EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Lifelines

    Book Details:
  • Author : Stephane Hallegatte
  • Publisher : World Bank Publications
  • Release : 2019-07-16
  • ISBN : 1464814317
  • Pages : 316 pages

Download or read book Lifelines written by Stephane Hallegatte and published by World Bank Publications. This book was released on 2019-07-16 with total page 316 pages. Available in PDF, EPUB and Kindle. Book excerpt: Infrastructure—electricity, telecommunications, roads, water, and sanitation—are central to people’s lives. Without it, they cannot make a living, stay healthy, and maintain a good quality of life. Access to basic infrastructure is also a key driver of economic development. This report lays out a framework for understanding infrastructure resilience - the ability of infrastructure systems to function and meet users’ needs during and after a natural hazard. It focuses on four infrastructure systems that are essential to economic activity and people’s well-being: power systems, including the generation, transmission, and distribution of electricity; water and sanitation—especially water utilities; transport systems—multiple modes such as road, rail, waterway, and airports, and multiple scales, including urban transit and rural access; and telecommunications, including telephone and Internet connections.

Book Global Trends 2040

    Book Details:
  • Author : National Intelligence Council
  • Publisher : Cosimo Reports
  • Release : 2021-03
  • ISBN : 9781646794973
  • Pages : 158 pages

Download or read book Global Trends 2040 written by National Intelligence Council and published by Cosimo Reports. This book was released on 2021-03 with total page 158 pages. Available in PDF, EPUB and Kindle. Book excerpt: "The ongoing COVID-19 pandemic marks the most significant, singular global disruption since World War II, with health, economic, political, and security implications that will ripple for years to come." -Global Trends 2040 (2021) Global Trends 2040-A More Contested World (2021), released by the US National Intelligence Council, is the latest report in its series of reports starting in 1997 about megatrends and the world's future. This report, strongly influenced by the COVID-19 pandemic, paints a bleak picture of the future and describes a contested, fragmented and turbulent world. It specifically discusses the four main trends that will shape tomorrow's world: - Demographics-by 2040, 1.4 billion people will be added mostly in Africa and South Asia. - Economics-increased government debt and concentrated economic power will escalate problems for the poor and middleclass. - Climate-a hotter world will increase water, food, and health insecurity. - Technology-the emergence of new technologies could both solve and cause problems for human life. Students of trends, policymakers, entrepreneurs, academics, journalists and anyone eager for a glimpse into the next decades, will find this report, with colored graphs, essential reading.

Book Building Urban Resilience

Download or read book Building Urban Resilience written by Abhas K. Jha and published by World Bank Publications. This book was released on 2013-03-01 with total page 209 pages. Available in PDF, EPUB and Kindle. Book excerpt: This handbook is a resource for enhancing disaster resilience in urban areas. It summarizes the guiding principles, tools, and practices in key economic sectors that can facilitate incorporation of resilience concepts into decisions about infrastructure investments and urban management that are integral to reducing disaster and climate risks.

Book Natural Disasters

    Book Details:
  • Author : Pan American Health Organization
  • Publisher : Pan American Health Org
  • Release : 2000
  • ISBN : 9275115753
  • Pages : 130 pages

Download or read book Natural Disasters written by Pan American Health Organization and published by Pan American Health Org. This book was released on 2000 with total page 130 pages. Available in PDF, EPUB and Kindle. Book excerpt: Includes statistics.

Book Project Management in Nuclear Power Plant Construction

Download or read book Project Management in Nuclear Power Plant Construction written by International Atomic Energy Agency and published by . This book was released on 2012 with total page 124 pages. Available in PDF, EPUB and Kindle. Book excerpt: This publication provides guidance on project management from the preparatory phase to plant turnover to commissioning of nuclear power plants. The guidelines and experiences described will enable project managers to obtain better performance in nuclear power plant construction.

Book Guide to Sanitation in Natural Disasters

Download or read book Guide to Sanitation in Natural Disasters written by M. Assar and published by . This book was released on 1971 with total page 144 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book The impact of disasters and crises on agriculture and food security  2021

Download or read book The impact of disasters and crises on agriculture and food security 2021 written by Food and Agriculture Organization of the United Nations and published by Food & Agriculture Org.. This book was released on 2021-03-17 with total page 245 pages. Available in PDF, EPUB and Kindle. Book excerpt: On top of a decade of exacerbated disaster loss, exceptional global heat, retreating ice and rising sea levels, humanity and our food security face a range of new and unprecedented hazards, such as megafires, extreme weather events, desert locust swarms of magnitudes previously unseen, and the COVID-19 pandemic. Agriculture underpins the livelihoods of over 2.5 billion people – most of them in low-income developing countries – and remains a key driver of development. At no other point in history has agriculture been faced with such an array of familiar and unfamiliar risks, interacting in a hyperconnected world and a precipitously changing landscape. And agriculture continues to absorb a disproportionate share of the damage and loss wrought by disasters. Their growing frequency and intensity, along with the systemic nature of risk, are upending people’s lives, devastating livelihoods, and jeopardizing our entire food system. This report makes a powerful case for investing in resilience and disaster risk reduction – especially data gathering and analysis for evidence informed action – to ensure agriculture’s crucial role in achieving the future we want.

Book Shelter Projects  2008

Download or read book Shelter Projects 2008 written by Joseph Ashmore and published by UN-HABITAT. This book was released on 2008 with total page 119 pages. Available in PDF, EPUB and Kindle. Book excerpt: In recent years, the humanitarian community has looked inward, learning from their past experiences in providing emergency shelter for the ever-increasing number of populations suffering from crises worldwide. The humanitarian reform process has helped widen the community of practitioners, reinforced global and country-based coordination systems, and required the agencies concerned to seek new and better means of ensuring integrated and robust humanitarian programming. This publication is an example of a series of learning tools being produced to support improved response to crises. It has been developed by the Emergency Shelter Cluster through a group of agencies within the cluster led by UN-HABITAT. It contains summaries of a range of experiences applied in crisis situations, and an honest appraisal of their successes and failures.

Book Emergency Sanitation

Download or read book Emergency Sanitation written by Peter Harvey and published by WEDC, Loughborough University. This book was released on 2002 with total page 25 pages. Available in PDF, EPUB and Kindle. Book excerpt: Includes statistics.

Book Our Common Future

Download or read book Our Common Future written by and published by . This book was released on 1990 with total page 400 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book The State of Food Security and Nutrition in the World 2018

Download or read book The State of Food Security and Nutrition in the World 2018 written by Food and Agriculture Organization of the United Nations and published by Food & Agriculture Org.. This book was released on 2018-09-14 with total page 278 pages. Available in PDF, EPUB and Kindle. Book excerpt: New evidence this year corroborates the rise in world hunger observed in this report last year, sending a warning that more action is needed if we aspire to end world hunger and malnutrition in all its forms by 2030. Updated estimates show the number of people who suffer from hunger has been growing over the past three years, returning to prevailing levels from almost a decade ago. Although progress continues to be made in reducing child stunting, over 22 percent of children under five years of age are still affected. Other forms of malnutrition are also growing: adult obesity continues to increase in countries irrespective of their income levels, and many countries are coping with multiple forms of malnutrition at the same time – overweight and obesity, as well as anaemia in women, and child stunting and wasting.

Book Shock Waves

    Book Details:
  • Author : Stephane Hallegatte
  • Publisher : World Bank Publications
  • Release : 2015-11-23
  • ISBN : 1464806748
  • Pages : 227 pages

Download or read book Shock Waves written by Stephane Hallegatte and published by World Bank Publications. This book was released on 2015-11-23 with total page 227 pages. Available in PDF, EPUB and Kindle. Book excerpt: Ending poverty and stabilizing climate change will be two unprecedented global achievements and two major steps toward sustainable development. But the two objectives cannot be considered in isolation: they need to be jointly tackled through an integrated strategy. This report brings together those two objectives and explores how they can more easily be achieved if considered together. It examines the potential impact of climate change and climate policies on poverty reduction. It also provides guidance on how to create a “win-win†? situation so that climate change policies contribute to poverty reduction and poverty-reduction policies contribute to climate change mitigation and resilience building. The key finding of the report is that climate change represents a significant obstacle to the sustained eradication of poverty, but future impacts on poverty are determined by policy choices: rapid, inclusive, and climate-informed development can prevent most short-term impacts whereas immediate pro-poor, emissions-reduction policies can drastically limit long-term ones.

Book Guidelines for Drinking water Quality

Download or read book Guidelines for Drinking water Quality written by World Health Organization and published by World Health Organization. This book was released on 1993 with total page 260 pages. Available in PDF, EPUB and Kindle. Book excerpt: This volume describes the methods used in the surveillance of drinking water quality in the light of the special problems of small-community supplies, particularly in developing countries, and outlines the strategies necessary to ensure that surveillance is effective.

Book Holistic Disaster Recovery

Download or read book Holistic Disaster Recovery written by and published by DIANE Publishing. This book was released on 2001-09 with total page 250 pages. Available in PDF, EPUB and Kindle. Book excerpt: This is an all-purpose handbook on how to build sustainability into a community during the recovery period after a disaster. It has background information, practical descriptions, and ideas about what sustainability is, why it is a good for a community, and how it can be applied during disaster recovery to help create a better community. The book is intended to be used by local officials, staff, activists, and the disaster recovery experts who help the community during disaster recovery -- including state planners, emergency management professionals, mitigation specialists, and others. It is geared mainly toward small to medium-sized communities.

Book Basic Safety Principles for Nuclear Power Plants

Download or read book Basic Safety Principles for Nuclear Power Plants written by International Nuclear Safety Advisory Group and published by . This book was released on 1999 with total page 118 pages. Available in PDF, EPUB and Kindle. Book excerpt: The present report is a revision of Safety Series No. 75-INSAG-3 (1988), updating the statements made on the objectives and principles of safe design and operation for electricity generating nuclear power plants. It includes the improvements made in the safety of operating nuclear power plants and identifies the principles underlying the best current safety policies to be applied in future plants. It presents INSAG's understanding of the principles underlying the best current safety policies and practices of the nuclear power industry.

Book Human resources for medical devices   the role of biomedical engineers

Download or read book Human resources for medical devices the role of biomedical engineers written by World Health Organization and published by World Health Organization. This book was released on 2017-05-09 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: This publication addresses the role of the biomedical engineer in the development, regulation, management, training, and use of medical devices. The first part of the book looks at the biomedical engineering profession globally as part of the health workforce: global numbers and statistics, professional classification, general education and training, professional associations, and the certification process. The second part addresses all of the different roles that the biomedical engineer can have in the life cycle of the technology, from research and development, and innovation, mainly undertaken in academia; the regulation of devices entering the market; and the assessment or evaluation in selecting and prioritizing medical devices (usually at national level); to the role they play in the management of devices from selection and procurement to safe use in healthcare facilities. The annexes present comprehensive information on academic programs, professional societies, and relevant WHO and UN documents related to human resources for health as well as the reclassification proposal for ILO. This publication can be used to encourage the availability, recognition, and increased participation of biomedical engineers as part of the health workforce, particularly following the recent adoption of the recommendations of the UN High-Level Commission on Health Employment and Economic Growth, the WHO Global Strategy on Human Resources for Health, and the establishment of national health workforce accounts. The document also supports the aim of reclassification of the role of the biomedical engineer as a specific engineer that supports the development, access, and use of medical devices within the national, regional, and global occupation classification system.

Book Environmental Consequences of the Chernobyl Accident and Their Remediation

Download or read book Environmental Consequences of the Chernobyl Accident and Their Remediation written by International Atomic Energy Agency and published by IAEA. This book was released on 2006 with total page 166 pages. Available in PDF, EPUB and Kindle. Book excerpt: The explosion on 26 April 1986 at the Chernobyl nuclear power plant and the consequent reactor fire resulted in an unprecedented release of radioactive material from a nuclear reactor and adverse consequences for the public and the environment. Although the accident occurred nearly two decades ago, controversy still surrounds the real impact of the disaster. Therefore the IAEA, in cooperation with other UN bodies, the World Bank, as well as the competent authorities of Belarus, the Russian Federation and Ukraine, established the Chernobyl Forum in 2003. The mission of the Forum was to generate 'authoritative consensual statements' on the environmental consequences and health effects attributable to radiation exposure arising from the accident as well as to provide advice on environmental remediation and special health care programmes, and to suggest areas in which further research is required. This report presents the findings and recommendations of the Chernobyl Forum concerning the environmental effects of the Chernobyl accident.