EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Environmental Assessment for the Implementation of the Wetland Mitigation Bank at the Savannah River Site

Download or read book Environmental Assessment for the Implementation of the Wetland Mitigation Bank at the Savannah River Site written by United States. Department of Energy. Savannah River Operations Office and published by . This book was released on 1999 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment and Finding of No Significant Impact

Download or read book Environmental Assessment and Finding of No Significant Impact written by and published by . This book was released on 1999 with total page 128 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1205) for the proposed implementation of a wetland mitigation bank program at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

Book Environmental Assessment for the A 01 Outfall Constructed Wetlands Project at the Savannah River Site

Download or read book Environmental Assessment for the A 01 Outfall Constructed Wetlands Project at the Savannah River Site written by and published by . This book was released on 1998 with total page 57 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021).

Book National Wetland Mitigation Banking Study

Download or read book National Wetland Mitigation Banking Study written by and published by . This book was released on 1994 with total page 152 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Final Report

Download or read book Final Report written by Kevin K. Moorhead and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Ecological Assessment of a Wetlands Mitigation Bank

Download or read book Ecological Assessment of a Wetlands Mitigation Bank written by Kevin K. Moorhead and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment for the Upgrade of the Site Road Infrastructure on the Savannah River Site

Download or read book Environmental Assessment for the Upgrade of the Site Road Infrastructure on the Savannah River Site written by United States. Department of Energy. Savannah River Operations Office and published by . This book was released on 1995 with total page 9 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Savannah River Site Environmental Implementation Plan  Volume 2  Protection Programs

Download or read book Savannah River Site Environmental Implementation Plan Volume 2 Protection Programs written by and published by . This book was released on 1989 with total page 470 pages. Available in PDF, EPUB and Kindle. Book excerpt: Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Book Conservation Covenants

    Book Details:
  • Author : Great Britain. Law Commission
  • Publisher : Stationery Office/Tso
  • Release : 2014
  • ISBN : 9780102988321
  • Pages : 246 pages

Download or read book Conservation Covenants written by Great Britain. Law Commission and published by Stationery Office/Tso. This book was released on 2014 with total page 246 pages. Available in PDF, EPUB and Kindle. Book excerpt: In this report, the Law Commission make recommendations for the introduction of a new statutory scheme of conservation covenants in England and Wales. The recommendations to introduce such a scheme would create a new legal tool, enabling landowners to protect land in order to conserve and restore our natural and built environment. Conservation covenants would allow landowners voluntarily to create binding obligations on their own land to meet a conservation objective, such as preserving woodland, cultivating a particular species of plant or protecting a habitat for an animal, or farming land in a certain way. The proposed statutory scheme would give individual landowners the opportunity, using private agreements, to contribute to conservation efforts being made across England and Wales. The scheme will create a versatile, simple and cost-effective legal tool capable of: unlocking currently missed conservation opportunities by overcoming the legal difficulties faced when creating binding obligations; facilitating better ways to deliver existing conservation objectives; and providing assurance of long-term conservation benefits. The report includes a draft Conservation Covenants Bill, which would introduce the conservation covenant scheme into the law of England and Wales.

Book Environmental Assessment for the Replacement Source of Steam for A Area at the Savannah River Site

Download or read book Environmental Assessment for the Replacement Source of Steam for A Area at the Savannah River Site written by United States. Department of Energy. Savannah River Operations Office and published by . This book was released on 2006 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment for the Domestic Water Supply Upgrades and Consolidation on the Savannah River Site

Download or read book Environmental Assessment for the Domestic Water Supply Upgrades and Consolidation on the Savannah River Site written by United States. Department of Energy. Savannah River Operations Office and published by . This book was released on 1994 with total page 18 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Assessment for the Natural Fluctuation of Water Level in Par Pond and Reduced Water Flow in Steel Creek Below L Lake at the Savannah River Site

Download or read book Environmental Assessment for the Natural Fluctuation of Water Level in Par Pond and Reduced Water Flow in Steel Creek Below L Lake at the Savannah River Site written by and published by . This book was released on 1995 with total page 38 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Savannah River Operations Office Strategic Plan directs Savannah River Site (SRS) to find ways to reduce operating costs, and to determine what site infrastructure must be maintained and what infrastructure is surplus. Because of the mission change, L-Lake, Par Pond, and the river water system are no longer needed to support current missions and therefore provide an opportunity for operating cost reduction. If SRS determines that L-Lake, Par Pond, and the river water system are no longer needed to support future missions and are considered surplus, appropriate NEPA documentation will be prepared. The purpose of the proposed action in this Environmental Assessment is to begin an examination of the need for the Site's river water system by (1) developing data needed to evaluate the potential environmental impacts of further reducing or eliminating the flow demands from the Site's river water system and; (2) evaluating the potential of reducing operating costs by allowing the water level in Par Pond to fluctuate naturally through reduced pumping. This action also includes reducing the current flow rates from L-Lake to Steel Creek to natural stream flows while maintaining full pool. The recently approved Par Pond CERCLA Interim Action Proposed Plan (IAPP) committed to evaluate in a NEPA document the environmental consequences of this proposed action. This document evaluated the remediation of human health and ecological risks associated with the three year drawdown of Par Pond. Should any of the parameters sampled in the reservoir and streams (e.g., water quality, biota, etc.) exceed established threshold levels during the implementation of the proposed action, water would again be pumped into the reservoir to minimize any impacts by bringing the water level back to an appropriate level about 58.2 m (195 ft).

Book Natural Resource Management Activities at the Savannah River Site  Environmental Assessment

Download or read book Natural Resource Management Activities at the Savannah River Site Environmental Assessment written by and published by . This book was released on 1993 with total page 153 pages. Available in PDF, EPUB and Kindle. Book excerpt: This environmental assessment (EA) reviews the environmental consequences of ongoing natural resource management activities on the Savannah River Site (SRS). Appendix A contains the Natural Resources Management Plant (NRMP). While several SRS organizations have primary responsibilities for different elements of the plan, the United States Department of Agriculture (USDA), Forest Service, Savannah River Forest Station (SRFS) is responsible for most elements. Of the river scenarios defined in 1985, the High-Intensity Management alternative established the upper bound of environmental consequences; it represents a more intense level of resource management than that being performed under current resource management activities. This alternative established compliance mechanisms for several natural resource-related requirements and maximum practical timber harvesting. Similarly, the Low-Intensity Management alternative established the lower bound of environmental consequences and represents a less intense level of resource management than that being performed under current resource management activities. This alternative also established compliance mechanisms, but defined a passively managed natural area. The Proposed Action of this EA describes the current level of multiple-natural resource management. This EA reviews the proposed action, and the high and low intensity alternative scenarios.

Book Ecological Assessment of a Wetlands Mitigation Bank

Download or read book Ecological Assessment of a Wetlands Mitigation Bank written by Kevin K. Moorhead and published by . This book was released on 2001 with total page 116 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Savannah River Site Environmental Implementation Plan

Download or read book Savannah River Site Environmental Implementation Plan written by and published by . This book was released on 1989 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.