EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Issues Affecting Naval Force Structure

Download or read book Issues Affecting Naval Force Structure written by United States House of Representatives and published by . This book was released on 2019-09-26 with total page 104 pages. Available in PDF, EPUB and Kindle. Book excerpt: Issues affecting naval force structure: hearing before the Seapower and Expeditionary Forces Subcommittee of the Committee on Armed Services, House of Representatives, One Hundred Eleventh Congress, second session, hearing held January 20, 2010.

Book Navy Force Structure and Shipbuilding Plans

Download or read book Navy Force Structure and Shipbuilding Plans written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2010-03 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: Discusses the U.S. Navy¿s proposed FY 2010 budget requests funding for eight new Navy ships. This total includes two relatively expensive, high-capability combatant ships (a Virginia-class attack submarine and a DDG-51 class Aegis destroyer) and six relatively inexpensive ships (three Littoral Combat Ships [LCSs], two TAKE-1 auxiliary dry cargo ships, and one Joint High Speed Vessel [JHSV]). Concerns about the Navy¿s prospective ability to afford its long-range shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to concerns about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. Illus.

Book Issues Affecting Naval Force Structure

    Book Details:
  • Author : United States Congress
  • Publisher : Createspace Independent Publishing Platform
  • Release : 2017-10-17
  • ISBN : 9781978353466
  • Pages : 102 pages

Download or read book Issues Affecting Naval Force Structure written by United States Congress and published by Createspace Independent Publishing Platform. This book was released on 2017-10-17 with total page 102 pages. Available in PDF, EPUB and Kindle. Book excerpt: Issues affecting naval force structure: hearing before the Seapower and Expeditionary Forces Subcommittee of the Committee on Armed Services, House of Representatives, One Hundred Eleventh Congress, second session, hearing held January 20, 2010.

Book Issues Affecting Naval Force Structure

    Book Details:
  • Author : United States. Congress. House. Committee on Armed Services. Seapower and Expeditionary Forces Subcommittee
  • Publisher :
  • Release : 2010
  • ISBN :
  • Pages : 108 pages

Download or read book Issues Affecting Naval Force Structure written by United States. Congress. House. Committee on Armed Services. Seapower and Expeditionary Forces Subcommittee and published by . This book was released on 2010 with total page 108 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Issues Affecting Naval Force Structure

    Book Details:
  • Author : United States. Congress. House. Committee on Armed Services. Seapower and Expeditionary Forces Subcommittee
  • Publisher :
  • Release : 2010
  • ISBN :
  • Pages : pages

Download or read book Issues Affecting Naval Force Structure written by United States. Congress. House. Committee on Armed Services. Seapower and Expeditionary Forces Subcommittee and published by . This book was released on 2010 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Navy Force Structure and Shipbuilding Plans

Download or read book Navy Force Structure and Shipbuilding Plans written by Ronald O'Rourke and published by . This book was released on 2005 with total page 59 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy in February 2006 proposed to maintain in coming years a fleet of 313 ships, including, among other things, 11 aircraft carriers, 48 attack submarines (SSNs), 88 cruisers and destroyers, 55 Littoral Combat Ships (LCSs), 31 amphibious ships, and a Maritime Prepositioning Force (Future), or MPF(F), squadron with 12 new-construction amphibious and sealift-type ships. The Navy says that for its shipbuilding plans to be affordable and executable, the Navy needs to control certain non-shipbuilding expenditures and build ships within estimated costs. The Navy's shipbuilding plans raise potential issues regarding the shipbuilding industrial base, particularly in the areas of the submarine design and engineering base, and the surface combatant construction base.

Book Navy Force Structure and Shipbuilding Plans

Download or read book Navy Force Structure and Shipbuilding Plans written by Ronald O'Rourke and published by . This book was released on 2008 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: In February 2008, as part of its proposed FY2009 budget, the Navy submitted to Congress the FY2009 version of its annual 30-year shipbuilding plan. The 30-year plan is intended to support the Navy's goal of achieving and maintaining a 313-ship fleet. The Navy first presented the 313-ship plan to Congress in February 2006. The increase in the Navy's estimated cost for implementing the plan is so large that the Navy no longer appears to have a clearly identifiable, announced strategy for generating the funds needed to implement the 30-year plan, at least not without significantly reducing funding for other Navy programs or increasing the Navy's programmed budget in coming years by billions of dollars per year. Concerns about the Navy's prospective ability to afford the 30-year shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to strong concerns among some Members about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. As a consequence of these strong concerns, some Members in hearings this year on the Navy's proposed FY2009 budget have strongly criticized aspects of the Navy's shipbuilding plan and indicated that they are considering making changes to the plan. Some Members in the House, for example, have indicated that they are considering the option of not procuring a third DDG-1000 class destroyer in FY2009, as the Navy has requested, and using the funding programmed for that ship to instead procure other kinds of ships for the Navy. This report will be updated as events warrant.

Book Navy Force Structure and Shipbuilding Plans

Download or read book Navy Force Structure and Shipbuilding Plans written by O'Rourke and published by CreateSpace. This book was released on 2015-01-03 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides background information and presents potential issues for Congress concerning the Navy's ship force-structure goals and shipbuilding plans. The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been matters of concern for the congressional defense committees for the past several years. Decisions that Congress makes on Navy shipbuilding programs can substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.

Book Navy Force Structure and Shipbuilding Plans  Background and Issues for Congress

Download or read book Navy Force Structure and Shipbuilding Plans Background and Issues for Congress written by and published by . This book was released on 2008 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: In February 2008, as part of its proposed FY2009 budget, the Navy submitted to Congress the FY2009 version of its annual 30-year shipbuilding plan. The 30-year plan is intended to support the Navy's goal of achieving and maintaining a 313-ship fleet. The Navy first presented the 313-ship plan to Congress in February 2006. The increase in the Navy's estimated cost for implementing the plan is so large that the Navy no longer appears to have a clearly identifiable, announced strategy for generating the funds needed to implement the 30-year plan, at least not without significantly reducing funding for other Navy programs or increasing the Navy's programmed budget in coming years by billions of dollars per year. Concerns about the Navy's prospective ability to afford the 30-year shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to strong concerns among some Members about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. As a consequence of these strong concerns, some Members in hearings this year on the Navy's proposed FY2009 budget have strongly criticized aspects of the Navy's shipbuilding plan and indicated that they are considering making changes to the plan. Some Members in the House, for example, have indicated that they are considering the option of not procuring a third DDG-1000 class destroyer in FY2009, as the Navy has requested, and using the funding programmed for that ship to instead procure other kinds of ships for the Navy. This report will be updated as events warrant.

Book Navy Force Structure and Shipbuilding Plans

Download or read book Navy Force Structure and Shipbuilding Plans written by Congressional Service and published by Createspace Independent Publishing Platform. This book was released on 2017-12 with total page 134 pages. Available in PDF, EPUB and Kindle. Book excerpt: The current and planned size and composition of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been oversight matters for the congressional defense committees for many years. The Navy's proposed FY2018 budget, as amended on May 24, 2017, requests the procurement of nine new ships, including one Gerald R. Ford (CVN-78) class aircraft carrier, two Virginia-class attack submarines, two DDG-51 class destroyers, two Littoral Combat Ships (LCSs), one TAO-205 class oiler, and one towing, salvage, and rescue ship. On December 15, 2016, the Navy released a new force-structure goal that calls for achieving and maintaining a fleet of 355 ships of certain types and numbers. Key points about this new 355-ship force-level goal include the following: The 355-ship force-level goal is the result of a Force Structure Assessment (FSA) conducted by the Navy in 2016. The Navy conducts an FSA every few years, as circumstances require, to determine its force-structure goal. The new 355-ship force-level goal replaces a 308-ship force-level goal that the Navy released in March 2015. The actual size of the Navy in recent years has generally been between 270 and 290 ships. The figure of 355 ships appears close to an objective of building toward a fleet of 350 ships that was announced by the Trump campaign organization during the 2016 presidential election campaign. The 355-ship goal, however, reflects the national security strategy and national military strategy that were in place in 2016 (i.e., the Obama Administration's national security strategy and national military strategy), while the Trump campaign organization's 350-ship goal appears to have a different origin. Compared to the previous 308-ship force-level goal, the new 355-ship force-level goal includes 47 additional ships, or about 15% more ships. More than 47 ships, however, would need to be added to the Navy's 30-year shipbuilding plan to achieve and maintain the Navy's 355-ship fleet, unless the Navy extends the service lives of existing ships beyond currently planned figures and/or reactivates recently retired ships: CRS estimates that 57 to 67 ships would need to be added to the Navy's FY2017 30-year (FY2017-FY2046) shipbuilding plan to achieve the Navy's 355-ship fleet and maintain it through the end of the 30-year period (i.e., through FY2046).

Book Navy Force Structure and Shipbuilding Plans

Download or read book Navy Force Structure and Shipbuilding Plans written by Ronald O'Rourke and published by . This book was released on 2020-11-14 with total page 145 pages. Available in PDF, EPUB and Kindle. Book excerpt: Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.

Book The Chinese Navy

    Book Details:
  • Author : Institute for National Strategic Studies
  • Publisher : Government Printing Office
  • Release : 2011-12-27
  • ISBN : 9780160897634
  • Pages : 348 pages

Download or read book The Chinese Navy written by Institute for National Strategic Studies and published by Government Printing Office. This book was released on 2011-12-27 with total page 348 pages. Available in PDF, EPUB and Kindle. Book excerpt: Tells the story of the growing Chinese Navy - The People's Liberation Army Navy (PLAN) - and its expanding capabilities, evolving roles and military implications for the USA. Divided into four thematic sections, this special collection of essays surveys and analyzes the most important aspects of China's navel modernization.

Book C4ISR for Future Naval Strike Groups

Download or read book C4ISR for Future Naval Strike Groups written by National Research Council and published by National Academies Press. This book was released on 2006-05-26 with total page 300 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has put forth a new construct for its strike forces that enables more effective forward deterrence and rapid response. A key aspect of this construct is the need for flexible, adaptive command, control, communications, computers, intelligence, surveillance, and reconnaissance (C4ISR) systems. To assist development of this capability, the Navy asked the NRC to examine C4ISR for carrier, expeditionary, and strike and missile defense strike groups, and for expeditionary strike forces. This report provides an assessment of C4ISR capabilities for each type of strike group; recommendations for C4ISR architecture for use in major combat operations; promising technology trends; and an examination of organizational improvements that can enable the recommended architecture.

Book Responding to Capability Surprise

Download or read book Responding to Capability Surprise written by National Research Council and published by National Academies Press. This book was released on 2013-12-31 with total page 216 pages. Available in PDF, EPUB and Kindle. Book excerpt: From a military operational standpoint, surprise is an event or capability that could affect the outcome of a mission or campaign for which preparations are not in place. By definition, it is not possible to truly anticipate surprise. It is only possible to prevent it (in the sense of minimizing the number of possible surprises by appropriate planning), to create systems that are resilient to an adversary's unexpected actions, or to rapidly and effectively respond when surprised. Responding to Capability Surprise examines the issues surrounding capability surprise, both operational and technical, facing the U.S. Navy, Marine Corps, and Coast Guard. This report selects a few surprises from across a continuum of surprises, from disruptive technologies, to intelligence-inferred capability developments, to operational deployments, and assesses what the Naval Forces are doing (and could do) about them while being mindful of future budgetary declines. The report then examines which processes are in place or could be in place in the Navy, the Marine Corps, and the Coast Guard to address such surprises. Today's U.S. naval forces continue to face a wide range of potential threats in the indefinite future and for this reason must continue to balance and meet their force structure needs. The recommendations of Responding to Capability Surprise will help to ensure more responsive, more resilient, and more adaptive behavior across the organization from the most senior leadership to the individual sailors, Marines, and Coast Guardsmen.

Book 2017 U  S  Navy Force Structure Assessment  FSA  and the Request for a 355 Ship Navy  Outline of Shipbuilding Plans for Aircraft Carriers  Submarines  Nuclear Missiles  Surface Combatants  Destroyers

Download or read book 2017 U S Navy Force Structure Assessment FSA and the Request for a 355 Ship Navy Outline of Shipbuilding Plans for Aircraft Carriers Submarines Nuclear Missiles Surface Combatants Destroyers written by U. S. Military and published by . This book was released on 2017-08-27 with total page 132 pages. Available in PDF, EPUB and Kindle. Book excerpt: Navy's Force Structure Assessment (FSA) was developed in an effort to determine the right balance of existing forces, the ships we currently have under construction and the future procurement plans needed to address the ever-evolving and increasingly complex threats the Navy is required to counter in the global maritime commons. This FSA assumes that the future plans for our Navy, in ship types and numbers of ships, continues to replace the ships we have today with ships of similar capability and in similar numbers as we transition to the future Navy - it does not address potential options that may come out of the ongoing review of the potential Future Fleet Architecture studies that were directed by Congress and completed in October 2016. As we evaluate the options presented in these studies and move to include them in our plans for tomorrow's Navy, this FSA will need to be updated to reflect those changes that are determined to be most beneficial to meeting the Navy's missions of the future. The FSA, released at the end of 2016 by the outgoing Obama administration, recommends a 355-ship fleet including 12 carriers, 104 large surface combatants, 52 small surface combatants, 38 amphibious ships, and 66 submarines. The assessment will be one input to the Navy's FY-2018 30-year shipbuilding plan. The current proposed Navy budget is seen as a bridge to this larger Navy, with shipbuilding on an upward glide slope towards 308 ships. Navy leadership is confident that, if funded, this plan is executable, as each ship class called for in the FSA has an active shipbuilding line already up and running. "To continue to protect America and defend our strategic interests around the world, all while continuing the counter terrorism fight and appropriately competing with a growing China and resurgent Russia, our Navy must continue to grow," said Secretary of the Navy Ray Mabus. "All of the analysis done to date, inside and outside of the Navy, recognizes, as we have for nearly the last eight years, the need for a larger Fleet. That is why, working with Congress and our partners in industry, we have successfully reversed the decline in shipbuilding that occurred from 2001-2009, putting 86 ships under contract over the last seven years. Maintaining this momentum, and the cost-saving business practices we have established, will be critical to ensuring the Navy is able to achieve the FSA-recommended fleet size and is positioned to maintain the global presence the Navy and Marine Corps uniquely provide our nation." Part of this reproduction includes the Congressional Research Service report on the FSA and shipbuilding. This report presents background information and issues for Congress concerning the Navy's force structure and shipbuilding plans. The current and planned size and composition of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been oversight matters for the congressional defense committees for many years. The Navy's proposed FY2018 budget, as amended on May 24, 2017, requests the procurement of nine new ships, including one Gerald R. Ford (CVN-78) class aircraft carrier, two Virginia-class attack submarines, two DDG-51 class destroyers, two Littoral Combat Ships (LCSs), one TAO-205 class oiler, and one towing, salvage, and rescue ship. On December 15, 2016, the Navy released a new force-structure goal that calls for achieving and maintaining a fleet of 355 ships of certain types and numbers. The issue for Congress is whether to approve, reject, or modify the Navy's force structure and shipbuilding plans. Decisions that Congress makes on this issue can substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.

Book The Shipbuilding   Force Structure Analysis Tool  A User s Guide

Download or read book The Shipbuilding Force Structure Analysis Tool A User s Guide written by and published by . This book was released on 2004 with total page 157 pages. Available in PDF, EPUB and Kindle. Book excerpt: Each time a major defense review is undertaken, policymakers must confront a range of complicated issues about the Navy's future force structure, including resource concerns and significant changes in the shipbuilding industrial base. To help answer these concerns, analysts in the Office of the Secretary of Defense (OSD) and the Chief of Naval Operations (CNO) staff turn to the available analytical tools to help provide options to decisionmakers. Although an array of such tools exists, there is a significant need for improvement to ensure that policy and resource decisions are well analyzed and supported.

Book Strategy Shelved

    Book Details:
  • Author : Steven Wills
  • Publisher : Naval Institute Press
  • Release : 2021-08-15
  • ISBN : 168247674X
  • Pages : 194 pages

Download or read book Strategy Shelved written by Steven Wills and published by Naval Institute Press. This book was released on 2021-08-15 with total page 194 pages. Available in PDF, EPUB and Kindle. Book excerpt: As U.S. strategy shifts (once again) to focus on great power competition, Strategy Shelved provides a valuable, analytic look back to the Cold War era by examining the rise and eventual fall of the U.S. Navy’s naval strategy system from the post–World War II era to 1994. Steven T. Wills draws some important conclusions that have relevance to the ongoing strategic debates of today. His analysis focuses on the 1970s and 1980s as a period when U.S. Navy strategic thought was rebuilt after a period of stagnation during the Vietnam conflict and its high water mark in the form of the 1980s’maritime strategy and its attendant six hundred –ship navy force structure. He traces the collapse of this earlier system by identifying several contributing factors: the provisions of the Goldwater Nichols Act of 1986, the aftermath of the First Gulf War of 1991, the early 1990s revolution in military affairs, and the changes to the Chief of Naval Operations staff in 1992 following the end of the Cold War. All of these conditions served to undermine the existing naval strategy system. The Goldwater Nichols Act subordinated the Navy to joint control with disastrous effects on the long-serving cohort of uniformed naval strategists. The first Gulf War validated Army and Air Force warfare concepts developed in the Cold War but not those of the Navy’s maritime strategy. The Navy executed its own revolution in military affairs during the Cold War through systems like AEGIS but did not get credit for those efforts. Finally, the changes in the Navy (OPNAV) staff in 1992 served to empower the budget arm of OPNAV at the expense of its strategists. These measures laid the groundwork for a thirty-year “strategy of means” where service budgets, a desire to preserve existing force structure, and lack of strategic vision hobbled not only the Navy, but also the Joint Force’s ability to create meaningful strategy to counter a rising China and a revanchist Russian threat. Wills concludes his analysis with an assessment of the return of naval strategy documents in 2007 and 2015 and speculates on the potential for success of current Navy strategies including the latest tri-service maritime strategy. His research makes extensive use of primary sources, oral histories, and navy documents to tell the story of how the U.S. Navy created both successful strategies and how a dedicated group of naval officers were intimately involved in their creation. It also explains how the Navy’s ability to create strategy, and even the process for training strategy writers, was seriously damaged in the post–Cold War era.