EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Investigation of the Geokinetics Horizontal in Situ Oil shale retorting Process  Fourth Annual Report  1980

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil shale retorting Process Fourth Annual Report 1980 written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Geokinetics in situ shale oil project is a cooperative venture between Geokinetics Inc. and the US Department of Energy. The objective is to develop a true in situ process for recovering shale oil using a fire front moving in a horizontal direction. The project is being conducted at a field site, Kamp Kerogen, located 70 miles south of Vernal, Utah. This Fourth Annual Report covers work completed during the calendar year 1980. During 1980 one full-size retort was blasted. Two retorts, blasted the previous year, were burned. A total of 4891 barrels of oil was produced during the year.

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process  Quarterly Report  January  February  March 1981

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process Quarterly Report January February March 1981 written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Retort No. 23 has been heavily instrumented and was ignited on March 16, 1981. A total of 6588 barrels of shale oil have been recovered from Retort No. 24 to date; 6057 barrels of oil were recovered during the quarter, an average of 65 barrels per day. Approximately 4909 barrels of shale oil were shipped by tanker truck to the WESRECO refinery in Salt Lake City, Utah, during the quarter. Drilling of re-entry process and instrumentation wells on Retort No. 25 was completed. A post-burn core sampling program for Retort No. 18 was developed and implemented.

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process written by Steven Bartlett and published by . This book was released on 1982 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Geokinetics in situ shale oil project is a cooperative venture between Geokinetics and the US Department of Energy. The objective is to develop a true in situ process for recovering shale oil using a fire front moving in a horizontal direction. The project is being conducted at a field site, Kamp Kerogen, located 70 miles south of Vernal, Utah. This fifth annual report covers work completed during the calendar year 1981. During 1981, one full sized retort (Retort No. 26) was blasted and the following three retorts were processed: (1) Retort No. 24 operations were continued until July 23; (2) Retort No. 23 was ignited and processed during the calendar year; (3) Retort No. 25 was ignited and burned for 77 days during 1981.

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process written by Kenneth B. Henderson and published by . This book was released on 1984 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process written by Kenneth B. Henderson and published by . This book was released on 1983 with total page 33 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process  Quarterly Report  October  November  December 1983

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process Quarterly Report October November December 1983 written by and published by . This book was released on 1984 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Retort No. 27 was ignited on August 11, 1983 and by December 31 had completed 139 days of operation and produced 11,420 barrels of oil. Retort No. 28 was ignited on October 18, 1983 and on December 31 had completed 74 days of operation and produced 5,285 barrels of oil. The off-gas processing plants for the two retorts was completed and put through a shakedown run. Concentration levels of H2S and NH3 in the retort off gas did not warrant plant operation in the fourth quarter. Environmental studies are reported.

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process written by Steven Bartlett and published by . This book was released on 1982 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Retort No. 25 burn was terminated on June 15, 1982. Total oil production for the second quarter was 6506 barrels during a 76 day production period. Final oil production for Retort No. 25 was 20,956 barrels. Final oil recovery was calculated to be 59% of the total in-place oil. Fugitive emissions, stack and process gas data indicated that all Retort No. 25 pollutants, except NO/sub x/, were below the allowable PSD limits. The Retort No. 25 process water characterization study was completed in April to determine the changes in retort produced water as the retort burn progressed. Results of the study are pending the completion of laboratory analysis. Retort No. 26 was prepared for ignition during the second quarter. Process manifolding and instrumentation were being completed so that ignition might occur shortly after the termination of the Retort No. 25 burn. Post blast core drilling and analysis was completed on Retort No. 27 during early April. The core samples indicated improved fracturing over previous retorts, especially near the bottom. Increasing the size of Retort No. 27 from one acre to two acres showed an increase in blast efficiency based on the criteria of fragmentation, quantity of explosives used per volume of void induced and percent void when compared with Retort No. 24. In June initial site preparation began on Retort No. 28 for blast hole drilling which will start in July.

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process  Quarterly Report  July  August  September 1983

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process Quarterly Report July August September 1983 written by and published by . This book was released on 1984 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Retort No. 27 was ignited using a new procedure and 47 days of operation were completed in the quarter. For retort No. 28 air injection and off gas piping and manifolding was completed along with the installation of electrical and instrumentation wiring. The off gas processing plant for the two retorts was completed and an initial shakedown run made.

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process written by Lee Wege and published by . This book was released on 1983 with total page 102 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process  Quarterly Report  October  November  December 1980

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process Quarterly Report October November December 1980 written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The ignition of Geokinetics first full-sized prototype retort (Retort 24) was completed on December 1, 1980. Recovery of oil from Retort No. 24 began about midway through December, and 531 barrels of oil had been recovered by the end of the quarter. A cold oil effect resulted in the accumulation of oil within the retort. Five thousand one ninety one barrels of oil were shipped to WESRECO, Salt Lake City, Utah during the quarter, and the shale oil was blended into No. 5 fuel oil, which was sold to industrial users. The Retort No. 25 post-blast core drilling program was completed in October. A total of seven core holes were drilled. Evaluation of the core samples was underway. Preliminary analysis indicated good breakage in the lower portion of Retort No. 25. A new technique for sealing retort surface fractures was designed and implemented on Retort No. 25. A layer of bentonite with gas and steam retention properties was applied to the retort surface and covered with a layer of topsoil.

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process  Quarterly Report  January March 1980

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process Quarterly Report January March 1980 written by and published by . This book was released on 1980 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Retort No. 18 produced 3479 barrels of oil during the quarter for a total of 4528 barrels to date. Chromatographic analyses of Retort No. 18 shale oil by the GKI analytical laboratory indicated variation in the oil from the wells near the air-in end and from the air-out end of the retort. Shale oil has been blended with Altamont crude (the Roosevelt refinery's normal feedstock); the distillation, API gravity, pour point, flash point, Naptha and Cat Gas were not affected by the shale oil. The diesel off the crude unit changed from water white to yellow, however, and a fine grayish-brown precipitate formed. Re-entry drilling was performed on Retorts No. 21, No. 22, and No. 23 during the quarter; tracer tests were run by Sandia Laboratories on Retorts No. 19, No. 21, No. 22, and No. 23. Blasthole drilling began on Retort No. 25.

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process written by Kenneth B. Henderson and published by . This book was released on 1984 with total page 145 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process  Quarterly Report  April  May  June 1980

Download or read book Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process Quarterly Report April May June 1980 written by and published by . This book was released on 1980 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Retort No. 18 burn was terminated on May 11, 1980. A total of 5547 barrels of shale oil or 46 percent of in-place resource was recovered from the retort. The EPA-DOE/LETC post-burn core sampling program is underway on Retort No. 16. Eleven core holes (of 18 planned) have been completed to date. Preliminary results indicate excellent core recovery has been achieved. Recovery of 702 ft of core was accomplished. The Prevention of Significant Deterioration (PSD) permit application was submitted to the EPA regional office in Denver for review by EPA and Utah air quality officials. The application for an Underground Injection Control (UIC) permit to authorize GKI to inject retort wastewater into the Mesa Verde Formation is being processed by the State of Utah. A hearing before the Board of Oil, Gas and Mining is scheduled in Salt Lake City, Utah, for July 22, 1980. Re-entry drilling on Retort No. 24 is progressing and placement of surface equipment is underway. Retort No. 25 blasthole drilling was completed and blast preparations are ongoing. Retort No. 25 will be blasted on July 18, 1980. The retort will be similar to Retort No. 24, with improvements in blasthole loading and detonation. US Patent No. 4,205,610 was assigned to GKI for a shale oil recovery process. Rocky Mountain Energy Company (RME) is evaluating oil shale holdings in Wyoming for application of the GKI process there.