EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Hudson River Basin  Tributary Papakating Creek  Sussex County  New Jersey  Lake Windsor Dam  NJ 00034

Download or read book Hudson River Basin Tributary Papakating Creek Sussex County New Jersey Lake Windsor Dam NJ 00034 written by United States. Army. Corps of Engineers. Philadelphia District and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Lake Windsor Dam  NJ 00034

Download or read book Lake Windsor Dam NJ 00034 written by K. Peter Yu and published by . This book was released on 1981 with total page 140 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Technical Abstract Bulletin

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1981 with total page 196 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Annual Index

Download or read book Government Reports Annual Index written by and published by . This book was released on 1981 with total page 1316 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.

Book National Dam Safety Program  Lake Windsor Dam  NJ 00034   Hudson River Basin  Tributary Papakating Creek  Sussex County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Lake Windsor Dam NJ 00034 Hudson River Basin Tributary Papakating Creek Sussex County New Jersey Phase I Inspection Report written by Peter Yu and published by . This book was released on 1981 with total page 81 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Windsor Dam, classified as having significant hazard potential, is in fair overall condition. There is seepage of water and spongy ground at the downstream toe of the embankment and erosion on the embankments. The embankments are covered with thick brush and trees. The riprap on the upstream face and the toe of the spillway is deteriorating and becoming dislodged in areas. Numerous cracks exist in the concrete of the spillway chute. The control of the low level outlet slide gate is not visible and its operating condition is unknown. There is essentially no available information concerning the design, construction and operation of the dam. Additional investigation is necessary to adequately evaluate the future performance of the dam. The spillway capacity as determined by the Corps of Engineers Screening criteria is adequate. The following are recommended to be done soon: Remove debris which has accumulated in the spillway discharge channel. Investigate the operating condition of the low level outlet and repair if necessary. Provide safe access to the control for operating the low level outlet. Repair cracked and spalled concrete in the spillway structure. Repair deteriorated or dislodged riprap on the upstream embankments and at the downstream toe of the spillway. Repair eroded areas on the embankments of the dam. Develop written operating procedures and a periodic maintenance plan to ensure the safety of the dam.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1981 with total page 894 pages. Available in PDF, EPUB and Kindle. Book excerpt: