have eroded, the principal spillway structure is failing at the transition, the pond drain intake structure is defective and the upstream and downstream slopes of the dam show erosion. Routing the test flood through the reservoir, with the initial pool level at the normal recreation stage, resulted in test outflow of 14,960 CFS which does not exceed the capacity of the spillways.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1985-08 with total page 584 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  South Silver Floodwater Retarding  MA 00702   Connecticut River Basin  Sandisfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams South Silver Floodwater Retarding MA 00702 Connecticut River Basin Sandisfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is comprised of an earth embankment, a central principal spillway, and and emergency spillway. The embankment has a maximum fill height of approximately 31 feet and a crest length of 170 feet. The principal spillway consists of a concrete intake riser structure, an impact basin, and a 30 inch diameter reinforced concrete connector pipe. The visual inspection indicated the dam to be in generally good condition. The test flood (1/2 PMF) will produce an inflow of 1620 cfs. The resulting outflow through the spillway is 1120 cfs at elevation 1189, a surcharge of 5.5 feet. The spillway has a capacity of 1920 cfs at elevation 1191, top of the dam. The dam is in generally good condition. It is felt, however, that certain items need attention. These include extension of riprap protection along the dike forming the left training wall of the emergency spillway and refastening of two trash angles on the intake riser.

Book National Program for Inspection of Non Federal Dams  Mountain Lake Dam  MA 00530   Connecticut River Basin  Chicopee  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Mountain Lake Dam MA 00530 Connecticut River Basin Chicopee Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 122 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is about 200 ft. long, having a maximum height of about 28 ft. It consists of an earth embankment with no upstream shore protection and natural vegetation on the crest and downstream face. It is in poor condition. It is small in size and has a high hazard potential classification.

Book National Program for Inspection of Non Federal Dams  Indian Lake Dam  MA 01051  Connecticut River Basin  Becket  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Indian Lake Dam MA 01051 Connecticut River Basin Becket Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 105 pages. Available in PDF, EPUB and Kindle. Book excerpt: Indian Lake Dam is an earth embankment about 460 feet long with a height of about 15 feet above the brook channel. Near the center of the embankment is a reinforced concrete gravity wall spillway and control structure. The spillway is a free overfall straight drop type with a reinforced concrete, stone lined stilling basin and outfall channel, and provisions for flashboards or stop logs on the crest. A 30 inch square reservoir drain with hand operated sluice gate is also provided in the spillway structure. The embankment is in fair condition. The embankment is not at design height and downstream embankment protection has not been provided. The spillway is in fair condition. The spillway structure shows signs of poor workmanship and deficiencies which could eventually create hazards. Some leakage is apparently occurring under the embankment, but does not appear to be hazardous. Routing the flood flow through the reservoir starting at normal water level, but assuming that the flashboards would go out, the spillway would carry the estimated maximum outflow of 750 cfs with about 1.2 feet freeboard if the embankment is completed to design height.

Book National Program for Inspection of Non Federal Dams  Silver Lake Dam  MA 00066   Connecticut River Basin  Springfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Silver Lake Dam MA 00066 Connecticut River Basin Springfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 94 pages. Available in PDF, EPUB and Kindle. Book excerpt: Silver Lake Dam is an earthfill embankment about 85 feet long, 12 feet high with a crest width averaging about 30 feet. The project appears to be in fair condition. Since the dam is classified as small in size, with a significant hazard potential, the test flood is one half the PMF. (Author).

Book National Program for Inspection of Non Federal Dams  Kendall Company Number 1 Dam  MA 00047   Connecticut River Basin  Colrain  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Kendall Company Number 1 Dam MA 00047 Connecticut River Basin Colrain Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: Kendall Company No. 1 Dam is a run of river facility that diverts water into a flume leading to the company's plant. Within the river channel there is a rock-filled, timber crib spillway structure 238 feet long. This overflow structure has a topwidth of 5 feet, and it has 2.9-foot high flashboards on its crest. The height of the dam, measured at the abutments of the spillway overflow section, is 24 feet. Based on visual inspection, the dam is judged to be in poor condition. The major concerns with respect to the integrity of the dam are deterioration of the wood crib abutment structure at the right end of the overflow section; trees growing in the wood crib abutment structure, on the upstream and downstream sides of the right abutment and on the dike; hazards resulting from the existing breach in the dike; lack of adequate erosion protection on the bank of the downstream channel near the left abutment; trees growing on the strip of ground between the dry stone masonry wall, on the left side of the downstream channel, and the right side of the concrete-lined flume on the left side of the valley; and lack of a low-level outlet for the dam. The spillway capacities are, respectively, about 22 percent and 38 percent of the routed test flood outflows. The depths of overtopping of the dam and dike that would occur during the test flood are 4.2 feet with the flashboards in place, and 3.5 feet with the flashboards removed.

Book National Program for Inspection of Non Federal Dams  Lake Rohunta  MA 00012   Connecticut River Basin  Athol  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lake Rohunta MA 00012 Connecticut River Basin Athol Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 85 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of a central 46 foot wide concrete spillway flanked by earthen embankments. The western embankment has a length of 250 feet and the eastern embankment has a length of about 280 feet. The dam has a size classification of intermediate and a hazard classification of low. The dam is in generally good condition. It is felt, however, that certain items which are generally normal maintenance and operational procedures need attention. The spillway will pass only 12% of the test flood outflow; the embankment will be overtopped by 3 feet.

Book National Program for Inspection of Non Federal Dams  Powder Mill Pond Dam  MA 00092   Connecticut River Basin  South Barre  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Powder Mill Pond Dam MA 00092 Connecticut River Basin South Barre Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 107 pages. Available in PDF, EPUB and Kindle. Book excerpt: Powder Mill Pond Dam is located on the Ware River approximately one mile upstream of South Barre, Massachusetts. The dam, reconstructed in 1908 to generate electric power for the Barre Wool Combing Company, consists of an upgated concrete spillway approximately 125 ft. long and 20 ft. high, a short emergency spillway and an outlet canal with two inoperative timber gates. The dam was extensively modified during the 1930's. Based on a visual examination of the structure, the facility is in fair to poor condition. Nevertheless, there was no evidence of structural failure or other conditions which would warrant urgent remedial treatment. Based on size and hazard classifications in accordance with Corps of Engineers guidelines, the test flood for this dam is the Probable Maximum Flood (PMF). The PMF outflow of 48,160 cfs would overtop the dam by 5.15 ft. With the water level at top of dam, the main and emergency spillways can pass 17,940 cfs which is 37 percent of the test flood.

Book National Program for Inspection of Non Federal Dams  Lake Ellis Dam  MA 00005   Connecticut River Basin  Athol  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lake Ellis Dam MA 00005 Connecticut River Basin Athol Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Ellis Dam is an earth embankment about 140 feet long with a maximum height of about 11 feet. The dam is in fair condition. The culvers under the highway are capable of discharging 2,400 cfs which is equivalent to 77% of the PMF before the highway embankment would be overtopped. The full PMF event would overtop the highway embankment by approximately one foot. (Author).

Book National Program for Inspection of Non Federal Dams  Lake Whittemore Dam  MA 00699   Connecticut River Basin  Spencer  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lake Whittemore Dam MA 00699 Connecticut River Basin Spencer Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Whittemore Dam is approximately 300 ft. long. It consists of a small earth embankment approximately 15 ft. high and an ungated concrete ogee spillway weir. The dam is generally in fair to good condition. There are no obvious signs of failure or conditions which would warrant urgent remedial treatment. Hydraulic analyses indicated that the spillway will pass the spillway design flood without overtopping the dam. The spillway design flood selected for this structure was the probable maximum flood. Recommendations for remedial work include clearing of trees and brush, repair of the downstream fieldstone wall and dry-laid stone wall adjacent to the gate valve, and minor earthwork and rip-rap repairs.

Book National Program for Inspection of Non Federal Dams  Ware Industries Main  Upper  Dam  MA 00594   Connecticut River Basin  Ware  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Ware Industries Main Upper Dam MA 00594 Connecticut River Basin Ware Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Ware Industries Man (Upper) Dam consists of a main spillway 115 ft. long and approximately 34 ft. high, a spillway extension 50 ft. long and 4 ft. high, a concrete emergency spillway, a gate house with control works to a canal, and a 115 ft. long overflow weir from the canal. Based on a visual examination of the structure, the project is in good to fair condition. There was no evidence of structural failure or other conditions which would warrant urgent remedial action. The PMF outflow of 109,200 cfs would overtop the dam by 11.25 ft. With the water level at the top of dam, the spillway system can pass 7980 cfs which is 7.3 percent of the test flood.

Book National Program for Inspection of Non Federal Dams  McLean Reservoir  MA 00539   Connecticut River Basin  Holyoke  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams McLean Reservoir MA 00539 Connecticut River Basin Holyoke Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 700 foot, 35 foot high earthfill embankment and a 920 foot long, 15 foot high earth-fill dike a gatehouse with outlet controls and a 10 foot wide concrete arch emergency spillway. With the water lever assumed to spillway crest at time of test flood, spilway discharge of about 30 cfs woudl occur. The reservoir woudl be surcharged to elevation 433, four feet above the spillway crest and two feet below the dam crest. The dam will not be overtopped. The dam is generally in fair condition. Remedial measures consist of removal of all brush and trees from the downstream slope of the main dam and spillway channel and repair of spalled and deteriorated concrete on the emergency spillway.