EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Maintenance and Operation of the U S  DOE Alternative Fuel Center  Final Subcontract Report  5 August 1994  4 August 1995

Download or read book Maintenance and Operation of the U S DOE Alternative Fuel Center Final Subcontract Report 5 August 1994 4 August 1995 written by and published by . This book was released on 1996 with total page 39 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Alternative Fuel Center (AFC) was established by the US Department of Energy (DOE) as part of the Alternative Fuel Utilization Program (AFUP). The AFC is designed to provide drum quantities of finished transportation fuels from a variety of sources. DOE funded the design, construction, and installation of a hydrogenation pilot plant capable of performing a range of hydrotreating, reforming, and hydrocracking operations. Southwest Research Institute provided the building, utilities, and laboratory and safety systems needed for the pilot plant. The AFC work reported here contributes to the two primary objectives of the AFUP: data for alternative-fuel-capable vehicles to enhance energy security, and data for controlling emissions for improved air quality.

Book Maintenance and Operation of the U S  DOE Alternative Fuel Center  Final Subcontract Report  5 August 1994  4 August 1995

Download or read book Maintenance and Operation of the U S DOE Alternative Fuel Center Final Subcontract Report 5 August 1994 4 August 1995 written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Alternative Fuel Center (AFC) was established by the US Department of Energy (DOE) as part of the Alternative Fuel Utilization Program (AFUP). The AFC is designed to provide drum quantities of finished transportation fuels from a variety of sources. DOE funded the design, construction, and installation of a hydrogenation pilot plant capable of performing a range of hydrotreating, reforming, and hydrocracking operations. Southwest Research Institute provided the building, utilities, and laboratory and safety systems needed for the pilot plant. The AFC work reported here contributes to the two primary objectives of the AFUP: data for alternative-fuel-capable vehicles to enhance energy security, and data for controlling emissions for improved air quality.

Book Maintenance and Operation of the U S  DOE Alternative Fuel Center

Download or read book Maintenance and Operation of the U S DOE Alternative Fuel Center written by and published by . This book was released on 1993 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Alternative Fuels Utilization Program (AFUP) of the Office of Energy Efficiency and Renewable Energy has investigated the possibilities arid limitations of expanded scope of fuel alternatives and replacement means for transportation fuels from alternative sources. Under the AFUP, the Alternative Fuel Center (AFC) was created to solve problems in the DOE programs that were grappling with theutilization of shale oil and coal liquids for transportation fuels. This report covers the first year of the 3-year contract. The principal objective was to assist the AFUP in accomplishing its general goals with two new fuel initiatives selected for tasks in the project year: (1) Production of low-sulfur, low-olefin catalytically cracked gasoline blendstock (2) Production oflow-reactivity/low-emission gasoline. Supporting goals included maintaining equipment in good working order, performing reformulated gasoline tests, and meeting the needs of other government agencies and industries for fuel research involving custom processing, blending, or analysis of experimental fuels.

Book Current Abstracts

Download or read book Current Abstracts written by and published by . This book was released on 1996-07 with total page 92 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1996 with total page 710 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Synerjy

Download or read book Synerjy written by and published by . This book was released on 1996 with total page 618 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Maintenance and Operation of the U S  DOE Alternative Fuel Center

Download or read book Maintenance and Operation of the U S DOE Alternative Fuel Center written by Jimell Erwin and published by . This book was released on 1993 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Scientific and Technical Aerospace Reports

Download or read book Scientific and Technical Aerospace Reports written by and published by . This book was released on 1995 with total page 538 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lists citations with abstracts for aerospace related reports obtained from world wide sources and announces documents that have recently been entered into the NASA Scientific and Technical Information Database.

Book Operation and Maintenance of DOE PETC Combustion Test Facility  Final Technical Progress Report  December 1  1987  March 31  1989

Download or read book Operation and Maintenance of DOE PETC Combustion Test Facility Final Technical Progress Report December 1 1987 March 31 1989 written by and published by . This book was released on 1989 with total page 20 pages. Available in PDF, EPUB and Kindle. Book excerpt: The contract was divided into eight programs: alternative fuels/in-house research and development; flue gas cleanup research and development; advanced research and technology development; analytical chemistry support; advanced combustion technology; coal preparation support; continuous hydrotreaters, co-processing/coal liquids upgrading; and methane activation. These programs developed as a result of various changes made to the original eight programs. (1) A new task order, entitled Evaluation of Combined SO2/NO2 Removal Processes (NOXSO), was added to the Flue Gas Cleanup Research and Development Program as part of the new contract. (2) Mechanics of Ash Deposition was developed into Advanced Research and Technology Development, which still included operation of a laser diagnostics laboratory for other test programs, and a drop tube furnace. (3) Coal Preparation Laboratory Support was concluded during this contract, and development of a coal preparation process research facility was initiated. (4) Molten Caustic Leached Coal research was concluded on April 1, 1988, and subsequently was eliminated from the contract. (5) Methane Activation research was added as a new task order. (6) On September 1, 1988, new task orders were issued which affected budget reporting but not the scope of work.

Book Final Audit Report of Remedial Action Construction at the UMTRA Project Site  Gunnison  Colorado  Revision 0

Download or read book Final Audit Report of Remedial Action Construction at the UMTRA Project Site Gunnison Colorado Revision 0 written by and published by . This book was released on 1996 with total page 37 pages. Available in PDF, EPUB and Kindle. Book excerpt: The final audit report for remedial action at the Gunnison, Colorado Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the U.S. Department of Energy (DOE) and the Technical Assistance Contractor (TAC); and on-site construction reviews (OSCR) performed by the U.S. Nuclear Regulatory Commission (NRC). Two radiological surveillances and four radiological audits were performed at the Gunnison site. The surveillances were performed on 16 to 19 September 1992 and 28 June to 1 July 1993. The radiological audits were performed on 4 to 7 October 1993; 13 to 16 June 1994; 19 to 22 September 1994 and 10 to 12 July 1995. The surveillances and audits resulted in 79 observations. Thirty-four of the observations raised DOE concerns that were resolved on the site or through subsequent corrective action. All outstanding issues were closed on 12 July 1995. The radiological surveillances and audits are discussed in Section 2.0 of this report. Ten QA in-process surveillances were performed at the Gunnison UMTRA Project site. The surveillances were performed on 24 to 25 September 1992, 7 to 9 July 1993, 29 October 1993, 27 to 28 June 1994, 31 October to 1 November 1994, 19 to 20 June 1 995, 20 to 21 July 1995, 17 to 18 August 1995, 20 September 1995, and 11 to 13 October 1995. The surveillances resulted in 100 observations. Six observations contained recommendations that required responses from the Remedial Action Contractor (RAC). Ninety-five observations contained a recommendation that required no response. All outstanding issues were closed on 8 January 1996. The QA in-process surveillances are discussed in Section 3.0 of this report.

Book Federal Alternative Fuel Program Light Duty Vehicle Operations  Second Annual Report Ot Congress for Fiscal Year 1992  U S  Department of Energy  July 1993

Download or read book Federal Alternative Fuel Program Light Duty Vehicle Operations Second Annual Report Ot Congress for Fiscal Year 1992 U S Department of Energy July 1993 written by and published by . This book was released on with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Final Technical Report

Download or read book Final Technical Report written by Jim Hinde and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The City of Albuquerque Aviation Department began planning for an alternative fuels facility in 1999 and began actively pursuing funding for the project in 2000. The original project scope was intended to provide a fueling station that provided unleaded gasoline, E-85, diesel, compressed natural gas (CNG) and propane. When the tragedy of 9/11 occurred, all capital projects were put on hold and then reassessed to validate needs and priorities. The alternative fuels station was scaled back to a CNG facility to: (1) Provide fuel for the common shuttle that served the rental car facilities at the airport; (2) Provide a CNG fuel center for use by all levels of government for vehicle fueling; (3) Provide another CNG facility near the interstate to improve the State network for CNG fueling; (4) Provide a backup fueling facility for the University of New Mexico and the City of Albuquerque Transit Department who were also using CNG vehicles; and (5) Provide another fueling facility accessible to the general public.

Book Operation and Maintenance of DOE PETC Combustion Test Facility

Download or read book Operation and Maintenance of DOE PETC Combustion Test Facility written by and published by . This book was released on 1989 with total page 20 pages. Available in PDF, EPUB and Kindle. Book excerpt: The contract was divided into eight programs: alternative fuels/in-house research and development; flue gas cleanup research and development; advanced research and technology development; analytical chemistry support; advanced combustion technology; coal preparation support; continuous hydrotreaters, co-processing/coal liquids upgrading; and methane activation. These programs developed as a result of various changes made to the original eight programs. (1) A new task order, entitled Evaluation of Combined SO2/NO2 Removal Processes (NOXSO), was added to the Flue Gas Cleanup Research and Development Program as part of the new contract. (2) Mechanics of Ash Deposition was developed into Advanced Research and Technology Development, which still included operation of a laser diagnostics laboratory for other test programs, and a drop tube furnace. (3) Coal Preparation Laboratory Support was concluded during this contract, and development of a coal preparation process research facility was initiated. (4) Molten Caustic Leached Coal research was concluded on April 1, 1988, and subsequently was eliminated from the contract. (5) Methane Activation research was added as a new task order. (6) On September 1, 1988, new task orders were issued which affected budget reporting but not the scope of work.

Book Business Management for Biodiesel Producers

Download or read book Business Management for Biodiesel Producers written by Jon Harlan Van Gerpen and published by . This book was released on 2004 with total page 220 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Final Audit Report of Remedial Action Construction at the UMTRA Project Ambrosia Lake  New Mexico  Site

Download or read book Final Audit Report of Remedial Action Construction at the UMTRA Project Ambrosia Lake New Mexico Site written by and published by . This book was released on 1995 with total page 30 pages. Available in PDF, EPUB and Kindle. Book excerpt: The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE.

Book Operation and Maintenance of DOE

Download or read book Operation and Maintenance of DOE written by and published by . This book was released on 1989 with total page 20 pages. Available in PDF, EPUB and Kindle. Book excerpt: The contract was divided into eight programs: alternative fuels/in-house research and development; flue gas cleanup research and development; advanced research and technology development; analytical chemistry support; advanced combustion technology; coal preparation support; continuous hydrotreaters, co-processing/coal liquids upgrading; and methane activation. These programs developed as a result of various changes made to the original eight programs. (1) A new task order, entitled Evaluation of Combined SO2/NO2 Removal Processes (NOXSO), was added to the Flue Gas Cleanup Research and Development Program as part of the new contract. (2) Mechanics of Ash Deposition was developed into Advanced Research and Technology Development, which still included operation of a laser diagnostics laboratory for other test programs, and a drop tube furnace. (3) Coal Preparation Laboratory Support was concluded during this contract, and development of a coal preparation process research facility was initiated. (4) Molten Caustic Leached Coal research was concluded on April 1, 1988, and subsequently was eliminated from the contract. (5) Methane Activation research was added as a new task order. (6) On September 1, 1988, new task orders were issued which affected budget reporting but not the scope of work.

Book Final Audit Report of Remedial Action Construction at the UMTRA Project Falls City  Texas  Site

Download or read book Final Audit Report of Remedial Action Construction at the UMTRA Project Falls City Texas Site written by and published by . This book was released on 1995 with total page 29 pages. Available in PDF, EPUB and Kindle. Book excerpt: This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete.