EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Jefferson Lab IR FEL Cryomodule Modifications and Test Results

Download or read book Jefferson Lab IR FEL Cryomodule Modifications and Test Results written by and published by . This book was released on 1997 with total page 4 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Infrared Free Electron Laser being constructed at the Thomas Jefferson National Accelerator Facility will require a 42 MeV, 5 mA electron accelerator. The accelerator design requires a 10 MeV injector and a two pass 32 MeV linac, one pass for acceleration and one pass for energy recovery. In order to minimize the cost of the linac, standard CEBAF 1497 MHZ Superconducting Radio Frequency cavities and cryomodules are being used with minimal changes. Two SRF cavities, housed in a quarter cryomodule, operate at a nominal 10 MV/m to provide the injector energy. The linac is composed of one cryomodule, housing eight SRF cavities operating at an average gradient of 8 MV/m. The modifications to the cryomodule are being made to handle the higher beam current, to improve RF control, and to increase machine reliability. The modifications to the higher order mode (HOM) loads, cavity tuners, cavity beam line, warm and cold RF windows, and cryogenic shield are described. Test results from the injector quarter cryomodule are also presented.

Book Jefferson Lab IR FEL Cyromodule Modifications and Test Results  May 1997

Download or read book Jefferson Lab IR FEL Cyromodule Modifications and Test Results May 1997 written by Mark Wiseman and published by . This book was released on 1997 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Performance of the FEL Cryomodules

Download or read book Performance of the FEL Cryomodules written by and published by . This book was released on 1998 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Thomas Jefferson National Accelerator Facility (Jefferson Lab, formerly known as CEBAF) is building a highly efficient, kilowatt-level infrared free-electron laser, the IR Demo FEL. The IR FEL uses superconducting radio-frequency (SRF) cavities to accelerate the electron beam that provides energy for the laser. These cavities provide the high-gradient acceleration for the high average currents necessary for a compact FEL design. Currently, a quarter cryomodule injector and a full eight-cavity cryomodule have been installed in the FEL linac. These units were tested as part of the IR FEL commissioning process. The main focus of these tests was to determine the maximum stable operating gradient. The average maximum gradient reached by these ten cavities was 11 Mv/m. Other tests include measurement of cavity parameters such as the unloaded Q (Qo) vs. gradient, the input coupling, calibration of field probes and behavior of the tuner mechanisms. This paper presents the results of those tests.

Book Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes

Download or read book Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes written by T. Powers and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: We have installed two new cryomodules, one in the nuclear physics accelerator (CEBAF) and the other in the Free Electron Laser (FEL) of Jefferson Lab. The new cryomodules consist of 7-cell cavities with the original CEBAF cell shape and were designed to deliver gradients of 70 MV/module. Several significant design innovations were demonstrated in these cryomodules. This paper describes the production procedures, the performance characteristics of these cavities in vertical tests, results of tests in the new cryomodule test facility (CMTF) as well as the commissioning in the CEBAF tunnel and FEL. Performances and limitations after installation in the accelerators are discussed in this paper along with improvements proposed for future cryomodules.

Book Design and Fabrication of an FEL Injector Cryomodule

Download or read book Design and Fabrication of an FEL Injector Cryomodule written by M. Cole and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Advanced Energy Systems has recently completed the design of a four cavity cryomodule for use as an FEL injector accelerator on the JLAB Injector Test Stand. Fabrication is nearing completion. Four 748.5 MHz single cell superconducting cavities have been completed and are currently at Jefferson Lab for final processing and test prior to integration in the module. This paper will review the design and fabrication of the cavities and cryomodule.

Book Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade

Download or read book Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade written by and published by . This book was released on 2013 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab is nearing completion of an energy upgrade from 6 to 12 GeV. An integral part of the upgrade is the addition of ten new cryomodules, each consisting of eight seven-cell superconducting radio-frequency (SRF) cavities. An average performance of 100+MV of acceleration per cryomodule is needed to achieve the 12 GeV beam energy goal. The production methodology was for industry to provide and deliver the major components to Jefferson Lab, where they were tested and assembled into cryomodules. The production process begins with an inspection upon receiving of all major components followed by individual performance qualification testing. The SRF cavities received their final chemical processing and cleaning at Jefferson Lab. The qualified components along with all associated hardware and instrumentation are assembled, tested, installed into CEBAF and run through an integrated system checkout in preparation for beam operations. The production process is complete and one of the first completed cryomodules has successfully produced 108 MV of acceleration with a linac beam current of 465?A.

Book Results of Cavity Series Fabrication at Jefferson Laboratory for the Cryomodule  R100

Download or read book Results of Cavity Series Fabrication at Jefferson Laboratory for the Cryomodule R100 written by and published by . This book was released on 2011 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: A series production of eight superconducting RF cavities for the cryomodule R100 was conducted at JLab in 2010. The cavities underwent chemical post-processing prior to vertical high power testing and routinely exceeded the envisaged performance specifications. After cryomodule assembly, cavities were successfully high power acceptance tested. In this paper, we present the achievements paving the way for the first demonstration of 100 MV (and beyond) in a single cryomodule to be operated at CEBAF.

