EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Fort Sheridan  Phase II Remedial Investigation Feasibility Study  Department of Defense Operable Unit  Technical Plan  Addendum

Download or read book Fort Sheridan Phase II Remedial Investigation Feasibility Study Department of Defense Operable Unit Technical Plan Addendum written by and published by . This book was released on 1997 with total page 49 pages. Available in PDF, EPUB and Kindle. Book excerpt: The additional study areas to be investigated under the Fort Sheridan DOD OU RI/Feasibility Study (FS) are described in the following sections. The locations of the study areas are shown in Figure 2-1. The study area descriptions summarize the known history and principal findings at each study area from previous investigations. The primary sources of historical information include the Final Archives Search Report (ACE 1996), aerial photographs, discussions with project personnel, and review of historical maps and data obtained from Fort Sheridan.

Book Remedial Investigation feasibility Study Work Plan and Addenda for Operable Unit 4 12

Download or read book Remedial Investigation feasibility Study Work Plan and Addenda for Operable Unit 4 12 written by and published by . This book was released on 1993 with total page 1148 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Book Remedial Investigation feasibility Study Field Sampling Plan Addendum for Area 40 Supplemental Investigation Island Operable Unit Aerojet Superfund Site

Download or read book Remedial Investigation feasibility Study Field Sampling Plan Addendum for Area 40 Supplemental Investigation Island Operable Unit Aerojet Superfund Site written by and published by . This book was released on 2014 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation feasibility Study

Download or read book Remedial Investigation feasibility Study written by United States. Army. Corps of Engineers and published by . This book was released on 1990 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase I and II Feasibility Study Report for the 300 FF 5 Operable Unit

Download or read book Phase I and II Feasibility Study Report for the 300 FF 5 Operable Unit written by and published by . This book was released on 1993 with total page 198 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018.

Book Feasibility Study  FS  and Remedial Investigation Site Inspection  RI SI   Addendum for Fort George G  Meade  Maryland  Revision 2

Download or read book Feasibility Study FS and Remedial Investigation Site Inspection RI SI Addendum for Fort George G Meade Maryland Revision 2 written by and published by . This book was released on 1993 with total page 95 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Quality Control Plan has been prepared to address the Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI) Addendum activities and a Change Order to Delivery Order No. 0009 dated July 15, 1993, at the Fort George G. Meade (FGGM). It has been prepared for the U.S. Army Environmental Center (USAEC), formerly the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA), to fulfill the requirement of deliverable ELIN A004 under Task Order 0009 of TEPS contract DAAA15-9l-D-00l6. It has been developed in accordance with the USATHAMA Quality Assurance Program, USATHAMA Geotechnical Requirements, and Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA.

Book Remedial Investigation  Feasibility Study Work Plan for the 200 UP 2 Operable Unit  Handford Site  Richland  Washington

Download or read book Remedial Investigation Feasibility Study Work Plan for the 200 UP 2 Operable Unit Handford Site Richland Washington written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 1992 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Offpost Operable Unit Remedial Investigation Endangerment Assessment Feasibility Study  Draft Final Work Plan

Download or read book Offpost Operable Unit Remedial Investigation Endangerment Assessment Feasibility Study Draft Final Work Plan written by and published by . This book was released on 1989 with total page 91 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document presents the scope of work for additional data collection activities and interpretive reports to be performed in the off-post operable unit (OU) for preparation of: (1) Addendum to the final remedial investigation report; (2)' Revision of the draft final endangerment assessment/feasibility study. The plan is divided into the following sections: (1) Requirements for the RI addendum - technical approach and data collection program for the RI addendum - technical approach and data collection program for ground water, soil, sediment, biota, air; (2) Revision of the endagerment assessment - items that need to be reevaluated; (3) Revision of the feasibility study - evaluation of different media and ARAR's development of remedial alternatives; (4) Schedule and description of deliverables. Appendix a contains a detailed approach for the 96th avenue risk assessment.-BKA.

Book Offpost Operable Unit Remedial Investigation  Final Addendum

Download or read book Offpost Operable Unit Remedial Investigation Final Addendum written by and published by . This book was released on 1992 with total page 577 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation feasibility Study Work Plan for the 300 FF 1 Operable Unit  Hanford Site  Richland  Washington

Download or read book Remedial Investigation feasibility Study Work Plan for the 300 FF 1 Operable Unit Hanford Site Richland Washington written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 1990 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase 1 and 2 Feasibility Study Report for the 300 FF 1 Operable Unit

Download or read book Phase 1 and 2 Feasibility Study Report for the 300 FF 1 Operable Unit written by and published by . This book was released on 1993 with total page 289 pages. Available in PDF, EPUB and Kindle. Book excerpt: The 300-FF-1 Operable Unit (OU) feasibility study (FS) presented in this document completes the FS process only through the first two study phases: Phase I, Remedial Alternatives Development, and Phase II, Remedial Alternatives Screening in accordance with CERCIA guidance for performing Remedial Investigations and Feasibility Studies (RI/FS) (EPA 1988a). This Phase I/II study provides a generalized view of workable remedial technologies as applied to the site contamination problems as a whole. Phase III, Detailed Analysis of Alternatives, will be performed at a later date to further evaluate screened alternatives based on the nine criteria in the CERCLA RI/FS guidance. The purpose of this Phase I/II FS is to develop and screen a range of alternatives for remediation of contamination present in the vadose zone of the 300-FF-1 OU. The scope of work for this Phase I/II FS includes five primary tasks: 1. Review existing documents and their associated data from relevant investigations and studies; 2. Establish remedial action objectives (RAO) and general response actions (GRA); 3. Identify applicable or relevant and appropriate requirements (ARARS) pertinent to all general response actions (including waste disposal); 4. Develop remedial alternatives (Phase I) applicable to the 300-FF-1 OU including identification and screening of technologies and process options, and assembly of remedial alternatives from representative technology types; 5. Screen alternatives (Phase II) developed in Phase I for implementability, effectiveness, and cost to identify those alternatives which warrant advancement to the detailed analysis phase (Phase III) of the FS.

Book Remedial Investigation feasibility Study Work Plan for the 300 FF 5 Operable Unit  Hanford Site  Richland  Washington

Download or read book Remedial Investigation feasibility Study Work Plan for the 300 FF 5 Operable Unit Hanford Site Richland Washington written by United States. Department of Energy and published by . This book was released on 1990 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation feasibility Study Work Plan for the 100 FR 1 Operable Unit  Hanford Site  Richland  Washington

Download or read book Remedial Investigation feasibility Study Work Plan for the 100 FR 1 Operable Unit Hanford Site Richland Washington written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 1991 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation Feasibility Study  Operable Unit 5  Elmendorf AFB  Anchorage  Alaska  Volume 1  Text

Download or read book Remedial Investigation Feasibility Study Operable Unit 5 Elmendorf AFB Anchorage Alaska Volume 1 Text written by and published by . This book was released on 1994 with total page 715 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Final Report for Operable Unit 5 (OU 5) is provided per the statement of work for the Remedial investigation/Feasibility Study for (RI/FS) OU 5. The RI portion of the report covers the site background, field investigations, nature and extent of contamination, conceptual model, and baseline risk assessment. The purpose of the RI is to define the contamination at OU 5 and the effects of the contamination on human health and the environment. The FS covers: (1) remedial action objectives, (2) an identification and screening of potentially applicable technologies, (3) a development and screening of alternatives which combine these technologies, and (4) a detailed analysis of the most applicable alternatives. The analysis considers the nine CERCLA evaluation criteria. The alternatives are evaluated according to their combined effectiveness, implementability, and cost scores. Based on the analysis, the most cost-effective alternatives are identified. Remedial action objectives, ARARs, Detailed analysis of alternatives, Operable Unit 5, Remedial investigation/feasibility study, Elmendorf AFB, Alaska.

Book Operable Unit D Remedial Investigation Report

Download or read book Operable Unit D Remedial Investigation Report written by CH2M HILL SACRAMENTO CA. and published by . This book was released on 1994 with total page 1225 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report has been prepared for the Air Force by CH2M HILL for the purpose of aiding in the implementation of a final remedial action plan under the Air Force Installation Restoration Program (IRP). As the report relates to actual or possible releases of potentially hazardous substances, its release prior to an Air Force final decision on remedial action may be in the public's interest. The limited objectives of this report and the ongoing nature of the IRP, along with the evolving knowledge of site conditions and chemical effects on the environment and health, must be considered when evaluating this report, since subsequent facts may become known which may make this report premature or inaccurate. Acceptance of this report in performance of the contract under which it is prepared does not mean that the Air Force adopts the conclusions, recommendations, or other views expressed herein, which are those of the contractor only and do not necessarily reflect the official position of the Air Force.