EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Draft Environmental Impact Statement for the Siting  Construction  and Operation of New Production Reactor Capacity  Sections 1 6

Download or read book Draft Environmental Impact Statement for the Siting Construction and Operation of New Production Reactor Capacity Sections 1 6 written by United States. Department of Energy. Office of New Production Reactors and published by . This book was released on 1991 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft Environmental Impact Statement for the Siting  Construction  and Operation of New Production Reactor Capacity  Sections 7 12  Appendices A C

Download or read book Draft Environmental Impact Statement for the Siting Construction and Operation of New Production Reactor Capacity Sections 7 12 Appendices A C written by United States. Department of Energy. Office of New Production Reactors and published by . This book was released on 1991 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft Environmental Impact Statement for the Siting  Construction  and Operation of New Production Reactor Capacity  Volume 1  Summary

Download or read book Draft Environmental Impact Statement for the Siting Construction and Operation of New Production Reactor Capacity Volume 1 Summary written by and published by . This book was released on 1991 with total page 45 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation's nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE's Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public.

Book Draft Environmental Impact Statement for the Siting  Construction  and Operation of New Production Reactor Capacity

Download or read book Draft Environmental Impact Statement for the Siting Construction and Operation of New Production Reactor Capacity written by United States. Dept. of Energy. Office of New Production Reactors and published by . This book was released on 1991 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft Environmental Impact Statement for the Siting  Construction  and Operation of New Production Reactor Capacity  Appendices D R

Download or read book Draft Environmental Impact Statement for the Siting Construction and Operation of New Production Reactor Capacity Appendices D R written by United States. Department of Energy. Office of New Production Reactors and published by . This book was released on 1991 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft Environmental Impact Statement for the Siting  Construction  and Operation of New Production Reactor Capacity  Volume 3  Sections 7 12  Appendices A C

Download or read book Draft Environmental Impact Statement for the Siting Construction and Operation of New Production Reactor Capacity Volume 3 Sections 7 12 Appendices A C written by and published by . This book was released on 1991 with total page 302 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation's nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE's Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains references; a list of preparers and recipients; acronyms, abbreviations, and units of measure; a glossary; an index and three appendices.

Book Draft Environmental Impact Statement for the Siting  Construction  and Operation of New Production Reactor Capacity  Volume 2  Sections 1 6

Download or read book Draft Environmental Impact Statement for the Siting Construction and Operation of New Production Reactor Capacity Volume 2 Sections 1 6 written by and published by . This book was released on 1991 with total page 656 pages. Available in PDF, EPUB and Kindle. Book excerpt: This (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains the analysis of programmatic alternatives, project alternatives, affected environment of alternative sites, environmental consequences, and environmental regulations and permit requirements.

Book Draft Environmental Impact Statement for the Siting  Construction  and Operation of New Production Reactor Capacity  Public Hearing Record

Download or read book Draft Environmental Impact Statement for the Siting Construction and Operation of New Production Reactor Capacity Public Hearing Record written by United States. Department of Energy and published by . This book was released on 1991 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 782 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Tritium Supply and Recycling Facilities Siting  Idaho National Engineering Laboratory  ID   Nevada Test Site  NV   Oak Ridge Reservatiom  TN   Pantex Plant  TX   Or Savannah River Site  SC

Download or read book Tritium Supply and Recycling Facilities Siting Idaho National Engineering Laboratory ID Nevada Test Site NV Oak Ridge Reservatiom TN Pantex Plant TX Or Savannah River Site SC written by and published by . This book was released on 1995 with total page 882 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Storage and Disposition of Weapons usable Fissile Materials

Download or read book Storage and Disposition of Weapons usable Fissile Materials written by and published by . This book was released on 1996 with total page 800 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1993 with total page 1094 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Safe Interim Storage of Hanford Tank Wastes  Hanford Site  Adams County  Richland County  Washington County  Benton County  and Franklin County

Download or read book Safe Interim Storage of Hanford Tank Wastes Hanford Site Adams County Richland County Washington County Benton County and Franklin County written by and published by . This book was released on 1995 with total page 536 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Drart Environmental Impact Statement Siting  Construction  and Operation of New Production Reactor Capacity  Volume 4  Appendices D R

Download or read book Drart Environmental Impact Statement Siting Construction and Operation of New Production Reactor Capacity Volume 4 Appendices D R written by and published by . This book was released on 1991 with total page 705 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation's nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE's Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.

Book Early Site Permit  ESP  at the Exelon ESP Site

Download or read book Early Site Permit ESP at the Exelon ESP Site written by and published by . This book was released on 2006 with total page 710 pages. Available in PDF, EPUB and Kindle. Book excerpt: