Download or read book Inactive Uranium Mill Tailings New and Old Rifle Sites Engineering Assessment Summary written by and published by . This book was released on 1981 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Summary of the Engineering Assessment of Inactive Uranium Mill Tailings written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This report is a summary of a parent report DOE/UMT--0108. These reports have become necessary as a result of changes that have occurred since 1977 which pertain to the Rifle sites and vicinity, as well as changes in remedial action criteria. The new data reflecting these changes are summarized in this report.
Download or read book Engineering Assessment of Inactive Uranium Mill Tailings New and Old Rifle Site Rifle Colorado Phase II written by and published by . This book was released on 1977 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Rifle, Colorado. The Phase II--Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 3.1 million tons of tailings at the two Rifle sites, constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. The 15 alternative remedial action options presented range from millsite decontamination and off-site remedial action (Options I and IV), to adding various depths of stabilization cover material (Options II, V, VI and VII), to removal of the tailings to long-term storage sites and decontamination of the present sites (Options III and VIII through XV). Cost estimates for the first 14 options range from $224,000 to $20,300,000. Option XV, estimated at $32,200,000, includes the cost for moving both Rifle tailings piles and the Grand Junction tailings pile to DeBeque for long-term storage and site decontamination after removal of the piles. Reprocessing of the tailings for uranium appears to be economically attractive at present.
Download or read book Inactive Uranium Mill Tailings Riverton Engineering Assessment Summary written by and published by . This book was released on 1981 with total page 90 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Nuclear Facility Decommissioning and Site Remedial Actions written by and published by . This book was released on 1980 with total page 656 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 782 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Inactive Uranium Mill Tailings Maybell Site Engineering Assessment Summary written by and published by . This book was released on 1981 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Inactive Uranium Mill Tailings Phillips United Nuclear Site Ambrosia Lake Engineering Assessment Summary B1 Corrigenda to Engineering Assessment Summary written by and published by . This book was released on 1981 with total page 12 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Annual Status Report on the Inactive Uranium Mill Tailings Sites Remedial Action Program written by United States. Department of Energy. Division of Environmental Control Technology and published by . This book was released on 1979 with total page 228 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Inactive Uranium Mill Tailings Maybell Site Engineering Assessment Summary written by and published by . This book was released on 1981 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Engineering Assessment of Inactive Uranium Mill Tailings Rifle Site Rifle Colorado Summary of the Phase II written by and published by . This book was released on 1977 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Rifle, Colorado. The Phase II - Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 3.1 million tons of tailings at the two Rifle sites, constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. The 15 alternative remedial action options presented range from millsite decomtamination and off-site remedial action (Options I and IV), to adding various depths of stabilization cover material (Options II, V, VI, and VII), to removal of the tailings to long-term storage sites and decontamination of the present sites (Options III and VIII through XV). Cost estimates for the first 14 options range from $224,000 to $20,300,000. Option XV, estimated at $32,200,000, includes the cost for moving both Rifle tailings piles and the Grand Junction tailings pile to DeBeque for long-term storage and site decontamination after removal of the piles. Reprocessing of the tailings for uranium appears to be economically attractive at present.
Download or read book Inactive Uranium Mill Tailings Canonsburg Site Engineering Assessment Summary EA written by and published by . This book was released on 1982 with total page 106 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Radioactive Waste Processing and Disposal written by U.S. Nuclear Regulatory Commission and published by . This book was released on 1980 with total page 948 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Inactive Uranium Mill Tailings Vitro Site Salt Lake City Engineering Assessment Summary written by and published by . This book was released on 1981 with total page 116 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book A Summary of the Phase II Title I Engineering Assessment of Inactive Uranium Mill Tailings written by and published by . This book was released on 1977 with total page 100 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Annual Status Report on the Uranium Mill Tailings Remedial Action Program written by and published by . This book was released on 1980 with total page 176 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Inactive Uranium Mill Tailings Spook Site Converse County Engineering Assessment Summary written by and published by . This book was released on 1981 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: