EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book FY2003 CERCLA Groundwater Monitoring Well Summary Report

Download or read book FY2003 CERCLA Groundwater Monitoring Well Summary Report written by and published by . This book was released on 2003 with total page 91 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report describes the fiscal year (FY) 2003 field activities associated with the installation of one new groundwater monitoring well and two extraction wells in the 100-KR-4 and 200-ZP-1 Operable Units (OU's). A groundwater monitoring well and an extraction well were drilled in the 100-KR-4 OU and an extraction well was drilled in the 200-ZP-1 OU to support enhancement of the pump-and-treat system. Two boreholes were drilled and completed as wells in the 100-KR-4 OU. One of the boreholes was completed as a groundwater-monitoring well (199-K-l30/C4120) and the other was completed as an extraction well (199-K-l29/C4117). These wells are enhancements to the 100-KR-4 Pump-and-Treat Remediation System, which is designed to intercept contaminated groundwater flowing towards the Columbia River utilizing extraction wells, removing hexavalent chromium through ion exchange, and returning treated groundwater to the aquifer via injection wells located further inland. One borehole was drilled and completed as an extraction well in the 200-ZP-1 OU. Well (299-W15-45/C4119) will be connected to the 200-ZP-1 pump-and-treat system, and is a replacement for existing well 299-W15-33. Dropping water level and low yield at 299-W15-33 prompted the installation of well 299-W15-45 (C4119). Extraction well 299-W15-45 (C4119) will be used to remove carbon tetrachloride, chloroform, and trichloroethylene from the groundwater. Descriptions of drilling, sieve analyses, well completion, well development, pump installation, waste management, civil survey information, and well acceptance walkdown for the two operating units are discussed in Sections 2.0-6.0. Section 7.0 provides a detailed description of subsurface geology observed in the two operable units. Section 8.0 cites references used. Well summary sheets, geologic borehole logs, sieve analysis data, well construction summary reports, well development data, drawdown/recovery curves, and pump installation data are included in Appendices A-E.

Book Fiscal Year 2003 CERCLA Groundwater Monitoring Well Summary Report

Download or read book Fiscal Year 2003 CERCLA Groundwater Monitoring Well Summary Report written by Charlene R. Martinez and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Fiscal Year 2004 CERCLA Groundwater Monitoring Well Summary Report for the 100 HR 3  200 ZP 1  200 UP 1 Operable Units

Download or read book Fiscal Year 2004 CERCLA Groundwater Monitoring Well Summary Report for the 100 HR 3 200 ZP 1 200 UP 1 Operable Units written by Charlene R. Martinez and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Calendar Year 2002 RCRA and CERCLA Groundwater Monitoring Well Summary Report

Download or read book Calendar Year 2002 RCRA and CERCLA Groundwater Monitoring Well Summary Report written by Charlene R. Martinez and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Calendar Year 2002 RCRA   CERCLA Groundwater Monitoring Well Summary Report

Download or read book Calendar Year 2002 RCRA CERCLA Groundwater Monitoring Well Summary Report written by and published by . This book was released on 2003 with total page 141 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report describes the calendar year 2002 field activities associated with installing four new groundwater monitoring wells in the 200 West Area of the Hanford Site. Two groundwater monitoring wells are located around waste management area (WMA) TX-TY to support the ''Resource Conservation and Recovery Act of 1976'' (RCRA) and two groundwater monitoring wells are located in the 200-UP-1 and 200-ZP-1 operable units (OU) to support the ''Comprehensive Environmental Response, Compensation, and Liability Act of 1980'' (CERCLA).

Book Calendar Year 2003 RCRA Groundwater Monitoring Well Summary Report

Download or read book Calendar Year 2003 RCRA Groundwater Monitoring Well Summary Report written by Charlene R. Martinez and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book CY2003 RCRA GROUNDWATER MONITORING WELL SUMMARY REPORT

Download or read book CY2003 RCRA GROUNDWATER MONITORING WELL SUMMARY REPORT written by C. R. MARTINEZ and published by . This book was released on 2003 with total page 211 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report describes the calendar year (CY) 2003 field activities associated with the installation of two new groundwater monitoring wells in the A-AX Waste Management Area (WMA) and four groundwater monitoring wells in WMA C in the 200 East Area of the Hanford Nuclear Reservation. All six wells were installed by Fluor Hanford Inc. (FH) for CH2M Hill Hanford Group, Inc. (CHG) in support of Draft Hanford Facility Agreement and Consent Order (Tri-Party Agreement) M-24-00 milestones and ''Resource Conservation and Recovery Act of 1976'' (RCRA) groundwater monitoring requirements. Drilling data for the six wells are summarized in Table 1.

Book Data Quality Objectives Summary Report for Establishing a RCRA CERCLA AEA Integrated 200 West and 200 East Area Groundwater Monitoring Network

Download or read book Data Quality Objectives Summary Report for Establishing a RCRA CERCLA AEA Integrated 200 West and 200 East Area Groundwater Monitoring Network written by Mark E. Byrnes and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Description of Work for the Installation of 3 Groundwater Wells at the 100 KR 4 and 200 ZP 1 Pump and Treat Remediation System FY2003 Cercla Drilling

Download or read book Description of Work for the Installation of 3 Groundwater Wells at the 100 KR 4 and 200 ZP 1 Pump and Treat Remediation System FY2003 Cercla Drilling written by and published by . This book was released on 2002 with total page 45 pages. Available in PDF, EPUB and Kindle. Book excerpt: This description of work (DOW) documents the requirements for three wells to be drilled and constructed in fiscal year 2003 as part of the 100 KR-4 and 200-ZP-1 groundwater Pump-and-Treat Remediation Facilities on the Hanford Site. Installation of these wells is to replace two existing extraction wells in the 100-KR-4 and 200-ZP-1 Pump-and Treat Systems, and the installation of one new monitoring well at 100-KR-4. Process design upgrades to the 100-K pump and treat system will not be covered in this document. A site plan view map of the 100-KR-4 Pump and Treat Facility is presented in Figure 8-1. A site map of the new well location at the 200-ZP-1 Pump and Treat Facility is in Figure 8-2. The proposed 100-KR-4 extraction well (C4117) will be located 4.6 meters (15 feet) southeast of existing extraction well 199-K-112A. The new monitoring well (C4120) will be approximately 300 meters (980 feet) northeast of 199-K-112A (Figure 8-1). The proposed 200-ZP-1 extraction well (C4119) will be located near extraction well 299-W15-33 (Figure 8-2). Construction parameters for the three wells will be based on existing wells and on geologic conditions encountered during drilling, and discussed in detail in Section 3.0. The 100-KR-4 Operable Unit contains numerous culturally sensitive areas. Because of these areas, access will be severely limited and off-road travel forbidden.

Book Data Summary Report  Southern Sector Monitoring Well Installations

Download or read book Data Summary Report Southern Sector Monitoring Well Installations written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides construction documentation for four double-screen monitoring wells installed as part of the groundwater monitoring strategy identified in the Groundwater Effectiveness Monitoring Strategy for the Proposed Southern Sector Phase I Groundwater Corrective Action (WSRC-RP-99-4114, Rev. 0, July 1999). The proposed corrective action includes In-Well Vapor Stripping Wells SSR-001 through SSR-012, designed to intercept and ameliorate the TCE and PCE plumes at the 500 parts per billion isoconcentration contour. The four monitoring wells (SSM-10, -15A, -16-, and -17) constructed during this project are designed to monitor the effectiveness of the In-Well Vapor Stripping Well system. One monitoring well (SSM-10) is located hydraulically upgradient of vapor stripping wells. The other three wells are located hydraulically downgradient of the vapor stripping wells. Four monitoring wells additional to those describe in this report will be installed for effectiveness monitoring in the future.

Book Data Quality Objective Summary Report for Drilling Waste Associated with the Q Well for the 200 UP 1 Groundwater Monitoring Network

Download or read book Data Quality Objective Summary Report for Drilling Waste Associated with the Q Well for the 200 UP 1 Groundwater Monitoring Network written by Gregory S. Thomas and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Groundwater Monitoring Well Installation Report

Download or read book Groundwater Monitoring Well Installation Report written by Los Angeles County Metropolitan Transportation Authority and published by . This book was released on 2002 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Data Quality Objectives Summary Report

Download or read book Data Quality Objectives Summary Report written by Mark D. Sweeney and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: