EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book An Exact Bidirectional Approach to the Resource Constrained Project Scheduling Problem

Download or read book An Exact Bidirectional Approach to the Resource Constrained Project Scheduling Problem written by Razek E. Karnoub and published by . This book was released on 2001 with total page 245 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book An Exact Bidirectional Approach to the Resource Constrained Project Scheduling Problem

Download or read book An Exact Bidirectional Approach to the Resource Constrained Project Scheduling Problem written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The aim of this research is to develop a new approach to the Resource Constrained Project Scheduling Problem. Traditionally, most exact approaches to solve the problem have been either Integer Programming approaches or Branch and Bound (BaB) ones. Of the two, BaB procedures have proven to be the more successful computationally. But, while it is quite intuitive to conceive that the root node of a BaB search tree should be the start activity, it is no less conceivable that it be the terminal activity. Indeed, it is conceivable that the search starts from both ends and concludes somewhere in the middle of the ensuing trees. Unfortunately, BaB as a methodology is not amenable to deriving a termination criterion for such a procedure which guarantees optimality. To a large extent, this research can be seen as an attempt at accomplishing just that. We start with a comprehensive review of the literature related to the problem. We present a new Integer Programming model to describe it together with a 'look-ahead' heuristic procedure which may be used along with it. The main advantage of this procedure is its ability to reflect planning over the short horizon in anticipation of changes to the project in the more future. Our chief contribution is in the third part of this study which sets up the problem as a Shortest Path Problem in two `state networks', forward and reverse, where the nodes reflect the precedence feasibility or partial completion of the activities of the project. We develop the conceptual tools to construct the networks and to properly detect a `path' between their sources from which a makespan optimal schedule could be derived. The theoretical constructs ultimately result in algorithms that solve the problem proceeding forward, in reverse, or bidirectionally. These algorithms have been tested on the J30 benchmark data set of Kolisch, Sprecher and Drexl (1995). Computational results show important advantages of the bidirectional approach but also point out sig.

Book Resource Constrained Project Scheduling

Download or read book Resource Constrained Project Scheduling written by Christian Artigues and published by John Wiley & Sons. This book was released on 2013-03-01 with total page 235 pages. Available in PDF, EPUB and Kindle. Book excerpt: This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

Book Resource Constrained Project Scheduling

Download or read book Resource Constrained Project Scheduling written by Arno Sprecher and published by Springer Science & Business Media. This book was released on 2012-12-06 with total page 157 pages. Available in PDF, EPUB and Kindle. Book excerpt: Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).

Book Scheduling of Resource Constrained Projects

Download or read book Scheduling of Resource Constrained Projects written by Robert Klein and published by Springer Science & Business Media. This book was released on 2012-12-06 with total page 379 pages. Available in PDF, EPUB and Kindle. Book excerpt: Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practitioners as well as scientists working in the field of project management. The book is divided into two parts. In Part I, the project management process is described and the management tasks to be accomplished during project planning and control are discussed. This allows for identifying the major scheduling problems arising in the planning process, among which the resource-constrained project scheduling problem is the most important. Part II deals with efficient computer-based procedures for the resource-constrained project scheduling problem and its generalized version. Since both problems are NP-hard, the development of such procedures which yield satisfactory solutions in a reasonable amount of computation time is very challenging, and a number of new and very promising approaches are introduced. This includes heuristic procedures based on priority rules and tabu search as well as lower bound methods and branch and bound procedures which can be applied for computing optimal solutions.

Book Exact solution methods of project scheduling problems

Download or read book Exact solution methods of project scheduling problems written by Carsten Heuring and published by GRIN Verlag. This book was released on 2006-08-27 with total page 31 pages. Available in PDF, EPUB and Kindle. Book excerpt: Seminar paper from the year 2002 in the subject Business economics - Operations Research, grade: 1,9, http://www.uni-jena.de/ (Lehrstuhl für ABWL, insb. Betriebswirtschaftliche Entscheidungsanalyse), course: Quantitative Methoden der Projektplanung, language: English, abstract: The use of project management is continuously growing in industrial and public organizations providing an efficient instrument for mastering the challenges caused by steadily shortening product life cycles, decreasing profit margins, and global markets. One of the main tasks in project management is the scheduling of the project, that is, the temporal arrangement of activities. Resources are required to perform activities and are available with limited capacities. Therefore, within the project management the activities are to be scheduled subject to precendence and resource constraints. In practice, different types of resources may occur. Renewable resources (e.g. machines) are available at each point in time. Nonrenewable resources (e.g. money) are depleted by use. These resources only affect the scheduling of activities if activities can be carried out in alternative modes which differ, for example, in duration and amount of resources needed. To describe these scheduling problems we use mathematical models. The techniques to solve resource constrained project scheduling problems are descriebed with branch and bound methods.

Book Project Scheduling under Limited Resources

Download or read book Project Scheduling under Limited Resources written by Sönke Hartmann and published by Springer Science & Business Media. This book was released on 2012-12-06 with total page 223 pages. Available in PDF, EPUB and Kindle. Book excerpt: Approaches to project scheduling under resource constraints are discussed in this book. After an overview of different models, it deals with exact and heuristic scheduling algorithms. The focus is on the development of new algorithms. Computational experiments demonstrate the efficiency of the new heuristics. Finally, it is shown how the models and methods discussed here can be applied to projects in research and development as well as market research.

Book Project Scheduling

Download or read book Project Scheduling written by Jan Weglarz and published by Springer Science & Business Media. This book was released on 2012-12-06 with total page 534 pages. Available in PDF, EPUB and Kindle. Book excerpt: Project scheduling problems are, generally speaking, the problems of allocating scarce resources over time to perform a given set of activities. The resources are nothing other than the arbitrary means which activities complete for. Also the activities can have a variety of interpretations. Thus, project scheduling problems appear in a large spectrum of real-world situations, and, in consequence, they have been intensively studied for almost fourty years. Almost a decade has passed since the multi-author monograph: R. Slowinski, 1. W~glarz (eds. ), Advances in Project Scheduling, Elsevier, 1989, summarizing the state-of-the-art across project scheduling problems, was published. Since then, considerable progress has been made in all directions of modelling and finding solutions to these problems. Thus, the proposal by Professor Frederick S. Hillier to edit a handbook which reports on the recent advances in the field came at an exceptionally good time and motivated me to accept the challenge. Fortunately, almost all leading experts in the field have accepted my invitation and presented their completely new advances often combined with expository surveys. Thanks to them, the handbook stands a good chance of becoming a key reference point on the current state-of-the-art in project scheduling, as well as on new directions in the area. The contents are divided into four parts. The first one, dealing with classical models -exact algorithms, is preceded by a proposition of the classification scheme for scheduling problems.

Book A Parallel Exact Solution Procedure for the Resource constrained Project Scheduling Problem

Download or read book A Parallel Exact Solution Procedure for the Resource constrained Project Scheduling Problem written by Wendell Phillips Simpson and published by . This book was released on 1991 with total page 562 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Project Scheduling under Resource Constraints

Download or read book Project Scheduling under Resource Constraints written by Rainer Kolisch and published by Springer Science & Business Media. This book was released on 2013-03-09 with total page 221 pages. Available in PDF, EPUB and Kindle. Book excerpt: This book introduces the field of resource-constrained project scheduling. State-of-the-art reviews of optimal and heuristic procedures are provided for classical project scheduling models. Furthermore, new models which are relevant for practical problem settings, are introduced. The main emphasis is on newly developed competitive heuristic methods. Contents: Introduction. - Description of the Problems.- Classification of Schedules.- Characterisation and Generation of Instances.- The Single-Mode Project Scheduling Problem.- The Multi-Mode Project Scheduling Problem.- Project Scheduling with Given Deadline.- Project Scheduling with Setup Times.- Applications to Production Management.- Concluding Remarks.- List of Notations.- List of Abbreviations.

Book Resources Constrained Project Scheduling

Download or read book Resources Constrained Project Scheduling written by Christian Artigues and published by Iste Publishing Company. This book was released on 2007-06 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

Book Advances in Project Scheduling

Download or read book Advances in Project Scheduling written by R. Slowinski and published by Elsevier. This book was released on 2013-10-22 with total page 540 pages. Available in PDF, EPUB and Kindle. Book excerpt: This multi-author volume, containing contributions from international experts in the field, presents recent developments in project scheduling for both theory and practice. It is organized in three parts: I. Basic deterministic models; II. Special deterministic models; III. Stochastic models. A variety of approaches is presented dealing with multiple-category resource constraints, different mathematical models of activities, and various project performance measures in single and multiobjective formulation. Exact and heuristic algorithms are presented for both deterministic and stochastic project description.The volume will be of special interest to scientists, students, decision makers, executive managers, consultants and practitioners involved in systems management or operations research, in particular in business, engineering, and finance, but also in other areas of pure and applied sciences.

Book Handbook on Project Management and Scheduling Vol  2

Download or read book Handbook on Project Management and Scheduling Vol 2 written by Christoph Schwindt and published by Springer. This book was released on 2015-01-13 with total page 768 pages. Available in PDF, EPUB and Kindle. Book excerpt: Due to the increasing importance of product differentiation and collapsing product life cycles, a growing number of value-adding activities in the industry and service sector are organized in projects. Projects come in many forms, often taking considerable time and consuming a large amount of resources. The management and scheduling of projects represents a challenging task and project performance may have a considerable impact on an organization's competitiveness. This handbook presents state-of-the-art approaches to project management and scheduling. More than sixty contributions written by leading experts in the field provide an authoritative survey of recent developments. The book serves as a comprehensive reference, both, for researchers and project management professionals. The handbook consists of two volumes. Volume 1 is devoted to single-modal and multi-modal project scheduling. Volume 2 presents multi-project problems, project scheduling under uncertainty and vagueness, managerial approaches and a separate part on applications, case studies and information systems.

Book Essays in Production  Project Planning and Scheduling

Download or read book Essays in Production Project Planning and Scheduling written by P. Simin Pulat and published by Springer Science & Business Media. This book was released on 2013-12-02 with total page 419 pages. Available in PDF, EPUB and Kindle. Book excerpt: From the Preface: This festschrift is devoted to recognize the career of a man who not only witnessed the growth of operations research from its inception, but also contributed significantly to this growth. Dr. Salah E. Elmaghraby received his doctorate degree from Cornell University in 1958, and since then, his scholarly contributions have enriched the fields of production planning and scheduling and project scheduling. This collection of papers is contributed in his honor by his students, colleagues, and acquaintances. It offers a tribute to the inspiration received from his work, and from his guidance and advice over the years, and recognizes the legacy of his many contributions. Dr. Elmaghraby is a pioneer in the area of project scheduling (in particular, project planning and control through network models, for which he coined the term ‘activity networks’.) In his initial work in this area, he developed an algebra based on signal flow graphs and semi-Markov processes for analyzing generalized activity networks involving activities with probabilistic durations. This work led to the development of what was later known as the Graphical Evaluation and Review Technique (GERT), and GERT simulation models. He has made fundamental contributions in determining criticality indices for activities, in developing methodologies for project compression and time/cost analysis, and in the use of stochastic and chance-constrained programming and Petri Nets for the analysis of activity networks. This volume brings together fourteen contributions, which can be viewed under the following three main themes: operations research and its application in production planning; project scheduling, and production scheduling, inspired by, and in many cases based on, Dr. Elmaghraby’s work in these areas. The first five chapters are devoted to the first theme, followed by four chapters each devoted to the other two, respectively. An additional chapter is devoted to the vulnerability of multimodal freight systems.

Book Exact and Heuristic Methods for Resource Constrained Project Scheduling Problem

Download or read book Exact and Heuristic Methods for Resource Constrained Project Scheduling Problem written by Anis Kooli and published by . This book was released on 2012 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: Resource Constrained Project Scheduling Problem is one of the most studied schedulingproblems in the literature. It consists in scheduling activities, submitted to precedencerelationship, and requiring renewable resources to be processed. The objective isto minimize the project duration, i.e., the makespan. We study the Resource ConstrainedProject Scheduling Problem. We are interested on the exact resolution of the problem.In the first part of the thesis, we develop a series of lower bounds based on energeticreasoning and mathematical formulations. The computational results show that theproposed lower bounds outperform the ones of the literature. In the second part, wepropose Branch-and-Bound procedures using the lower bounds developed on the firstpart.

Book Exact and Suboptimal Reactive Strategies for Resource Constrained Project Scheduling with Uncertain Resource Availabilities

Download or read book Exact and Suboptimal Reactive Strategies for Resource Constrained Project Scheduling with Uncertain Resource Availabilities written by Olivier Lambrechts and published by . This book was released on 2008 with total page 37 pages. Available in PDF, EPUB and Kindle. Book excerpt: In order to cope with the uncertainty inherent in practical project management, proactive and/or reactive strategies can be used. Proactive strategies try to anticipate future disruptions by incorporating slack time or excess resource availability into the schedule, whereas reactive strategies react after a disruption happened and try to revert to a feasible schedule. Traditionally, reactive approaches have focused on obtaining a good schedule with respect to the original objective function or a schedule that deviates as little as possible from the baseline schedule. In this paper, we present various approaches, exact as well as heuristic, for optimizing the latter objective and thus encouraging schedule stability. Furthermore, in contrast to traditional rescheduling algorithms, we present a new heuristic that also takes future uncertainty into account when repairing the schedule. We consider a variant of the resource-constrained project scheduling problem in which the uncertainty is modeled by means of unexpected resource breakdowns. The results of an extensive computational experiment are given to compare the performance of the proposed strategies.