EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Environmental Assessment  Proposed Seat and Canopy Staging Building  Hill Air Force Base  Utah

Download or read book Environmental Assessment Proposed Seat and Canopy Staging Building Hill Air Force Base Utah written by and published by . This book was released on 2010 with total page 54 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hill Air Force Base (AFB) proposes to provide an improved staging building in which seats and canopies from F-22 aircraft can be safely and efficiently stored while the aircraft are being repaired. The findings of this EA indicate that the proposed action would not have significant adverse effects on the human environment or any of the environmental resources as described in the EA. Therefore, it is concluded that a Finding of No Significant Impact is justified.

Book Environmental Assessment  EA   Proposed Renovation of Building 238  Hill Air Force Base  Utah

Download or read book Environmental Assessment EA Proposed Renovation of Building 238 Hill Air Force Base Utah written by and published by . This book was released on 2006 with total page 42 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hill Air Force Base (AFB) proposes to accommodate current United States Air Force missions by renovating Building 238, to include: gas turbine engine cells; a bearing shop; lean manufacturing systems; a product development laboratory; an optical shop and low-observable painting facility; a 5-axis router; a paint training facility; plating and pretreatment processes; and a flame spray booth. The proposed action, alternate locations, and the no action alternative were all considered. The proposed action could be implemented with minor construction-related air emissions of short term duration. Projected long term air emissions fall within the limits prescribed by the Hill AFB Title V permit. The proposed action would produce regulated solid and liquid waste streams including paper wipes; maskants; rags; filters from plating and parts washers; bearing grease; air filters; water from parts washing and pressure testing; paint residue; plating solution and rinse water; and motor oil. All non-recyclable regulated materials would be collected and disposed as hazardous waste (some of the liquid wastes would be treated in the Hill AFB industrial wastewater treatment plant). The proposed action would be expected to produce 34 long-term jobs at Hill AFB. No long-term environmental impacts are expected.

Book Environmental Assessment  EA   Proposed Carriage Test Facility  Hill Air Force Base  Utah

Download or read book Environmental Assessment EA Proposed Carriage Test Facility Hill Air Force Base Utah written by and published by . This book was released on 2004 with total page 32 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of the proposed action is to accommodate current United States Air Force (USAF) missions by constructing a carriage test facility to the east of Building 847 at Hill Air Force Base (AFB). The facility would be used to conduct testing and repair of transfer carriages that are used to hold and transport Minuteman (MM) stage I motors. The facility would house a reaction mass (a weight to be placed on each carriage for testing its ability to perform as intended) for a test stand to meet MM loads for stage I motors, and an overhead crane. The proposed action is needed because it is required by weapons safety concerns. A risk assessment code 3 (RAC 3) safety violation was identified at the current location, Oasis Building 30024 at the Utah Test and Training Range (UTTR). The RAC 3 safety violation is related to lack of sufficient floor space. Additionally, the presence of carriage test equipment is encroaching upon designated fire egress routes.

Book Final Environmental Assessment  Proposed Demolition of 12 Structures  Hill Air Force Base  Utah

Download or read book Final Environmental Assessment Proposed Demolition of 12 Structures Hill Air Force Base Utah written by and published by . This book was released on 2005 with total page 32 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hill AFB proposes to accommodate current United States Air Force (USAF) missions by demolishing 12 structures on Hill AFB. All 12 buildings have both aged and deteriorated to the point they cannot be economically repaired or remodeled. Seven of the 12 buildings would be demolished without being replaced in kind. For five of the 12 buildings, military construction (MILCON) projects would provide new facilities to house the activities that are or were being performed in the deteriorated structures. The proposed action and the no action alternative were both considered in detail. Following the demolition phase, backfill and revegetation operations would prevent erosion of the site. The proposed action could be implemented with minor air emissions of short term duration. During demolition activities, solid wastes and wastes containing asbestos, lead-based paint, PCBs, mercury, asphalt, petroleum products, and any contaminated soils would all be stored, transported, disposed, and/or recycled properly. The proposed demolition projects would have an adverse effect on cultural resources, but mitigation efforts would be conducted according to an existing MOA with the Utah SHPO. No long-term environmental impacts are expected from either the proposed action or the no action alternative.

Book Final Environmental Assessment  Proposed Renovation of Building 225  Hill Air Force Base  Utah

Download or read book Final Environmental Assessment Proposed Renovation of Building 225 Hill Air Force Base Utah written by and published by . This book was released on 2005 with total page 31 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hill AFB proposes to accommodate current United States Air Force (USAF) missions by renovating Building 225 on Hill AFB. The proposed action is needed to meet operational requirements and to provide safe working conditions. The proposed building renovation would include completing a variety of structural upgrades, replacing degraded functional systems, removing asbestos and lead based paint, improving security access controls, and completing the renovation while conforming to any historical preservation constraints identified for this hangar.

Book Environmental Assessment  EA   Proposed Aircraft Power Systems Repair Transformation Facility  Hill Air Force Base  Utah

Download or read book Environmental Assessment EA Proposed Aircraft Power Systems Repair Transformation Facility Hill Air Force Base Utah written by and published by . This book was released on 2007 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt: Construct an Aircraft Power Systems Repair Transformation Facility at Hill Air Force Base (AFB), Utah. Hill AFB proposes to accommodate current United States Air Force (USAF) missions by constructing a new aircraft power systems repair transformation facility (power systems facility) in which to perform a greater number and variety of component level repairs of aircraft auxiliary drive engine and gearbox components. The proposed power systems facility and associated parking lot would be located in the vicinity of Building 245, comprising approximately 3.4 acres. A portion of the existing parking lot to the south of Building 245 could be removed. Building 244 could be demolished. Sixteen trees would likely be removed. The following criteria were used to assemble alternatives. The facility that accommodates the commodities maintenance group's (309 CMXG) modification, repair, and maintenance functions should: 1. Have sufficient space to house all of the necessary equipment and workers. 2. Be located in close proximity to Building 238 to allow efficient completion of workload. 3. Incorporate all currently-required technologies. 4. Provide security measures for the various weapon system programs. 5. Be protective of facilities, human health, and the environment.

Book Environmental Assessment  EA   Proposed Well and Reservoir  Roy City Corporation   Hill Air Force Base  Utah

Download or read book Environmental Assessment EA Proposed Well and Reservoir Roy City Corporation Hill Air Force Base Utah written by and published by . This book was released on 2006 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hill AFB will allow Roy City Corporation to provide improvements to its culinary water system. The proposed action, alternate locations, and the no action alternative were all considered. Temporary construction related emissions would be created. Long-term air emissions would be limited to operating the emergency generator approximately 100 hours per year. Solid and liquid wastes containing regulated products would all be properly stored, transported, disposed Hill AFB will allow Roy City Corporation to provide improvements to its culinary water system. The proposed action, alternate locations, and the no action alternative were all considered. Temporary construction related emissions would be created. Long-term air emissions would be limited to operating the emergency generator approximately 100 hours per year. Solid and liquid wastes containing regulated products would all be properly stored, transported, disposed, re-used, and/or recycled. Secondary containment would be provided for 250 gallons of diesel fuel. Following construction, most of the area would be revegetated using a native-plant based seed mix. The area disturbed by construction activities would be restored to its original condition. If contaminated soils exist, they would be properly handled. Proper well abandonment and installation procedures would be followed. No adverse cumulative environmental impacts are expected., re-used, and/or recycled. Secondary containment would be provided for 250 gallons of diesel fuel. Following construction, most of the area would be revegetated using a native-plant based seed mix. The area disturbed by construction activities would be restored to its original condition. If contaminated soils exist, they would be properly handled. Proper well abandonment and installation procedures would be followed. No adverse cumulative environmental impacts are expected.

Book Environmental Assessment  Proposed Armament Overhaul and Test Facility  Hill Air Force Base  Utah

Download or read book Environmental Assessment Proposed Armament Overhaul and Test Facility Hill Air Force Base Utah written by and published by . This book was released on 2005 with total page 37 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hill AFB proposes to construct an armament overhaul and test facility. This facility would eliminate batching, minimize component travel time, and reduce work in process. USAF managers propose to implement technological advancements in fired round collection and laser image projection systems to more accurately determine pattern disbursement and acceleration rates. More accurate initial tests would decrease retesting requirements. The proposed action and the no action alternative were both considered in detail. The proposed action could be implemented with minor environmental impacts. If contaminated soils exist, they would be properly handled during the construction process. Following the construction phase, backfill and paving operations would prevent erosion of the site. The proposed action could be implemented with minor air emissions of both short term and long term duration. A natural gas-fired boiler would produce minor ongoing air emissions. The facility's operational air emissions and solid and hazardous waste streams would not be newly created; they would be relocating from other on-base locations. No cumulative environmental impacts are expected from either the proposed action or the no action alternative.

Book Environmental Impact Analysis Process

Download or read book Environmental Impact Analysis Process written by United States. Department of the Air Force and published by . This book was released on 1977 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment  Proposed Automotive Arts and Crafts Skills Center  Hill Air Force Base  Utah

Download or read book Environmental Assessment Proposed Automotive Arts and Crafts Skills Center Hill Air Force Base Utah written by and published by . This book was released on 2010 with total page 53 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hill Air Force Base (AFB) proposes to provide adequate facilities for hobby enthusiasts, including automotive maintenance, engraving, framing, and woodworking. The findings of this EA indicate that the proposed action would not have significant adverse effects on the human environment or any of the environmental resources as described in the EA. Therefore, it is concluded that a Finding of No Significant Impact is justified.

Book Proposed Final Environmental Assessment Combat Logistics Support Squadron  CLSS  Training storage Facility Hill Air Force Base  Utah

Download or read book Proposed Final Environmental Assessment Combat Logistics Support Squadron CLSS Training storage Facility Hill Air Force Base Utah written by and published by . This book was released on 2000 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment  EA

Download or read book Environmental Assessment EA written by and published by . This book was released on 2000 with total page 17 pages. Available in PDF, EPUB and Kindle. Book excerpt: