EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Technical Abstract Bulletin

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1981 with total page 212 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Lambertville Water Company Dam  NJ 00775  Delaware River Basin  Swan Creek  Hunterdon County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Lambertville Water Company Dam NJ 00775 Delaware River Basin Swan Creek Hunterdon County New Jersey Phase I Inspection Report written by Abraham Perera and published by . This book was released on 1981 with total page 63 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lambertville Water Co. Dam (Middle Reservoir) is located on Swan Creek about 3,000 feet upstream from the Lambertville boundary line in Hunterdon County, New Jersey. The visual inspection of Lambertville Water Co. Dam took place on August 27, 1980 with engineering personnel of the water company present to assist the inspection team and answer questions pertaining to the dam. The dam was found to be in a generally fair overall condition although concrete deterioration and excessive growth on the downstream embankment were noted.

Book Lambertville Water Co  Dam  N J  00775

Download or read book Lambertville Water Co Dam N J 00775 written by Abraham Perera and published by . This book was released on 1981 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1981 with total page 734 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Nishisakwick Creek Dam  NJ 00 129   Delaware River Basin  Nishisakwick Creek  Hunterdon County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Nishisakwick Creek Dam NJ 00 129 Delaware River Basin Nishisakwick Creek Hunterdon County New Jersey Phase I Inspection Report written by Anthony G. Posch and published by . This book was released on 1979 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Penwell Mill Dam  NJ 00781   Delaware River Basin  Musconetong River  Hunterdon County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Penwell Mill Dam NJ 00781 Delaware River Basin Musconetong River Hunterdon County New Jersey Phase I Inspection Report written by NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON DIV OF WATER RESOURCES. and published by . This book was released on 1981 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  No Name Dam Number 31  NJ 00519   Raritan River Basin  Cramers Creek  Hunterdon County  New Jersey  Phase 1 Inspection Report

Download or read book National Dam Safety Program No Name Dam Number 31 NJ 00519 Raritan River Basin Cramers Creek Hunterdon County New Jersey Phase 1 Inspection Report written by Anthony G. Posch and published by . This book was released on 1979 with total page 87 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Amwell Number 2 Dam  NJ00522   Delaware River Basin  Tributary of Alexauken Creek  Hunterdon County  New Jersey  Phase 1 Inspection Report

Download or read book National Dam Safety Program Amwell Number 2 Dam NJ00522 Delaware River Basin Tributary of Alexauken Creek Hunterdon County New Jersey Phase 1 Inspection Report written by Richard J. McDermott and published by . This book was released on 1980 with total page 84 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Smithville Dam  NJ 00043  Delaware River Basin  North Branch Rancocas Creek  Burlington County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Smithville Dam NJ 00043 Delaware River Basin North Branch Rancocas Creek Burlington County New Jersey Phase I Inspection Report written by Richard J. McDermott and published by . This book was released on 1981 with total page 81 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. Based on visual inspection, available records, calculations and past operational performance, Smithville Dam, a high hazard potential structure, is judged to be in fair overall condition. The dam's spillway is considered inadequate because a flow equivalent to 9 percent of the Spillway Design Flood - SDF- would cause the dam to be overtopped. (The SDF, in this instance, is one half of the Probable Maximum Flood). The decision to consider the spillway 'inadequate' instead of 'seriously inadequate' is based on the determination that dam failure resulting from overtopping would not significantly increase the hazard to loss of life downstream from the dam from that which would exist just before overtopping failure.

Book National Dam Safety Program  Morristown Reservoir Dam  NJ 00352   Delaware River Basin  Harmony Brook  Morris County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Morristown Reservoir Dam NJ 00352 Delaware River Basin Harmony Brook Morris County New Jersey Phase I Inspection Report written by Dennis J. Leary and published by . This book was released on 1979 with total page 104 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Schiller Pond Dam  NJ00153   Delaware River Basin  Tributary Alexauken Creek  Hunterdon County New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Schiller Pond Dam NJ00153 Delaware River Basin Tributary Alexauken Creek Hunterdon County New Jersey Phase I Inspection Report written by John P. Talerico and published by . This book was released on 1981 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. an assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Allentown Dam  NJ 00308   Delaware River Basin  Doctors Creek  Monmouth County  New Jersey  Phase 1 Inspection Report

Download or read book National Dam Safety Program Allentown Dam NJ 00308 Delaware River Basin Doctors Creek Monmouth County New Jersey Phase 1 Inspection Report written by Anthony G. Posch and published by . This book was released on 1979 with total page 99 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report(Author).

Book National Dam Safety Program  Warren Mill Dam   NJ00765  Delaware River Basin  Musconetcong River  Warren Hunterdon Counties  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Warren Mill Dam NJ00765 Delaware River Basin Musconetcong River Warren Hunterdon Counties New Jersey Phase I Inspection Report written by Abraham Perera and published by . This book was released on 1981 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is a prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Sylvan Lake Dam  NJ 00151   Delaware River Basin  Mill Stream  Burlington County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Sylvan Lake Dam NJ 00151 Delaware River Basin Mill Stream Burlington County New Jersey Phase I Inspection Report written by John J. Williams and published by . This book was released on 1979 with total page 117 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  West Branch Reservoir  NJ 00372  Delaware River Basin  West Branch Middle Brook  Somerset County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program West Branch Reservoir NJ 00372 Delaware River Basin West Branch Middle Brook Somerset County New Jersey Phase I Inspection Report written by Robert J. Jenny and published by . This book was released on 1979 with total page 111 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Wrights Mill Dam  NJ 00432   Delaware River Basin  Raccoon Creek  Gloucester County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Wrights Mill Dam NJ 00432 Delaware River Basin Raccoon Creek Gloucester County New Jersey Phase I Inspection Report written by F. Keith Jolls and published by . This book was released on 1979 with total page 55 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 55 year-old earth embankment approximately 120 feet in length with a bridged spillway. An asphalt pavement (Elmer-Barnsboro Rd.) 30 feet in width runs along the crest. The spillway is a three sided concrete drop inlet with removable 3 in.-6 in. wide timber stoplogs on the front face. Steel sheet piling extends along the shoulder line on the upstream face of the dam on each side of the drop inlet. The maximum height of the dam is 13 feet at the culvert outlet. Wrights Mill Dam is assessed to be in a good overall condition and no physically detrimental conditions were observed but further hydraulic studies are recommended in the future to ascertain more accurately the capacity of the spillway. Overtopping of the dam could lead to a downstream embankment washout. Remedial actions recommended to be undertaken in the near future include (1) remove the dead trees and root systems on the downstream embankment slopes, (2) place riprap in the downstream channel and (3) place slope protection at the ends of the steel sheeting and downstream culvert wingwalls. The capacity of the spillway will accommodate only 24% of the one-half PMF design flood.