EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Energy Gateway South Transmission Project

Download or read book Energy Gateway South Transmission Project written by and published by . This book was released on 2014 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This Environmental Impact Statement has been prepared to analyze and disclose the impacts of granting a right-of-way across federal land to PacifiCorp (doing business as Rocky Mountain Power, the Applicant) for the purpose of constructing, operating, and maintaining the single-circuit, alternating current, 500-kilovolt transmission line and amending Bureau of Land Management and U.S. Forest Service land use plans to accommodate the proposed transmission line. The transmission line would begin near Medicine Bow, Carbon County, Wyoming, at the planned Aeolus Substation and would extend south and west to the Clover Substation (currently under construction) near Mona, Juab County, Utah, a distance between 400 and 500 miles, depending on the route selected.

Book Draft Environmental Impact Statement and Land use Plan Amendments for the Energy Gateway South Transmission Project

Download or read book Draft Environmental Impact Statement and Land use Plan Amendments for the Energy Gateway South Transmission Project written by United States. Bureau of Land Management and published by . This book was released on 2014 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Federal Register

Download or read book Federal Register written by and published by . This book was released on 2017 with total page 318 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Federal Register Index

Download or read book Federal Register Index written by and published by . This book was released on 2008 with total page 188 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft Environmental Impact Statement and Resource Management Plan Amendments for the SunZia Southwest Transmission Project

Download or read book Draft Environmental Impact Statement and Resource Management Plan Amendments for the SunZia Southwest Transmission Project written by United States. Bureau of Land Management and published by . This book was released on 2012 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This draft prepared by the New Mexico State Office of the Bureau of Land Management analyzes the consequences of granting a right-of-way to SunZia Transmission, LLC for locating two 500-kilovolt electric transmission lines from the proposed SunZia East Substation in Lincoln County N.M., to the Pinal Central Substation in Pinal County, Ariz.

Book Draft Plan Amendment   Draft Environmental Impact Statement  Environmental Impact Report for the Alta East Wind Project

Download or read book Draft Plan Amendment Draft Environmental Impact Statement Environmental Impact Report for the Alta East Wind Project written by and published by . This book was released on 2008 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: Granite Wind LLC, the Applicant, is proposing to develop an up to 84-megawatt wind energy plant and associated facilities on about 100 acres within a larger 2,756-acre area that includes 2,086 acres of public lands administered by the BLM Barstow Field Office and 670 acres of privately-owned land under the County of San Bernardino land-use jurisdiction. The site of the Proposed Action is located on unincorporated land in the Mojave Desert, approximately six miles east of the Town of Apple Valley and five miles northwest of the unincorporated community of Lucerne Valley, on the central ridge of the Granite Mountains. Also included in the proposal are a new access road to the project site, a new transmission line from the project site to an existing 220kV Southern California Edison (SCE) transmission line located in a utility corridor east of the site, and a new approximately 10-acre electrical substation (Jasper Substation) at the site of the SCE interconnection. In addition, the proposal includes an amendment to the CDCA Plan that would designate the proposed site as suitable for wind energy generation and allow for Siting of approximately 1 mile of the new 3.2-to 4.7-mile transmission line from the project site to be located outside of a utility corridor.

Book Designation of Energy Corridors on Federal Land in 11 Western States

Download or read book Designation of Energy Corridors on Federal Land in 11 Western States written by and published by . This book was released on 2008 with total page 692 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Southwest Intertie Project

Download or read book Southwest Intertie Project written by and published by . This book was released on 1993 with total page 224 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft Environmental Impact Statement for the Mona to Oquirrh Transmission Corridor Project and Draft Pony Express Resource Management Plan Amendment

Download or read book Draft Environmental Impact Statement for the Mona to Oquirrh Transmission Corridor Project and Draft Pony Express Resource Management Plan Amendment written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft Environmental Impact Statement  EIS  for the Proposed APS Sun Valley to Morgan 500 230kV Transmission Line Project and Draft Resource Management Plan Amendment  RMPA

Download or read book Draft Environmental Impact Statement EIS for the Proposed APS Sun Valley to Morgan 500 230kV Transmission Line Project and Draft Resource Management Plan Amendment RMPA written by United States. Bureau of Land Management and published by . This book was released on 2012 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: