EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Environmental Assessment for the Proposed TA 16 Engineering Complex Refurbishment and Consolidation at Los Alamos National Laboratory  Los Alamos  New Mexico

Download or read book Environmental Assessment for the Proposed TA 16 Engineering Complex Refurbishment and Consolidation at Los Alamos National Laboratory Los Alamos New Mexico written by United States. National Nuclear Security Administration and published by . This book was released on 2002 with total page 69 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Continued Operation of Los Alamos National Laboratory

Download or read book Continued Operation of Los Alamos National Laboratory written by and published by . This book was released on 2008 with total page 800 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Final Environmental Assessment for the Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two Mile Mesa Complex Los Alamos National Laboratory  Los Alamos  New Mexico

Download or read book Final Environmental Assessment for the Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two Mile Mesa Complex Los Alamos National Laboratory Los Alamos New Mexico written by and published by . This book was released on 2003 with total page 5 pages. Available in PDF, EPUB and Kindle. Book excerpt: The National Environmental Policy Act of 1969 (NEPA) requires Federal agency officials to consider the environmental consequences of their proposed actions before decisions are made. In complying with NEPA, the United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA), follows the Council on Environmental Quality regulations (40 CFR 1500-1508) and DOE's NEPA implementing procedures (10 CFR 1021). The purpose of an environmental assessment (EA) is to provide Federal decision makers with sufficient evidence and analysis to determine whether to prepare an environmental impact statement (EIS) or issue a Finding of No Significant Impact. Los Alamos National Laboratory (LANL) is a national security laboratory located at Los Alamos, New Mexico, that comprises about 40 square miles (mi{sup 2}) (103.6 square kilometers [km{sup 2}]) of buildings, structures, and forested land (Figure 1). It is administered by NNSA for the Federal government and is managed and operated under contract by the University of California (UC). The NNSA must make a decision whether to consolidate and construct new facilities for the Dynamic Experimentation Division (DX) to create a central core area of facilities, including offices, laboratories, and other support structures, at LANL's Two-Mile Mesa Complex, which comprises portions of Technical Area (TA) 6, TA-22, and TA-40. This Proposed Action would involve constructing new buildings; consolidating existing operations and offices; enhancing utilities, roads, and security infrastructure; and demolishing or removing older buildings, structures, and transportables at various technical areas used by DX (Figure 2). This EA has been prepared to assess the potential environmental consequences of this proposed construction, operational consolidation, and demolition project. The objectives of this EA are to (1) describe the underlying purpose and need for NNSA action; (2) describe the Proposed Action and identify and describe any reasonable alternatives that satisfy the purpose and need for agency action; (3) describe baseline environmental conditions at LANL; (4) analyze the potential indirect, direct, and cumulative effects to the existing environment from implementation of the Proposed Action, and (5) compare the effects of the Proposed Action with the No Action Alternative and other reasonable alternatives. For the purposes of compliance with NEPA, reasonable alternatives are identified as being those that meet NNSA's purpose and need for action by virtue of timeliness, appropriate technology, and applicability to LANL. The EA process provides NNSA with environmental information that can be used in developing mitigative actions, if necessary, to minimize or avoid adverse effects to the quality of the human environment and natural ecosystems should NNSA decide to proceed with implementing the Proposed Action at LANL. Ultimately, the goal of NEPA, and this EA, is to aid NNSA officials in making decisions based on an understanding of environmental consequences and in taking actions that protect, restore, and enhance the environment.

Book Environmental Assessment for Proposed Construction and Operation of a New Office Building and Related Structures Within TA 3 at Los Alamos National Laboratory  Los Alamos  New Mexico

Download or read book Environmental Assessment for Proposed Construction and Operation of a New Office Building and Related Structures Within TA 3 at Los Alamos National Laboratory Los Alamos New Mexico written by United States. National Nuclear Security Administration and published by . This book was released on 2001 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Continued Operation of Los Alamos National Laboratory

Download or read book Continued Operation of Los Alamos National Laboratory written by and published by . This book was released on 2008 with total page 644 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment for the Proposed CMR Building Upgrades at the Los Alamos National Laboratory  Los Alamos  New Mexico

Download or read book Environmental Assessment for the Proposed CMR Building Upgrades at the Los Alamos National Laboratory Los Alamos New Mexico written by United States. Department of Energy. Los Alamos Area Office and published by . This book was released on 1997 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory  Los Alamos  New Mexico

Download or read book Draft Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory Los Alamos New Mexico written by and published by . This book was released on 2003 with total page 5 pages. Available in PDF, EPUB and Kindle. Book excerpt: NNSA, an agency within DOE, proposes to replace the Chemistry and Metallurgy Research (CMR) Building at Los Alamos National Laboratory (LANL). The CMRR EIS will examine the potential environmental impacts associated with the proposed action of consolidating and relocating the mission-critical CMR capabilities from a degraded building to a new modern building(s). The existing CMR Building, constructed in the early 1950s, houses most of LANL's analytical chemistry and materials characterization capabilities (AC and MC). Other capabilities at the CMR Building include actinide processing, waste characterization, and nondestructive analysis that support a variety of NNSA and DOE nuclear materials management programs. In 1992, DOE initiated planning and implementation of CMR Building upgrades to address specific safety, reliability, consolidation, and security and safeguards issues. Later, in 1997 and 1998, a series of operational, safety, and seismic issues surfaced regarding the long-term viability of the CMR Building. Because of these issues, DOE determined that the extensive upgrades originally planned would be much more expensive and time consuming and of only marginal effectiveness. As a result, DOE decided to perform only the upgrades necessary to ensure the safe and reliable operation of the CMR Building through 2010 and to seek an alternative path for long-term reliability. The CMRR EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with the proposed action. The Proposed Action is to replace the CMR Building. The Preferred Alternative is to construct a new CMRR Facility at Technical Area (TA) 55, consisting of two or three buildings. One of the new buildings would provide space for administrative offices and support functions. The other building(s) would provide secure laboratory spaces for research and analytical support activities. The buildings would be expected to operate for a minimum of 50 years. Tunnels may be constructed to connect the buildings. Alternative 2 would be to construct the new CMRR Facility within an undeveloped ''greenfield'' area near TA-55 at TA-6. Alternatives 3 and 4 would be to continue using the existing CMR Building for administrative offices and support functions with the implementation of minimal necessary structural and system upgrades and repairs, together with the construction of new nuclear laboratory building(s) at either TA-55 or TA-6. The EIS also presents an analysis of impacts associated with the dispositioning of all or portions of the existing CMR Building.

Book Environmental Assessment for the Proposed CMR Building Upgrades at the Los Alamos National Laboratory  Los Alamos  New Mexico

Download or read book Environmental Assessment for the Proposed CMR Building Upgrades at the Los Alamos National Laboratory Los Alamos New Mexico written by United States. Department of Energy. Los Alamos Area Office and published by . This book was released on 1996 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory  Los Alamos  New Mexico

Download or read book Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory Los Alamos New Mexico written by and published by . This book was released on 2003 with total page 5 pages. Available in PDF, EPUB and Kindle. Book excerpt: NNSA, an agency within DOE, proposes to replace the Chemistry and Metallurgy Research (CMR) Building at Los Alamos National Laboratory (LANL). The CMRR EIS examines the potential environmental impacts associated with the Proposed Action of consolidating and relocating the mission-critical CMR capabilities from a degraded building to a new modern building(s). The existing CMR Building, constructed in the early 1950s, houses most of LANL's analytical chemistry and materials characterization AC and MC capabilities. Other capabilities at the CMR Building include actinide processing, waste characterization, and nondestructive analysis that support a variety of NNSA and DOE nuclear materials management programs. In 1992, DOE initiated planning and implementation of CMR Building upgrades to address specific safety, reliability, consolidation, and security and safeguards issues. Later, in 1997 and 1998, a series of operational, safety, and seismic issues surfaced regarding the long-term viability of the CMR Building. Because of these issues, DOE determined that the extensive upgrades originally planned would be much more expensive and time consuming and of only marginal effectiveness. As a result, DOE decided to perform only the upgrades necessary to ensure the safe and reliable operation of the CMR Building through 2010 and to seek an alternative path for long-term reliability. The CMRR EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with the Proposed Action. The Proposed Action is to replace the CMR Building. The Preferred Alternative is to construct a new CMRR Facility at Technical Area (TA) 55, consisting of two or three buildings. One of the new buildings would provide space for administrative offices and support functions. The other building(s) would provide secure laboratory spaces for research and analytical support activities. The buildings would be expected to operate for a minimum of 50 years. Tunnels could be constructed to connect the buildings. Alternative 2 would be to construct the new CMRR Facility within an undeveloped ''greenfield'' area near TA-55 at TA-6. Alternatives 3 and 4 would be to continue using the existing CMR Building for administrative offices and support functions with the implementation of minimal necessary structural and system upgrades and repairs, together with the construction of new nuclear laboratory building(s) at either TA-55 or TA-6. The EIS also presents an analysis of impacts associated with the dispositioning of all or portions of the existing CMR Building.

Book Draft Environmental Assessment for the Proposed Construction and Operation of the Nonproliferation and International Security Center

Download or read book Draft Environmental Assessment for the Proposed Construction and Operation of the Nonproliferation and International Security Center written by and published by . This book was released on 1999 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment for Proposed Access Control and Traffic Improvements at Los Alamos National Laboratory  Los Alamos  New Mexico

Download or read book Environmental Assessment for Proposed Access Control and Traffic Improvements at Los Alamos National Laboratory Los Alamos New Mexico written by and published by . This book was released on 2002 with total page 5 pages. Available in PDF, EPUB and Kindle. Book excerpt: The National Nuclear Security Administration (NNSA) has assigned a continuing role to Los Alamos National Laboratory (LANL) in carrying out NNSA's national security mission. It is imperative that LANL continue this enduring responsibility and that NNSA adequately safeguard LANL capabilities. NNSA has identified the need to restrict vehicular access to certain areas within LANL for the purpose of permanently enhancing the physical security environment at LANL. It has also identified the need to change certain traffic flow patterns for the purpose of enhancing physical safety at LANL. The Proposed Action would include the construction of eastern and western bypass roads around the LANL Technical Area (TA) 3 area and the installation of vehicle access controls and related improvements to enhance security along Pajarito Road and in the LANL core area. This Proposed Action would modify the current roadway network and traffic patterns. It would also result in traversing Areas of Environmental Interest identified in the LANL Habitat Management Plan, demolition of part of an historic structure at Building 3-40, and traversing several potential release sites and part of the Los Alamos County landfill. The No Action Alternative was also considered. Under this alternative NNSA would not construct the eastern or western bypass roads, any access-control stations, or related improvements. Diamond Drive would continue to serve as the primary conduit for most vehicle traffic within the LANL core area regardless of actual trip destinations. The No Action Alternative does not meet NNSA's purpose and need for action. The proposed bypass road corridors traverse both developed and undeveloped areas. Several potential release sites are present. These would either be sampled and remediated in accordance with New Mexico Environment Department requirements before construction or avoided to allow for future remediation. In some cases, contaminant levels may fall below remediation thresholds and the Environmental Restoration Project would set requirements for workers. Structural bridges would be used to span canyons that are Areas of Environmental Interest because they include habitat for threatened and endangered species, or because they are 100-year floodplains or wetlands. Traffic congestion is not expected to increase once construction is completed. The Proposed Action would allow for a flexible approach to vehicle access controls in response to security conditions. Traffic safety within LANL would improve because access control would screen out drivers without a need to be in the LANL TA-3 area or along Pajarito Road. There would be adequate parking for University of California personnel and construction workers. Construction and demolition wastes would be transported to a licensed commercial landfill or recycled for other construction projects at LANL or offsite. Construction for the proposed bypass roads would be expected to produce only temporary and localized air and noise emissions. The Proposed Action would have no effects on visual resources, land use, socioeconomics, or environmental justice. The roadways would be designed to accommodate geologic and soil conditions. The demolition of part of Building 3-40 could have an adverse effect on historic structures since it is eligible for the National Register of Historic Places and, therefore, a treatment plan would be negotiated between NNSA and the State Historic Preservation Office.

Book Environmental Assessment for the Proposed CMR Building Upgrades at the Los Alamos National Laboratory  Los Alamos  New Mexico  Final Document

Download or read book Environmental Assessment for the Proposed CMR Building Upgrades at the Los Alamos National Laboratory Los Alamos New Mexico Final Document written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: In order to maintain its ability to continue to conduct uninterrupted radioactive and metallurgical research in a safe, secure, and environmentally sound manner, the US Department of Energy (DOE) proposes to upgrade the Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Building. The building was built in the early 1950s to provide a research and experimental facility for analytical chemistry, plutonium and uranium chemistry, and metallurgy. Today, research and development activities are performed involving nuclear materials. A variety of radioactive and chemical hazards are present. The CMR Building is nearing the end of its original design life and does not meet many of today's design codes and standards. The Proposed Action for this Environmental Assessment (EA) includes structural modifications to some portions of the CMR Building which do not meet current seismic criteria for a Hazard Category 2 Facility. Also included are upgrades and improvements in building ventilation, communications, monitoring, and fire protection systems. This EA analyzes the environmental effects of construction of the proposed upgrades. The Proposed Action will have no adverse effects upon agricultural and cultural resources, wetlands and floodplains, endangered and threatened species, recreational resources, or water resources. The Proposed Action would have negligible effects on human health and transportation, and would not pose a disproportionate adverse health or environmental impact on minority or low-income populations within an 80 kilometer (50 mile) radius of the CMR Building.

Book Environmental Assessment for the Proposed Construction and Operation of the Nonproliferation and International Security Center

Download or read book Environmental Assessment for the Proposed Construction and Operation of the Nonproliferation and International Security Center written by and published by . This book was released on 1999 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment for the Proposed Construction and Operations of a Biosafety Level 3 Facility at Los Alamos National Laboratory  Los Alamos  New Mexico

Download or read book Environmental Assessment for the Proposed Construction and Operations of a Biosafety Level 3 Facility at Los Alamos National Laboratory Los Alamos New Mexico written by and published by . This book was released on 2002 with total page 5 pages. Available in PDF, EPUB and Kindle. Book excerpt: The ''National Environmental Policy Act of 1969'' (NEPA) requires Federal agency officials to consider the environmental consequences of their proposed actions before decisions are made. In complying with NEPA, the United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA) follows the Council on Environmental Quality regulations (40 ''Code of Federal Regulations'' [CFR] 1500-1508) and DOE's own NEPA implementing procedures (10 CFR 1021). The purpose of an environmental assessment (EA) is to provide Federal decision-makers with sufficient evidence and analysis to determine whether to prepare an Environmental impact statement (EIS) or issue a Finding of No Significant Impact. This EA has been prepared to assess environmental consequences resulting from the construction and operation of a Biosafety Level 3 (BSL-3) laboratory facility within the boundaries of the Los Alamos National Laboratory (LANL). LANL is one of the national security laboratories under the authority of the Under Secretary for Nuclear Security of the NNSA who serves as the Administrator for Nuclear Security and Head of the NNSA (50 USC Chapter 41, Section 2402(b)). The objectives of this EA are to (1) describe the underlying purpose and need for NNSA action; (2) describe the Proposed Action and identify and describe any reasonable alternatives that satisfy the purpose and need for NNSA action; (3) describe baseline environmental conditions at LANL; (4) analyze the potential indirect, direct, and cumulative effects to the existing environment from implementation of the Proposed Action and other reasonable alternatives; and (5) compare the effects of the Proposed Action with the No Action Alternative and other reasonable alternatives. For the purposes of compliance with NEPA, reasonable alternatives are identified as being those that meet NNSA's purpose and need for action by virtue of timeliness, appropriate technology, and applicability to LANL. The EA process also provides NNSA with environmental information that can be used in developing mitigative actions, if necessary, to minimize or avoid adverse effects to the quality of the human environment and natural ecosystems should NNSA decide to proceed with implementing the construction and operation of a BSL-3 facility at LANL. Ultimately, the goal of NEPA and this EA is to aid NNSA officials in making decisions based on an understanding of environmental consequences and taking actions that protect, restore, and enhance the environment.

Book Predecisional Draft Environmental Assessment for Proposed Corrective Measures at Material Disposal Area H Within Technical Area 54 at Los Alamos National Laboratory  Los Alamos  New Mexico

Download or read book Predecisional Draft Environmental Assessment for Proposed Corrective Measures at Material Disposal Area H Within Technical Area 54 at Los Alamos National Laboratory Los Alamos New Mexico written by United States. National Nuclear Security Administration. Los Alamos Site Office and published by . This book was released on 2004 with total page 90 pages. Available in PDF, EPUB and Kindle. Book excerpt: