EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Defense waste processing facility  Savannah River plant  Aiken  S C

Download or read book Defense waste processing facility Savannah River plant Aiken S C written by and published by . This book was released on 1981 with total page 600 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Defense Waste Processing Facility  Savannah River Plant  Aiken  S C

Download or read book Defense Waste Processing Facility Savannah River Plant Aiken S C written by United States. Department of Energy. Office of the Assistant Secretary for Defense Programs and published by . This book was released on 1981 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Savannah River Plant  Defense Waste Processing Facility

Download or read book Savannah River Plant Defense Waste Processing Facility written by and published by . This book was released on 1982 with total page 608 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft Environmental Impact Statement

    Book Details:
  • Author : United States. Department of Energy. Office of Nuclear Waste Management and Fuel Cycle Programs
  • Publisher :
  • Release : 1981
  • ISBN :
  • Pages : pages

Download or read book Draft Environmental Impact Statement written by United States. Department of Energy. Office of Nuclear Waste Management and Fuel Cycle Programs and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Design and Construction of the Defense Waste Processing Facility Project at the Savannah River Plant

Download or read book Design and Construction of the Defense Waste Processing Facility Project at the Savannah River Plant written by and published by . This book was released on 1986 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Du Pont Company is building for the Department of Energy a facility to vitrify high-level radioactive waste at the Savannah River Plant (SRP) near Aiken, South Carolina. The Defense Waste Processing Facility (DWPF) will solidify existing and future radioactive wastes by immobilizing the waste in Processing Facility (DWPF) will solidify existing and future radioactives wastes by immobilizing the waste in borosilicate glass contained in stainless steel canisters. The canisters will be sealed, decontaminated and stored, prior to emplacement in a federal repository. At the present time, engineering and design is 90% complete, construction is 25% complete, and radioactive processing in the $870 million facility is expected to begin by late 1989. This paper describes the SRP waste characteristics, the DWPF processing, building and equipment features, and construction progress of the facility.

Book Description of Defense Waste Processing Facility Reference Waste Form and Canister  Revision 1

Download or read book Description of Defense Waste Processing Facility Reference Waste Form and Canister Revision 1 written by and published by . This book was released on 1983 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Defense Waste Processing Facility (DWPF) will be located at the Savannah River Plant in Aiken, SC, and is scheduled for construction authorization during FY-1984. The reference waste form is borosilicate glass containing approx. 28 wt % sludge oxides, with the balance glass frit. Borosilicate glass was chosen because of its high resistance to leaching by water, its relatively high solubility for nuclides found in the sludge, and its reasonably low melting temperature. The glass frit contains about 58% SiO2 and 15% B2O3. Leachabilities of SRP waste glasses are expected to approach 10−8 g/m2-day based upon 1000-day tests using glasses containing SRP radioactive waste. Tests were performed under a wide variety of conditions simulating repository environments. The canister is filled with 3260 lb of glass which occupies about 85% of the free canister volume. The filled canister will generate approx. 470 watts when filled with oxides from 5-year-old sludge and 15-year-old supernate from the sludge and supernate processes. The radionuclide content of the canister is about 177,000 ci, with a radiation level of 5500 rem/h at canister surface contact. The reference canister is fabricated of standard 24-in.-OD, Schedule 20, 304L stainless steel pipe with a dished bottom, domed head, and a combined lifting and welding flange on the head neck. The overall canister length is 9 ft 10 in. with a 3/8-in. wall thickness. The 3-m canister length was selected to reduce equipment cell height in the DWPF to a practical size. The canister diameter was selected as an optimum size from glass quality considerations, a logical size for repository handling and to ensure that a filled canister with its double containment shipping cask could be accommodated on a legal-weight truck. The overall dimensions and weight appear to be compatible with preliminary assessments of repository requirements. 10 references.

Book Defense Waste Processing Facility Radioactive Operations    Part 2  Glass Making

Download or read book Defense Waste Processing Facility Radioactive Operations Part 2 Glass Making written by and published by . This book was released on 1996 with total page 12 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation's first and world's largest vitrification facility. Following a ten year construction period and nearly 3 year non-radioactive test program, the DWPF began radioactive operations in March, 1996. The results of the first 8 months of radioactive operations are presented. Topics include facility production from waste preparation batching to canister filling.

Book Savannah River Plant  Radioactive Waste Management

Download or read book Savannah River Plant Radioactive Waste Management written by and published by . This book was released on 1979 with total page 210 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Savannah River Site Waste Management

Download or read book Savannah River Site Waste Management written by and published by . This book was released on 1995 with total page 766 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book The Intensive Archeological Survey of a Potential Defense Waste Processing Facility Site  Savannah River Plant  Aiken and Barnwell Counties  South Carolina

Download or read book The Intensive Archeological Survey of a Potential Defense Waste Processing Facility Site Savannah River Plant Aiken and Barnwell Counties South Carolina written by Richard D. Brooks and published by . This book was released on 1979 with total page 30 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Alternatives for Long term Management of Defense High level Radioactive Waste

Download or read book Alternatives for Long term Management of Defense High level Radioactive Waste written by United States. Energy Research and Development Administration and published by . This book was released on 1977 with total page 344 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Savannah River Plant  Defense Waste Processing Facility

Download or read book Savannah River Plant Defense Waste Processing Facility written by and published by . This book was released on 1982 with total page 498 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Socioeconomic Assessment of Defense Waste Processing Facility Impacts in the Savannah River Plant Region

Download or read book Socioeconomic Assessment of Defense Waste Processing Facility Impacts in the Savannah River Plant Region written by Elizabeth Peelle and published by . This book was released on 1981 with total page 135 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Description of DWPF Reference Waste Form and Canister

Download or read book Description of DWPF Reference Waste Form and Canister written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document describes the reference waste form and canister for the Defense Waste Processing Facility (DWPF). The facility is planned for location at the Savannah River Plant in Aiken, SC, and is scheduled for construction authorization during FY-1983. The reference canister is fabricated of 24-in.-OD 304L stainless steel pipe with a dished bottom, domed head, and lifting and welding flanges on the head neck. The overall canister length is 9 ft 10 in., with a wall thickness of 3/8-in. (schedule 20 pipe). The canister length was selected to reduce equipment cell height in the DWPF to a practical size. The canister diameter was selected to ensure that a filled canister with its shipping cask could be accommodated on a legal-weight truck. The overall dimensions and weight appear to be generally compatible with preliminary assessments of repository requirements. The reference waste form is borosilicate glass containing approximately 28 wt % sludge oxides with the balance glass frit. Borosilicate glass was chosen because of its high resistance to leaching by water, its relatively high solubility for nuclides found in the sludge, and its reasonably low melting temperature. The glass frit contains approximately 58% SiO2 and 15% B2O3. This composition results in a low average leachability in the waste form of approximately 5 x 10−9 g/cm2-day based on 137Cs over 365 days in 25°C water. The canister is filled with 3260 lb of glass which occupies about 85% of the free canister volume. The filled canister will generate approximately 425 watts when filled with oxides from 5-year-old sludge and 15-year-old supernate from the Stage 1 and Stage 2 processes. The radionuclide content of the canister is about 150,000 curies, with a radiation level of 2 x 104 rem/hour at 1 cm.