Book Upgrade to Cryomodule Test Facility at Jefferson Lab

Download or read book Upgrade to Cryomodule Test Facility at Jefferson Lab written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The cryomodule test facility (CMTF) was originally implemented in the late eighties for testing of a small fraction of the cryomodules during the production run for the Continuous Electron Beam Accelerator Facility [1]. The original system was built using a dedicated wiring scheme and a pair of 2 kW, 1497 MHz RF sources. This dedicated system made it difficult to test cryomodules and other RF structures of non-standard configuration. Additionally, due to a previously installed cyclotron, there were static magnetic fields in excess of 6 Gauss within the test cave, which limited the capability of the facility when measuring the quality factor of superconducting cavities. Testing of the Spallation Neutron Source cryomodules as well as future upgrades to the CEBAF accelerator necessitated that the facility be reconfigured to be flexible both with respect to RF source power and cryomodule wiring configuration. This paper will describe the implementation of a generalized wiring scheme t hat is easily adapted to different cryomodule configurations. It will also describe the capabilities of the LabView based low level RF controls and the related data acquisition systems currently being used to test cryomodules and related hardware. The high power RF source capabilities will be described. The magnetic shielding put in place in order to reduce the ambient magnetic file to levels below 50 mGauss will also be described.

Book Performance of the FEL Cryomodules

Download or read book Performance of the FEL Cryomodules written by Michael Drury and published by . This book was released on 1998 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Fiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab

Download or read book Fiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab written by C. J. Curtis and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: During the early 1990's the Continuous Electron Beam Accelerator Facility (CEBAF), was under construction in Newport News, Virginia. The facility was to be the first of its kind in that it was to provide a continuous beam of electrons for experimental physics at energies of several GeV. One of the key elements of this unique machine was the 338 superconducting radio frequency (SRF) cavities built into 42 cryomodules and arranged in two linacs. These were linked by arcs of conventional magnets which allowed recirculation through the linacs up to five times, in order to achieve the design energy of 4GeV. Within each cryomodule the cavities were aligned and referenced to external fiducials allowing alignment on the design beampath. This paper describes the process developed to achieve this, how it evolved with improving instrumentation, and the results obtained. Suggestions for alternative methods which may prove useful for future projects are also discussed.

Book 12 GeV Upgrade Project   Cryomodule Production

Download or read book 12 GeV Upgrade Project Cryomodule Production written by and published by . This book was released on 2012 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

Book JLab CW Cryomodules for 4th Generation Light Sources

Download or read book JLab CW Cryomodules for 4th Generation Light Sources written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Fourth generation light sources hold the prospect of unprecedented brightness and optical beam quality for a wide range of scientific applications. Many of the proposed new facilities will rely on large superconducting radio frequency (SRF) based linacs to provide high energy, low emittance CW electron beams. For high average power applications there is a growing acceptance of energy recovery linac (ERL) technology as the way to support large recirculating currents with modest RF power requirements. CW SRF and high current ERLs are two core competencies at Jefferson Lab. JLab has designed and built a number of CW cryomodules of several different types starting with the original CEBAF design, with variations for higher current in the two generations of JLab's free-electron laser (FEL), through two intermediate prototypes to the final high-performance module for the 12 GeV upgrade. Each of these represent fully engineered and tested configurations with a variety of specifications that could be considered for possible use in fourth generation light sources. Furthermore JLab has been actively pursuing advanced concepts for highcurrent high-efficiency cryomodules for next generation ERL based FEL's. These existing and proposed designs span the range from about 1mA single-pass to over 100 mA energy recovered current capability. Specialized configurations also exist for high-current non-energy recovered sections such as the injector region where very high RF power is required. We discuss the performance parameters of these existing and proposed designs and their suitability to different classes of fourth generation light sources.

Book BNL 703 MHz SRF Cryomodule Demonstration

Download or read book BNL 703 MHz SRF Cryomodule Demonstration written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This paper will present the preliminary results of the testing of the 703 MHz SRF cryomodule designed for use in the ampere class ERL under construction at Brookhaven National Laboratory. The preliminary cavity tests, carried out at Thomas Jefferson Laboratory, demonstrated cavity performance of 20 MV/m with a Qo of 1 x 101°, results we expect to reproduce in the horizontal configuration. This test of the entire string assembly will allow us to evaluate all of the additional cryomodule components not previously tested in the VTA and will prepare us for our next milestone test which will be delivery of electrons from our injector through the cryomodule to the beam dump. This will also be the first demonstration of an accelerating cavity designed for use in an ampere class ERL, a key development which holds great promise for future machines.

Book Test Results of Tesla Style Cryomodules at Fermilab

Download or read book Test Results of Tesla Style Cryomodules at Fermilab written by and published by . This book was released on 2012 with total page 3 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Cryomdoule Test Stand Reduced Magnetic Support Design at Fermilab

Download or read book Cryomdoule Test Stand Reduced Magnetic Support Design at Fermilab written by and published by . This book was released on 2016 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These devices will be tested at Fermilab's Cryomodule Test Facility (CMTF) within the Cryomodule Test Stand (CMTS-1) cave. The problem of magnetic pollution became one of major issues during design stage of the LCLS-II cryomodule as the average quality factor of the accelerating cavities is specified to be 2.7 x 1010. One of the possible ways to mitigate the effect of stray magnetic fields and to keep it below the goal of 5 mGauss involves the application of low permeable materials. Initial permeability and magnetic measurement studies regarding the use of 316L stainless steel material indicated that cold work (machining) and heat affected zones from welding would be acceptable.