EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Engineering Report  Initial Tank Retrieval Systems  Tank 241 SY 102 Waste Cooling Evaluation  Project W 211

Download or read book Engineering Report Initial Tank Retrieval Systems Tank 241 SY 102 Waste Cooling Evaluation Project W 211 written by and published by . This book was released on 1995 with total page 48 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides preliminary results of an evaluation of thermal effects for Tank 241-SY-102 from the planned operation of mixer pump retrieval system to be installed by Project W-211. The report evaluated four cases of mixer pump operation at varying tank waste levels. These are considered bounding cases for retrieval operations in Tank 241-SY-102. The results of the analyses indicate that planned mixer pump operation will result in slow, controlled, and easily observed increases in waste temperature without compromising the tank operating specification limits.

Book Project W 211  Initial Tank Retrieval Systems  Description of Operations for 241 AP 102 and 241 AP 104

Download or read book Project W 211 Initial Tank Retrieval Systems Description of Operations for 241 AP 102 and 241 AP 104 written by and published by . This book was released on 1999 with total page 97 pages. Available in PDF, EPUB and Kindle. Book excerpt: The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTS) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operations (DOO) defines the control philosophy for the waste retrieval system for tanks 241-AP-102 (AP-102) and 241-AP-104 (AP-104). This DOO will provide a basis for the detailed design of the Retrieval Control System (RCS) for AP-102 and AP-104 and establishes test criteria for the RCS. The test criteria will be used during qualification testing and acceptance testing to verify operability.

Book Project W 211 Initial Tank Retrieval Systems  ITRS  Description of Operations for 241 AZ 102

Download or read book Project W 211 Initial Tank Retrieval Systems ITRS Description of Operations for 241 AZ 102 written by and published by . This book was released on 2000 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTs) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operation (DOO) defines the control philosophy for the waste retrieval system for Tank 241-AZ-102 (AZ-102). This DOO provides a basis for the detailed design of the Project W-211 Retrieval Control System (RCS) for AZ-102 and also establishes test criteria for the RCS.

Book Title I Design Summary Report  Initial Tank Retrieval Systems  Project W 211

Download or read book Title I Design Summary Report Initial Tank Retrieval Systems Project W 211 written by and published by . This book was released on 1995 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Sur l Etendue du pays des Volces Ar  comiques

Download or read book Sur l Etendue du pays des Volces Ar comiques written by and published by . This book was released on 1875 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Functional Design Criteria  Project W 211  Initial Tank Retrieval Systems  Revision 1

Download or read book Functional Design Criteria Project W 211 Initial Tank Retrieval Systems Revision 1 written by and published by . This book was released on 1995 with total page 161 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides the technical baseline for retrieval of waste from ten double-shell tanks in the SY, AN, AP, AW, AY, and AZ tank farms. In order to retrieve waste from these tanks, systems are needed to mix the sludge with the supernate and pump the waste mixture from the tank. For 101-SY, the existing mitigation pump will be used to mix the waste and Project W-211 will provide for waste removal. The retrieval scope for the other nine tanks includes both the waste mixing and removal functions.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1995 with total page 816 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Tank SY 102 Waste Retrieval Assessment

Download or read book Tank SY 102 Waste Retrieval Assessment written by Yasuo Onishi and published by . This book was released on 1996 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 840 pages. Available in PDF, EPUB and Kindle. Book excerpt: Semiannual, with semiannual and annual indexes. References to all scientific and technical literature coming from DOE, its laboratories, energy centers, and contractors. Includes all works deriving from DOE, other related government-sponsored information, and foreign nonnuclear information. Arranged under 39 categories, e.g., Biomedical sciences, basic studies; Biomedical sciences, applied studies; Health and safety; and Fusion energy. Entry gives bibliographical information and abstract. Corporate, author, subject, report number indexes.

Book Tank 241 C 106 Sampling Data Requirements Developed Through the Data Quality Objectives  DQO  Process

Download or read book Tank 241 C 106 Sampling Data Requirements Developed Through the Data Quality Objectives DQO Process written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The rate of heat generation for tank 241-C-106 at the Hanford Site is estimated at more then 100,000 Btu/h. The heat is generated primarily from the radioactive decay of [sup 90]Sr waste that was inadvertently transferred into the tank in the late 1960s. If proper tank cooling is not maintained for this tank, heat-induced structural damage to the tank's concrete shell could result in the release of nuclear waste to the environment. Because of high-heat concerns in January 1991, tank 241-C-106 was designated as a Watch List tank and deemed as a Priority 1 safety issue. Waste Tank Safety Program (WTSP) is responsible for the resolution of this safety issue. Although forced cooling is effective for short term, the long-term resolution for tank cooling is waste retrieval. Single-shell Tank Retrieval Project (Retrieval) is responsible for the safe retrieval and transfer of radioactive waste from tank 241-C-106 to a selected double-shell tank. This data quality objective (DQO) study is an effort to determine engineering and design data needs for WTSP and assist Retrieval in designing contingency action retrieval systems. The 7-step DQO process is a tool developed by the Environmental Protection Agency with a goal of identifying needs and reducing costs. This report discusses the results of two DQO efforts for WTSP and Retrieval. The key data needs to support WTSP are thermal conductivity, permeability, and heat load profile. For the Retrieval support, there are nine and three data needs identified, respectively, for retrieval engineering system design and HVAC system design. The updated schedule to drill two core samples using rotary mode is set for March 1994. The analysis of the sample is expected to be completed by September 1994.

Book Project W 320 Tank 106 C Waste Retrieval Study Analysis Session Report

Download or read book Project W 320 Tank 106 C Waste Retrieval Study Analysis Session Report written by and published by . This book was released on 1998 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the Kaiser Engineers Hanford Company Project W-320 Tank 106-C Waste Retrieval Study Analysis Session Report readily retrievable. This facilitated session was requested by Westinghouse Hanford Company (WHC) to review the characterization data and select the best alternatives for a double-shell receiver tank and for a sluicing medium for Tank 106-C waste retrieval. The team was composed of WHC and Kaiser Engineers Hanford Company (KEH) personnel knowledgeable about tank farm operations, tank 106-C requirements, tank waste characterization and analysis, and chemical processing. This team was assembled to perform a structured decision analysis evaluation and recommend the best alternative-destination double-shell tank between tanks 101-AY and 102-AY, and the best alternative sluicing medium among dilute complexant (DC), dilute noncomplexant (DNC), and water. The session was facilitated by Richard Harrington and Steve Bork of KEH and was conducted at the Bookwalter Winery in Richland from 7:30 a.m. to 4:00 p.m. from July 27 through July 29, 1993. Attachment 1 (Scope Statement Sheet) identifies the team members, scope, objectives, and deliverables for the session.

Book Criticality Safety of Project W 151  241 AZ 101 Retrieval System Process Test

Download or read book Criticality Safety of Project W 151 241 AZ 101 Retrieval System Process Test written by and published by . This book was released on 1996 with total page 54 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Criticality Safety Evaluation Report (CSER) documents a review of the criticality safety implications of a process test to be performed in tank 241-AZ-101 (101-AZ). The process test will determine the effectiveness of the retrieval system for mobilization of solids and the practicality of the system for future use in the underground storage tanks at Hanford. The scope of the CSER extends only to the testing and operation of the mixer pumps and does not include the transfer of waste from the tank. Justification is provided that a nuclear criticality is extremely unlikely, if not impossible, in this tank.

Book

    Book Details:
  • Author :
  • Publisher :
  • Release : 1978
  • ISBN :
  • Pages : pages

Download or read book written by and published by . This book was released on 1978 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Engineering Study for ISSTRS Design Concept

Download or read book Engineering Study for ISSTRS Design Concept written by and published by . This book was released on 1997 with total page 403 pages. Available in PDF, EPUB and Kindle. Book excerpt: Los Alamos Technical Associates, Inc., is pleased to transmit the attached Conceptual Design Package for the Initial Single Shell Tank Retrieval System (ISSTRS), 90% Conceptual Design Review. The package includes the following: (1) ISSTRS Trade Studies: (a) Retrieval Facility Cooling Requirements; (b) Equipment Re-usability between Project W-320 and Tanks 241-C-103 and 241-C-1 05; (c) Sluice Line Options; and (d) Options for the Location of Tanks AX-103 and A-1 02 HVAC Equipment; (2) Drawings; (3) Risk Management Plan; (4) 0850 Interface Control Document; (5) Requirements Traceability Report; and (6) Project Design Specification.

Book INIS Atomindex

Download or read book INIS Atomindex written by and published by . This book was released on 1995 with total page 682 pages. Available in PDF, EPUB and Kindle. Book excerpt: