EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book High SO2 Removal Efficiency Testing  Technical Progress Report  October  December 1993

Download or read book High SO2 Removal Efficiency Testing Technical Progress Report October December 1993 written by and published by . This book was released on 1994 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, {open_quotes}High Efficiency SQ Removal Testing{close_quotes}, for the time period 1 October through 31 December 1993. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO2 removal efficiency. The upgrades to be evaluated mostly involve using additives in the FGD systems. The {open_quotes}base{close_quotes} project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option 1), the Southwestern Electric Power Company Pirkey Station (Option 11), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV) and the New York State Electric and Gas Company Kintigh Station (Option V). As of December 1993, testing has been completed for the base project and for Options I and II, has begun but is only partly completed for Options III and IV, and has not yet begun for Option V. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from these technical efforts during the quarter. Results for each site for which there were significant technical efforts are discussed in separate subsections. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the first quarter of calendar year 1994. Section 5 includes a brief acknowledgment.

Book High SO2 Removal Efficiency Testing  Technical Progress Report   1 April  30 June 1993

Download or read book High SO2 Removal Efficiency Testing Technical Progress Report 1 April 30 June 1993 written by and published by . This book was released on 1993 with total page 40 pages. Available in PDF, EPUB and Kindle. Book excerpt: On the base program, testing was completed at the Tampa Electric Big Bend Station in November, 1992. The upgrade option tested was DBA additive. Project efforts primarily consisted of project management activities and reporting. Review comments were received for the draft Technical Note that was submitted last quarter. A paper was prepared summarizing results from this site for presentation at the 1993 SO2 Control Symposium which is planned for August. For Option 1, at the Hoosier Energy Merom Station, results from another program co-funded by the Electric Power Research Institute (EPRI) and the National Rural Electric Cooperative Association are being combined with results from DOE-funded testing. Three upgrade options have been tested: DBA additive, sodium formate additive, and high pH set point operation. All testing was completed by November, 1992. Project efforts during the current quarter were primarily in data reduction and reporting. The draft Technical Note for the Merom site was submitted in early April, and review comments were received in late May and early June. Option 2 involves testing at the Southwestern Electric Power Company Pirkey Station. For this option, baseline testing was conducted in February. The upgrade option scheduled to be tested at this site was sodium formate additive. However, based on interim results from other sites and feedback from the Technology Working Group for this project, it was decided to test both sodium formate and DBA additive at Pirkey. Parametric testing with DBA additive was conducted in March, and parametric testing with sodium formate was conducted in April. Based on the initial results from the parametric test series, DBA appeared to be the more attractive upgrade option for this site. Consequently, a DBA additive consumption test was conducted in May. Option 3 and 4 are discussed briefly.

Book High SO2 Removal Efficiency Testing  Technical Progress Report  October  December 1995

Download or read book High SO2 Removal Efficiency Testing Technical Progress Report October December 1995 written by and published by . This book was released on 1995 with total page 9 pages. Available in PDF, EPUB and Kindle. Book excerpt: This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO2 removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The ''base'' project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy's Merom Station (Option I), Southwestern Electric Power Company's Pirkey Station (Option II), PSI Energy's Gibson Station (Option III), Duquesne Light's Elrama Station (Option IV), and New York State Electric and Gas Corporation's Kintigh Station (Option V). The originally planned testing has been completed for all six sites. Following the introduction, this report is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from technical efforts during the quarter, or results from prior quarter that have not been previously reported. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts anticipated for the first quarter of calendar year 1996. Section 5 contains a brief acknowledgment.

Book High SO2 Removal Efficiency Testing  Technical Progress Report   January 1  March 31  1993

Download or read book High SO2 Removal Efficiency Testing Technical Progress Report January 1 March 31 1993 written by and published by . This book was released on 1993 with total page 21 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides a discussion of the technical progress on DOE-PETC Project Number AC22-92PC91338, ''High Efficiency SO2 Removal Testing, '' for the time period from January 1 through March 31, 1993. The project involves testing at full-scale utility flue gas desulfurization (FGD) systems to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO2 removal efficiency. The options to be evaluated primarily involve the addition of organic acid buffers to the FGD systems. The ''base'' project involves testing at one site, Tampa Electric Company's Big Bend Station. Up to five optional sites may be added to the program at the discretion of DOE-PETC. By March 31, 1993, four of those five options had been exercised. The options include testing at Hoosier Energy's Merom Station (Option I), Southwestern Electric Power Company's (SWEPCo) Pirkey Station (Option II), PSI Energy's Gibson Station (Option III), and Duquesne Light's Elrama Station (Option IV). The remainder of this document is divided into three sections. Section 2, Project Summary, provides a brief overview of the technical efforts on this project during the quarter. Section 3, Results, summarizes the outcome of those technical efforts. Results for the Base Program and for Options I and II are discussed in separate subsections. There are no technical results yet for Options III and IV, which were just exercised by DOE-PETC this quarter.

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 782 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book High SO2 Removal Efficiency Testing  Technical Progress Report   October 1  December 31  1992

Download or read book High SO2 Removal Efficiency Testing Technical Progress Report October 1 December 31 1992 written by and published by . This book was released on 1993 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: Baseline testing at the ''base'' site. Tampa Electric Company's (TECo's) Big Bend Station, commenced on September 28 and was completed on October 2. Initial results from this testing were presented in the previous Technical Progress Report, but a more complete discussion is provided in this report. Parametric testing was conducted at the Big Bend site during this quarter to evaluate the effects of dibasic acid (DBA) addition on system SO2 removal performance. The parametric tests were conducted from November 2 through 19. A DBA consumption rate test was also conducted, after the parametric tests were completed. The DBA consumption test was conducted from November 21 through 25. Options I and II to the base program were exercised by DOE/PETC at the end of the previous quarter. These options involve testing at Hoosier Energy Rural Electric Cooperative Inc.'s Merom Station and Southwestern Electric Power Company's Pirkey Station, respectively. Testing was conducted at Merom Station during November. Previously, Radian Corporation was the test contractor for EPRI-funded performance additive testing at this site. This EPRI-funded testing involved the equivalent of baseline testing, parametric testing with both DBA and sodium formate performance additives, and an additive consumption test with the DBA additive. The results of the prior testing will be available to support the objectives of this DOE project Consequently, the only testing required at the Merom site was to conduct consumption tests with the sodium formate additive. After a brief baseline repeat test, two sodium formate consumption tests were conducted during the time period from November 11 through 23. Results from the consumption tests are presented and discussed in this report.

Book High SO2 Removal Efficiency Testing  Quarterly Status Report  October 1994  December 1994

Download or read book High SO2 Removal Efficiency Testing Quarterly Status Report October 1994 December 1994 written by and published by . This book was released on 1995 with total page 36 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, {open_quotes}High Efficiency SO2 Removal Testing{close_quotes}, for the time period 1 October through 31 December 1994. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low-capital cost upgrades that may allow these systems to achieve up to 98% SO2 removal efficiency. The upgrades to be evaluated primAllily involve using additives in the FGD systems. The {open_quotes}base{close_quotes} project involved testing at the Tampa Electric Company Big Bend station. AR five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option I), the Southwestern Electric Power Company Pirkey Station (Option II), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV), and the New York State Electric and Gas Corporation (NYSEG) Kintigh Station (Option V). By the beginning of the fourth quarter of 1994, testing had been completed for the base project and for all options. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from these technical efforts during the quarter. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the first quarter of calendar year 1995. Section 5 contains a brief acknowledgement.

Book Acid Precipitation

    Book Details:
  • Author :
  • Publisher :
  • Release : 1993
  • ISBN :
  • Pages : 500 pages

Download or read book Acid Precipitation written by and published by . This book was released on 1993 with total page 500 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Kurf  rstlich  Mainzische Landes Regierung  Man hat seit einiger Zeit bemerkt  da   mehrere kurf  rstliche Aemter von der in den kurf  rstlichen Regierungs Verordnungen deutlich bestimmten Vorschrift g  nzlich abweichen  und in den zu erstattenden Berichten sich weder bey dem Hergang      aufhalten  noch die Sache in ihr geh  riges Licht stellen      sondern sich lediglich auf   ltere Berichte     beziehen     Mainz den 12ten Junius 1783

Download or read book Kurf rstlich Mainzische Landes Regierung Man hat seit einiger Zeit bemerkt da mehrere kurf rstliche Aemter von der in den kurf rstlichen Regierungs Verordnungen deutlich bestimmten Vorschrift g nzlich abweichen und in den zu erstattenden Berichten sich weder bey dem Hergang aufhalten noch die Sache in ihr geh riges Licht stellen sondern sich lediglich auf ltere Berichte beziehen Mainz den 12ten Junius 1783 written by and published by . This book was released on 1783 with total page 2 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book High SO2 Removal Efficiency Testing  Technical Progress Report

Download or read book High SO2 Removal Efficiency Testing Technical Progress Report written by and published by . This book was released on 1994 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt: The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO2 removal efficiency. The upgrades to be evaluated mostly involve using additives in the FGD systems. On the base program, testing was completed at the Tampa Electric Big Bend Station in November 1992. The upgrade option tested was DBA additive. For Option 1, at the Hoosier Energy Merom Station, three upgrade options have been tested: DBA additive, sodium formate additive, and high pH set point operation. Option 2 has involved testing at the Southwestern Electric Power Company Pirkey Station. Both sodium formate and DBA additives were tested as potential upgrade options at Pirkey. On Option 3, for testing at the PSI Energy Gibson Station, a DBA additive performance and consumption test was conducted in late February through mid-March 1994. Preliminary results from these tests are discussed in Section 3 of this progress report. Option 4 is for testing at the Duquesne Light Elrama Station. The FGD system employs magnesium-enhanced lime reagent and venturi absorber modules. An EPRI-funded model evaluation of potential upgrade options for this FGD system, along with a preliminary economic evaluation, determined that the most attractive upgrade options for this site were to increase thiosulfate ion concentrations in the FGD system liquor to lower oxidation percentages and increase liquid-phase sulfite alkalinity, and to increase the venturi absorber pressure drop to improve gas/liquid contacting. Parametric testing of these upgrade options was conducted in late March 1994. Preliminary results from these tests are also discussed in Section 3 of this progress report.

Book High SO2 Removal Efficiency Testing  Quarterly Status Report  July  September 1994

Download or read book High SO2 Removal Efficiency Testing Quarterly Status Report July September 1994 written by and published by . This book was released on 1994 with total page 21 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides a discussion of the technical progress on the project ''High Efficiency SO2 Removal Testing'', for the time period 1 July through 30 September 1994. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO2 removal efficiency. The upgrades evaluated mostly involve using additives in the FGD systems. The ''base'' project involved testing at the Tampa Electric Company Big Bend station. AR five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option I), the Southwestern Electric Power Company Pirkey Station (Option II), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV), and the New York State Electric and Gas Company Kintigh Station (Option V). By the end of September 1994, testing was completed for the base project and for all options. The document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from these technical efforts during the quarter. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the fourth quarter of calendar year 1994. Section 5 contains a brief acknowledgement.

Book High SO2 Removal Efficiency Testing

Download or read book High SO2 Removal Efficiency Testing written by and published by . This book was released on 1997 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, "High Efficiency SO Removal Testing," for 2 the time period 1 October through 31 December 1996. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO removal efficiency. The upgrades being 2 evaluated mostly involve using performance additives in the FGD systems. The "base" project involved testing at the Tampa Electric Company s Big Bend Station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy s Merom Station (Option I), Southwestern Electric Power Company s Pirkey Station (Option II), PSI Energy s Gibson Station (Option III), Duquesne Light s Elrama Station (Option IV), and New York State Electric and Gas Corporation s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. However, additional testing has been planned at the Big Bend Station, and that testing commenced during the current quarter. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from technical efforts during the quarter, or results from prior quarters that have not been previously reported. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the first quarter of calendar year 1996. Section 5 contains a brief acknowledgment.

Book High SO2 Removal Efficiency Testing  Technical Progress Report  January  March 1996

Download or read book High SO2 Removal Efficiency Testing Technical Progress Report January March 1996 written by and published by . This book was released on 1996 with total page 9 pages. Available in PDF, EPUB and Kindle. Book excerpt: This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO2 removal efficiency. The upgrades being evaluated primarily involve using performance additives in the FGD systems. The base project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at Hooiser Energy's Merom Station (Option I), Southwestern Electric Power Company's Pirkey Station (Option II), PSI Energy's Gibson Station (Option III), Duquesne Light's Elrama Station (Option IV), and New York State Electric and Gas Corporation's Kintigh Station (Option V). The originally planned testing has been completed for all six sites.

Book Flue Gas Desulfurization and Industrial Minerals

Download or read book Flue Gas Desulfurization and Industrial Minerals written by M. Michael Miller and published by . This book was released on 1993 with total page 720 pages. Available in PDF, EPUB and Kindle. Book excerpt: Contains 4,101 references on FGD [Flue Gas Desulfurization] ... primarily from 1982 through June 1993. Complements the "Flue Gas Desulfurization and Denitrification" bibliography published by the U.S. Dept. of Energy in Jan. 1985. References were located on the Energy, Science and Technology, Pollution Abstracts, and Environmental Bibliography databases. Primarily covers FGD and the use of industrial minerals in the desulfurization process or in by-product utilization and disposal. Emphasizes post-combustion removal of sulfur dioxide through processes such as in-duct injection and wet and dry scrubbing.

Book High SO2 Removal Efficiency Testing  Quarterly Report  July   September 1996

Download or read book High SO2 Removal Efficiency Testing Quarterly Report July September 1996 written by and published by . This book was released on 1996 with total page 8 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, ''High Efficiency SO2 Removal Testing, '' for the time period 1 July through 30 September 1996. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO2 removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The ''base'' project involved testing at the Tampa Electric Company's Big Bend Station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy's Merom Station (Option I), Southwestern Electric Power Company's Pirkey Station (Option II), PSI Energy's Gibson Station (Option III), Duquesne Light's Elrama Station (Option IV), and New York State Electric and Gas Corporation's Kintigh Station (Option V). The originally planned testing has been completed for all six sites. The remainder of this document provides a brief overview of the status of technical efforts on this project, including those efforts anticipated for the first quarter of calendar year 1996, summarizes results from prior quarters, and contains a brief acknowledgment. 13 refs.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1995 with total page 1194 pages. Available in PDF, EPUB and Kindle. Book excerpt: