EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Environmental Assessment of Remedial Action at the Lowman Uranium Mill Tailings Site Near Lowman  Idaho  Final

Download or read book Environmental Assessment of Remedial Action at the Lowman Uranium Mill Tailings Site Near Lowman Idaho Final written by and published by . This book was released on 1991 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document assesses the environmental impacts of stabilization on site of the contaminated materials at the Lowman uranium mill tailings site. The Lowman site is 0.5 road mile northeast of the unincorporated village of Lowman, Idaho, and 73 road miles from Boise, Idaho. The Lowman site consists of piles of radioactive sands, an ore storage area, abandoned mill buildings, and windblown/waterborne contaminated areas. A total of 29.5 acres of land are contaminated and most of this land occurs within the 35-acre designated site boundary. The proposed action is to stabilize the tailings and other contaminated materials on the site. A radon barrier would be constructed over the consolidated residual radioactive materials and various erosion control measures would be implemented to ensure the long-term stability of the disposal cell. Radioactive constituents and other hazardous constituents were not detected in the groundwater beneath the Lowman site. The groundwater beneath the disposal cell would not become contaminated during or after remedial action so the maximum concentration limits or background concentrations for the contaminants listed in the draft EPA groundwater protection standards would be met at the point of compliance. No significant impacts were identified as a result of the proposed remedial action at the Lowman site.

Book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Lowman  Idaho  Attachment 4  Water Resources Protection Strategy

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Lowman Idaho Attachment 4 Water Resources Protection Strategy written by and published by . This book was released on 1991 with total page 29 pages. Available in PDF, EPUB and Kindle. Book excerpt: The DOE proposes to achieve compliance with the proposed EPA groundwater protection standards (Subparts A and B of 40 CFR 192) by meeting the EPA maximum concentration limits (MCLs) or background concentrations for designated hazardous constituents in groundwater in the uppermost aquifer (alluvium/weathered granodiorite) at the point of compliance (POC) at the Lowman disposal site near Lowman, Idaho. The proposed remedial action in conjunction with existing hydrogeological conditions at the Lowman site will ensure sufficient protection of human health and the environment. The DOE has concluded that the EPA groundwater protection standards will be met at the POC because, with the exception of antimony, none of the hazardous constituents that exceed laboratory method detection limits within the radioactive sand pore fluids were above the proposed concentration limits. The DOE has demonstrated that antimony will meet the proposed concentration limits at the POC through attenuation in subsoils beneath the disposal cell and by dilution in groundwater underflow. The Lowman processing site is in compliance with Subpart B of 40 CFR 192 because statistical analyses of groundwater samples indicate no groundwater contamination.

Book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Lowman  Idaho

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Lowman Idaho written by and published by . This book was released on 1991 with total page 29 pages. Available in PDF, EPUB and Kindle. Book excerpt: The DOE proposes to achieve compliance with the proposed EPA groundwater protection standards (Subparts A and B of 40 CFR 192) by meeting the EPA maximum concentration limits (MCLs) or background concentrations for designated hazardous constituents in groundwater in the uppermost aquifer (alluvium/weathered granodiorite) at the point of compliance (POC) at the Lowman disposal site near Lowman, Idaho. The proposed remedial action in conjunction with existing hydrogeological conditions at the Lowman site will ensure sufficient protection of human health and the environment. The DOE has concluded that the EPA groundwater protection standards will be met at the POC because, with the exception of antimony, none of the hazardous constituents that exceed laboratory method detection limits within the radioactive sand pore fluids were above the proposed concentration limits. The DOE has demonstrated that antimony will meet the proposed concentration limits at the POC through attenuation in subsoils beneath the disposal cell and by dilution in groundwater underflow. The Lowman processing site is in compliance with Subpart B of 40 CFR 192 because statistical analyses of groundwater samples indicate no groundwater contamination.

Book Summary of the Phase II  Title I Engineering Assessment of Inactive Uranium Mill Tailings  Lowman Site  Lowman  Idaho

Download or read book Summary of the Phase II Title I Engineering Assessment of Inactive Uranium Mill Tailings Lowman Site Lowman Idaho written by and published by . This book was released on 1977 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: An engineering assessment was performed of the problems resulting from the existence of radioactive uranium sand residues at the Lowman, Idaho site. Services included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas release from the 90,000 tons of sand residues at the Lowman site constitutes the most significant environmental impact, although external gamma radiation is also a factor. The two alternative actions presented are dike construction, fencing, and maintenance; and consolidation of the piles, addition of a 2-ft-thick stabilization cover, and on-site cleanup. Both options include remedial action at off-site structures. Cost estimates for the two options are $393,000 and $590,000.

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 782 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment of Remedial Action at the Maybell Uranium Mill Tailings Site Near Maybell  Colorado  Revision 2  Uranium Mill Tailings Remedial Action Project

Download or read book Environmental Assessment of Remedial Action at the Maybell Uranium Mill Tailings Site Near Maybell Colorado Revision 2 Uranium Mill Tailings Remedial Action Project written by United States. Department of Energy and published by . This book was released on 1995 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment of Remedial Action at the Riverton Uranium Mill Tailings Site  Riverton  Wyoming

Download or read book Environmental Assessment of Remedial Action at the Riverton Uranium Mill Tailings Site Riverton Wyoming written by and published by . This book was released on 1987 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The US Department of Energy (DOE) has prepared an environmental assessment (DOE/EA-0254) on the proposed remedial action at the inactive uranium milling site near Riverton, Wyoming. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321, et seq.). Therefore, the preparation of an environmental impact statement (EIS) is not required.

Book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Lowman  Idaho

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Lowman Idaho written by and published by . This book was released on 1991 with total page 184 pages. Available in PDF, EPUB and Kindle. Book excerpt: This volume contains subcontract documents which include: bidding requirements; terms and conditions; specifications; and subcontract drawings.

Book Remedial Actions at the Former Vanadium Corporation of America Uranium Mill Site  Durango  La Plata County  Colorado  Appendices

Download or read book Remedial Actions at the Former Vanadium Corporation of America Uranium Mill Site Durango La Plata County Colorado Appendices written by and published by . This book was released on 1985 with total page 640 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment of Remedial Action at the Gunnison Uranium Mill Tailings Site Near Gunnison  Colorado  Final

Download or read book Environmental Assessment of Remedial Action at the Gunnison Uranium Mill Tailings Site Near Gunnison Colorado Final written by and published by . This book was released on 1992 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The presence of contaminated uranium mill tailings adjacent to the city of Gunnison has been a local concern for many years. The following issues were identified during public meetings that were held by the DOE prior to distribution of an earlier version of this EA. Many of these issues will require mitigation. Groundwater contamination; in December 1989, a herd of 105 antelope were introduced in an area that includes the Landfill disposal site. There is concern that remedial action-related traffic in the area would result in antelope mortality. The proposed Tenderfoot Mountain haul road may restrict antelope access to their water supply; a second wildlife issue concerns the potential reduction in sage grouse use of breeding grounds (leks) and nesting habitat; the proposed Tenderfoot Mountain haul road would cross areas designated as wetlands by US Army Corps of Engineers (COE); the proposed disposal site is currently used for grazing by cattle six weeks a year in the spring. Additional concerns were stated in comments on a previous version of this EA. The proposed action is to consolidate and remove all contaminated materials associated with the Gunnison processing site to the Landfill disposal site six air miles east of Gunnison. All structures on the site (e.g., water tower, office buildings) were demolished in 1991. The debris is being stored on the site until it can be incorporated into the disposal cell at the disposal site. All contaminated materials would be trucked to the Landfill disposal site on a to-be-constructed haul road that crosses BLM-administered land.