EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Final Report for Tank 241 T 109  Auger Samples 95 AUG 040 and 95 AUG 041

Download or read book Final Report for Tank 241 T 109 Auger Samples 95 AUG 040 and 95 AUG 041 written by and published by . This book was released on 1995 with total page 212 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document serves as the final report for the tank T-109 auger samples collected on August 18 and 21, 1995.

Book Final Report for Tank 241 B 112  Auger Samples 95 AUG 014 and 95 AUG 015  Revision 1

Download or read book Final Report for Tank 241 B 112 Auger Samples 95 AUG 014 and 95 AUG 015 Revision 1 written by and published by . This book was released on 1995 with total page 110 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document reports the sampling events for tank 241-B-112.

Book Final Report for Tank 241 BY 103  Auger Samples 95 AUG 012 and 95 AUG 013  Revision 1

Download or read book Final Report for Tank 241 BY 103 Auger Samples 95 AUG 012 and 95 AUG 013 Revision 1 written by and published by . This book was released on 1995 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document summarizes the sampling activities for tank 241-BY-103.

Book Final Report for Tank 241 BX 112  Auger Samples 95 Aug 047 and 95 Aug 048

Download or read book Final Report for Tank 241 BX 112 Auger Samples 95 Aug 047 and 95 Aug 048 written by and published by . This book was released on 1996 with total page 84 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document serves as the final report for Tank 241-BX-112. The auger samples were taken on Nov. 16 and 17, 1995. The report is broken into 2 parts; the nd part consists of the original 45-day safety screening report (including the DSC and TGA raw data). Prior to auger sampling, the vapor space of tank BX-112 was screened for flammability issues; the vapor space was found to be far below the lower explosive limit. The auger samples were taken to fully satisfy the DQO.

Book Revised Final Report for Tank 241 C 203  Auger Samples 95 AUG 20 and 95 AUG 21  Revision 1

Download or read book Revised Final Report for Tank 241 C 203 Auger Samples 95 AUG 20 and 95 AUG 21 Revision 1 written by and published by . This book was released on 1995 with total page 131 pages. Available in PDF, EPUB and Kindle. Book excerpt: Two auger samples from tank 241-C-203 (C-203) were received at the 222-S Laboratories and underwent safety screening analyses, consisting of differential scanning calorimetry (DSC), thermogravimetric analysis (TGA), and total alpha activity. No notification limits were exceeded for the analyses. Two samples were submitted for a density determination at the request of Characterization Plant Engineering. SCOPE This document is the revised final report for the tank C-203 auger samples collected on April 5, 1995 (samples 95-AUG-20 and 95-AUG-021).

Book 45 day Safety Screen Results and Final Report for Tank 241 C 203  Auger Samples 95 AUG 020 and 95 AUG 021

Download or read book 45 day Safety Screen Results and Final Report for Tank 241 C 203 Auger Samples 95 AUG 020 and 95 AUG 021 written by and published by . This book was released on 1995 with total page 90 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document serves as the 45-day report deliverable for the tank C-203 auger samples collected on April 5, 1995 (samples 95-AUG-20 and 95-AUG-021). As no secondary analyses were required and no other analyses have been requested, this document also serves as the final report for C-203 auger sampling. Each sample was received, extruded, and analyzed by the 222-S Laboratories in accordance with the Tank Characterization Plan (TCP) referenced below. Included in this report are the primary safety screening results (DSC, TGA, and alpha) and density results. The worklists and raw data are included in this report. Photographs of the auger samples were taken during extrusion and, although not included in this report, are available.

Book 45 day Safety Screening Results and Final Report for Tank 241 BX 110  Auger Samples 95 AUG 045 and 95 AUG 046

Download or read book 45 day Safety Screening Results and Final Report for Tank 241 BX 110 Auger Samples 95 AUG 045 and 95 AUG 046 written by and published by . This book was released on 1995 with total page 91 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document summarizes the final results for the safety screening of tank 241-BX-110.

Book Final Report for Tank 241 C 204  Auger Samples 95 AUG 022 And95 AUG 023

Download or read book Final Report for Tank 241 C 204 Auger Samples 95 AUG 022 And95 AUG 023 written by and published by . This book was released on 1996 with total page 179 pages. Available in PDF, EPUB and Kindle. Book excerpt: Two auger samples from tank 241-C-204 (C-204) were submitted to the 222-S Laboratories for safety screening analyses, consisting of differential scanning calorimetry (DSC), thermogravimetric analysis (TGA), and total alpha activity. Sampling and analysis requirements are presented in the Sampling and Analysis Plan (SAP) (which was adapted with minimal changes from the original Tank Characterization Plan. The Tank Characterization Plan was subsequently revised, and the sampling and analytical requirements were inadvertently deleted). The DSC results for all samples from the tank exceeded the action limit of 481 J/g. Secondary analyses [total organic carbon (TOC) and adiabatic calorimetry], as negotiated with the safety program, were performed. The TOC results also exceeded the action limit of 3 weight percent. However, the moisture content of the samples is between 50 and 60%, and the results of adiabatic calorimetry testing indicated that the sample material would not support a propagating exothermic reaction. Primary and secondary analytical results were reported previously. The 90-day report indicated that additional heat capacity and DSC tests would be performed to further interpret the adiabatic calorimetry results. However, the laboratory has not been able to successfully perform heat capacity tests at this time. Therefore, this report is being issued without these results to provide a permanent record of the analytical work to date. Should the laboratory acquire the capability of performing these tests in the future, the safety program should consider whether further analysis of the remaining C-204 samples is worthwhile. Organic speciation was also performed at the direction of the safety program. These analyses were performed by Battelle in the 329 Laboratory. These analyses were not performed to the controls in the SAP, but were performed to a Letter of Instruction. The results indicate that the sample tested had an extremely high concentration of tributyl phosphate. Some dibutyl phosphate was also present. Other organics were present in only trace quantities.

Book 60 day Safety Screen Results and Final Report for Tank 241 C 111  Auger Samples 95 Aug 002  95 Aug 003  95 Aug 016  and 95 Aug 017

Download or read book 60 day Safety Screen Results and Final Report for Tank 241 C 111 Auger Samples 95 Aug 002 95 Aug 003 95 Aug 016 and 95 Aug 017 written by and published by . This book was released on 1995 with total page 280 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report presents the details of the auger sampling events for underground waste tank C-111. The samples were shipped to the 222-S laboratories were they underwent safety screening analysis and primary ferricyanide analysis. The samples were analyzed for alpha total, total organic carbon, cyanide, Ni, moisture, and temperature differentials. The results of this analysis are presented in this document.

Book Gesch  ftsbericht der Kreissparkasse Merseburg

Download or read book Gesch ftsbericht der Kreissparkasse Merseburg written by and published by . This book was released on 1938 with total page 20 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book 45 day Safety Screen Results and Final Report for Tank 241 C 202  Auger Samples 95 Aug 026 and 95 Aug 027

Download or read book 45 day Safety Screen Results and Final Report for Tank 241 C 202 Auger Samples 95 Aug 026 and 95 Aug 027 written by and published by . This book was released on 1995 with total page 72 pages. Available in PDF, EPUB and Kindle. Book excerpt: Two auger samples from tank 241-C-202 (C-202) were received at the 222-S Laboratories and underwent safety screening analysis, consisting of differential scanning calorimetry (DSC), thermogravimetric analysis (TGA), and total alpha activity. Two samples were submitted for energetics determination by DSC. Within the triplicate analyses of each sample, one of the results for energetics exceeded the notification limit. The sample and duplicate analyses for both augers exceeded the notification limit for TGA. As required by the Tank Characterization Plan, the appropriate notifications were made within 24 hours of official confirmation that the limits were violated.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1995 with total page 816 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Data Interpretation Report on Tank 241 BY 104 Auger Samples

Download or read book Data Interpretation Report on Tank 241 BY 104 Auger Samples written by J. W. Neksas and published by . This book was released on 1993 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Final Report for Tank 241 AP 101  Grab Samples 1AP 95 1  1AP 95 2  1AP 95 3  1AP 95 4  1AP 95 5  and 1AP 95 6

Download or read book Final Report for Tank 241 AP 101 Grab Samples 1AP 95 1 1AP 95 2 1AP 95 3 1AP 95 4 1AP 95 5 and 1AP 95 6 written by and published by . This book was released on 1996 with total page 711 pages. Available in PDF, EPUB and Kindle. Book excerpt: Six supernate grab samples (1AP-95-1 through 6) and one field blank (1AP-95-7) were taken from tank 241-AP-101, on Nov. 10 and 13, 1995. Analyses were performed in support of the Safety Screening and the Waste Compatibility Safety programs. All analytical results were within the action limits stated in the TSAP.

Book Final Report for Tank 241 AN 102  Grab Samples 2AN 95 1 Through 2AN 95 6 and 102 AN 1 Through 102 AN 4

Download or read book Final Report for Tank 241 AN 102 Grab Samples 2AN 95 1 Through 2AN 95 6 and 102 AN 1 Through 102 AN 4 written by and published by . This book was released on 1996 with total page 862 pages. Available in PDF, EPUB and Kindle. Book excerpt: Ten grab samples (2AN-95-1, 2, 3, 4A, 5A; 102-AN-1, 2, 3(A), 3(B), and 4) and one field blank (2AN-95-6) were taken from tank 241-AN-102. In support of the safety screening program, total organic carbon and cyanide were performed as secondary analyses because the differential scanning calorimetry results exceeded the notification limit. These were compared to safety screening limits at a confidence level of 95%. Waste compatibility analyses were performed on the 3 supernate samples and the field blank from the latest sampling event. Results presented in the 45 day and in this report show that the waste in Tank 241-AN-1D2 has energetics greater than 480 J/g (dry) and total organic carbon> 3 wt%; however, with a moisture content> 17 wt%, the tank may be considered c̀̀onditionally ̀̀safe in accordance with the Data Quality Objective to Support Resolution of the Organic Complexant Safety Issue.