EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Acquisition Oversight of the U S  Navy s Littoral Combat System

Download or read book Acquisition Oversight of the U S Navy s Littoral Combat System written by United States. Congress. House. Committee on Armed Services. Seapower and Expeditionary Forces Subcommittee and published by . This book was released on 2008 with total page 116 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Navy Littoral Combat Ship  LCS  Program

Download or read book Navy Littoral Combat Ship LCS Program written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2011-05 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: The LCS is a relatively inexpensive Navy surface combatant equipped with modular ¿plug-and-fight¿ mission packages. The basic version of the LCS, without any mission packages, is referred to as the LCS sea frame. The Navy wants to field a force of 55 LCSs. Contents of this report: (1) Intro.; (2) Background: The LCS in General; Two Industry Teams, Each with Its Own Design; Planned Procurement Quantities; (3) Issues for Congress: New Acquisition Strategy Announced in 9/09; Unit Procurement Cost Cap; Total Program Acquisition Cost; (4) Legislative Activity for FY 2011. Appendices: Cost Growth on LCS Sea Frames; LCS Acquisition Strategy Announced in 9/09. Charts and tables. This is a print on demand publication.

Book Navy Littoral Combat Ship  LCS  Program  Background  Oversight Issues  and Options for Congress

Download or read book Navy Littoral Combat Ship LCS Program Background Oversight Issues and Options for Congress written by and published by . This book was released on 2007 with total page 42 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Littoral Combat Ship (LCS) is a small, fast ship that uses modular plug-and-fight mission packages, including unmanned vehicles (UVs). The basic version of the LCS, without any mission packages, is referred to as the LCS sea frame. The first LCS was procured in FY2005, another three were procured in FY2006, and two more were procured in FY2007. The Navy's proposed FY2008 budget, submitted to Congress in February 2007, requested $910.5 million in procurement funding for three more LCSs. Navy plans call for procuring a total of 55 LCSs. In response to significant cost growth in the building of the first LCSs, the Navy in March 2007 announced a proposed plan for restructuring the LCS program. On April 12, 2007, the Navy announced that the Navy and Lockheed could not reach an agreement on a restructured contract for LCS-1 and LCS-3 and that the Navy consequently was terminating construction of LCS-3. On May 10, 2007, it was reported that the Navy would ask Congress to increase the procurement cost cap for the fifth and sixth LCSs to $460 million each in FY2008 dollars. A primary issue for Congress at this point is whether to approve, reject, or modify the Navy's proposed restructuring plan, and what additional actions, if any, should be taken in response to the Navy's decision to terminate construction of LCS-3. Congress has several potential options regarding the LCS program. This report will be updated as events warrant.

Book Defense Acquisitions

    Book Details:
  • Author : Belva Martin
  • Publisher : DIANE Publishing
  • Release : 2011-05
  • ISBN : 1437938825
  • Pages : 55 pages

Download or read book Defense Acquisitions written by Belva Martin and published by DIANE Publishing. This book was released on 2011-05 with total page 55 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy's Littoral Combat Ship (LCS) is envisioned as a reconfigurable vessel able to meet three missions: surface warfare, mine countermeasures, and anti-submarine warfare. It consists of the ship (seaframe) and the mission package it carries and deploys. The Navy plans to invest over $25 billion through FY 2035 to acquire LCS. This report: (1) identified technical, design, and construction challenges to completing the first four ships within current cost and schedule estimates; (2) assessed the Navy's progress developing and fielding mission packages; and (3) evaluated the quality of recent Navy cost analyses for seaframes and their effect on program progress. Charts and tables. This is a print on demand publication.

Book Defense Acquisitions

    Book Details:
  • Author : U.s. Government Accountability Office
  • Publisher : Createspace Independent Publishing Platform
  • Release : 2017-08-10
  • ISBN : 9781974438235
  • Pages : 56 pages

Download or read book Defense Acquisitions written by U.s. Government Accountability Office and published by Createspace Independent Publishing Platform. This book was released on 2017-08-10 with total page 56 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navys Littoral Combat Ship (LCS) is envisioned as a reconfigurable vessel able to meet three missions: surface warfare, mine countermeasures, and anti-submarine warfare. It consists of the ship (seaframe) and the mission package it carries and deploys. The Navy plans to invest over $25 billion through fiscal year 2035 to acquire LCS. However, recurring cost growth and schedule delays have jeopardized the Navys ability to deliver promised LCS capabilities.Based on a congressional request, GAO (1) identified technical, design, and construction challenges to completing the first four ships within current cost and schedule estimates, (2) assessed the Navys progress developing and fielding mission packages, and (3) evaluated the quality of recent Navy cost analyses for seaframes and their effect on program progress. GAOs findings are based on an analysis of government and contractor-generated documents, and discussions with defense officials and key contractors. This product is a public version of a For Official Use Only report, GAO-10-1006SU, also issued in August 2010.

Book Navy DD X   CG X   and LCS Ship Acquisition Programs  Oversight Issues and Options for Congress

Download or read book Navy DD X CG X and LCS Ship Acquisition Programs Oversight Issues and Options for Congress written by Ronald O'Rourke and published by . This book was released on 2005 with total page 92 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy in FY2006 and future years wants to procure three new classes of surface combatants a destroyer called the DD(X), a cruiser called the CG(X), and a smaller surface combatant called the Littoral Combat Ship (LCS). Congress in FY2005 funded the procurement of the first LCS and provided advance procurement funding for the first DD(X), which the Navy wants to procure in FY2007. The FY2006-FY2011 Future Years Defense Plan (FYDP) reduces planned DD(X) procurement to one per year in FY2007-FY2011 and accelerates procurement of the first CG(X) to FY2011. The FY2006 budget requests $666 million in advanced procurement funding for the first DD(X), which is planned for procurement in FY2007, $50 million in advance procurement funding for the second DD(X), which is planned for procurement in FY2008, and $1,115 million for DD(X)/CG(X) research and development. The budget requests $613.3 million for the LCS program, including $240.5 million in research and development funding to build the second LCS, $336.0 million in additional research and development funding, and $36.8 million in procurement funding for LCS mission modules. On April 20, 2005, Department of Defense (DOD) issued a decision deferring as premature a Navy proposal to hold a one-time, winner-take-all competition between Northrop Grumman's Ship System Division (NGSS) and General Dynamics Bath Iron Works (GD/BIW) for the right to build all DD(X)s. Several Members of Congress have expressed opposition to this idea. The Emergency Supplemental Appropriations Act for 2005 (H.R. 1268) as reported in the Senate contains a provision (Sec. 1119) that would effectively prohibit such a competition.

Book Oversight Review of the U S  Navy s Littoral Combat Ship Program

Download or read book Oversight Review of the U S Navy s Littoral Combat Ship Program written by United States. Congress. House. Committee on Armed Services. Oversight and Investigations Subcommittee and published by . This book was released on 2017 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Littoral Combat Ship and Frigate

Download or read book Littoral Combat Ship and Frigate written by U.s. Government Accountability Office and published by Createspace Independent Publishing Platform. This book was released on 2017-07-12 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy envisioned a revolutionary approach for the LCS program: dual ship designs with interchangeable mission packages intended to provide mission flexibility. This approach has fallen short, with significant cost increases, schedule delays, and reduced capabilities—some of which have yet to be demonstrated. The LCS acquisition approach has changed several times. The latest change led to the frigate—a ship that involves minor modifications to an LCS design. This report examines the Navy’s plans for the frigate acquisition as well as remaining opportunities for oversight. Congress should consider not enacting authority pursuant to the Navy’s request for a block buy of 12 frigates in fiscal year 2018 and delaying funding of the lead frigate until at least fiscal year 2019, when more information is available on the ship’s cost, design, and capabilities. GAO also recommends that DOD delay its procurement plans until sufficient knowledge is attained.

Book Navy DD X  and LCS Ship Acquisition Programs  Oversight Issues and Options for Congress

Download or read book Navy DD X and LCS Ship Acquisition Programs Oversight Issues and Options for Congress written by Ronald O'Rourke and published by . This book was released on 2005 with total page 94 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy in FY2006 and future years wants to procure no more Arleigh Burke (DDG-51) class destroyers and instead wants to begin procuring two new classes of surface combatants a new destroyer called the DD(X), and a smaller surface combatant called the Littoral Combat Ship (LCS). In support of this plan, the Navy for FY2005 requested procurement funding for three final DDG-51s and initial procurement funding for the first DD(X) and the first LCS. Congress for FY2005 provided $3,445.0 million for procurement of three DDG- 51s. Congress also provided $350.5 million in advance procurement funding for the DD(X) program $221.1 million for the first DD(X), and $84.4 million for the second DD(X) and directed that procurement of DD(X)s be fully funded in the Navy s ship-procurement account rather than incrementally funded in the Navy s research and development account as the Navy had proposed for the first DD(X). Congress approved the Navy s plan to build the first LCS using research and development funds rather than shipbuilding funds, provided $214.7 million in procurement funding to fund the ship s entire construction cost (rather than about half the ship s cost, as the Navy had requested), required the next LCS (to be funded in FY2006) to be built to a second LCS design now being developed, prohibited the Navy from requesting funds in FY2006 to build a third LCS, and required all LCSs built after the lead ships of each design to be funded in the Navy s ship-procurement account rather than its research and development account. As part of the proposed FY2006 defense budget to be submitted to Congress in early February 2005, the Navy is expected to request additional advance procurement funding for the first DD(X) and procurement funding for the second LCS.

Book Oversight Review of the U S  Navy s Littoral Combat Ship

Download or read book Oversight Review of the U S Navy s Littoral Combat Ship written by O'Rourke and published by . This book was released on 2016 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Littoral Combat Ship and Frigate  Delaying Planned Frigate Acquisition Would Enable Better informed Decisions

Download or read book Littoral Combat Ship and Frigate Delaying Planned Frigate Acquisition Would Enable Better informed Decisions written by United States. Government Accountability Office and published by . This book was released on 2017 with total page 29 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy envisioned a revolutionary approach for the LCS program: dual ship designs with interchangeable mission packages intended to provide mission flexibility. This approach has fallen short, with significant cost increases, schedule delays, and reduced capabilities--some of which have yet to be demonstrated. The LCS acquisition approach has changed several times. The latest change led to the frigate--a ship that involves minor modifications to an LCS design. This report examines the Navy's plans for the frigate acquisition as well as remaining opportunities for oversight. Congress should consider not enacting authority pursuant to the Navy's request for a block buy of 12 frigates in fiscal year 2018 and delaying funding of the lead frigate until at least fiscal year 2019, when more information is available on the ship's cost, design, and capabilities. GAO also recommends that DOD delay its procurement plans until sufficient knowledge is attained.

Book Navy DD X  and LCS Ship Acquisition Programs

Download or read book Navy DD X and LCS Ship Acquisition Programs written by and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy in FY2006 and future years wants to procure three new classes of surface combatants -- a destroyer called the DD(X), a cruiser called the CG(X), and a smaller surface combatant called the Littoral Combat Ship (LCS). Congress in FY2005 funded the procurement of the first LCS and provided advance procurement funding for the first DD(X), which the Navy wants to procure in FY2007. The FY2006-FY2011 Future Years Defense Plan (FYDP) reduces planned DD(X) procurement to one per year in FY2007-FY2011 and accelerates procurement of the first CG(X) to FY2011. The FY2006 budget requests $666 million in advanced procurement funding for the first DD(X), which is planned for procurement in FY2007, $50 million in advance procurement funding for the second DD(X), which is planned for procurement in FY2008, and $1,115 million for DD(X)/CG(X) research and development. The budget requests $613.3 million for the LCS program, including $240.5 million in research and development funding to build the second LCS, $336.0 million in additional research and development funding, and $36.8 million in procurement funding for LCS mission modules. On April 20, 2005, Department of Defense (DOD) issued a decision deferring as "premature" a Navy proposal to hold a one-time, winner-take-all competition between Northrop Grumman's Ship System Division (NGSS) and General Dynamics' Bath Iron Works (GD/BIW) for the right to build all DD(X)s. Several Members of Congress have expressed opposition to this idea. The Emergency Supplemental Appropriations Act for 2005 (H.R. 1268) as reported in the Senate contains a provision (Sec. 1119) that would effectively prohibit such a competition. The DD(X), CG(X), and LCS programs raise several oversight issues for Congress. Options for Congress for the DD(X) program include approving the program as proposed by the Navy and supplementing the industrial base, if needed, with additional work; accelerating procurement of the lead DD(X) to FY2006 and the second DD(X) to FY2007; deferring procurement of the lead DD(X) to FY2008; procuring two or more DD(X)s per year; building DD(X)s at a single yard, or building each DD(X) jointly at two yards; terminating the DD(X) program now (or after procuring a single ship as a technology demonstrator), and supplementing the industrial base with additional work until the start of CG(X) procurement; and starting design work now on a smaller, less expensive alternative to the DD(X) and procuring this new design, rather than DD(X)s or CG(X)s, starting around FY2011. Options for Congress on the LCS program include shifting procurement funding for LCS mission modules to the Navy's ship-procurement account; procuring a few LCSs and then evaluating them before deciding whether to put the LCS into larger-scale series production; procuring LCSs at a rate of up to 10 per year; procuring LCSs at a rate of less than 5 per year; terminating the LCS program and instead procuring a new-design frigate; and terminating the LCS program and investing more in other littoral-warfare improvements. This report will be updated as events warrant.

Book Oversight Review of the U S  Navy s Littoral Combat Ship Program

Download or read book Oversight Review of the U S Navy s Littoral Combat Ship Program written by United States. Congress. House. Committee on Armed Services. Oversight and Investigations Subcommittee and published by . This book was released on 2017 with total page 170 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Navy DD X   GC X   and LCS Ship Acquisition Programs  Oversight Issues and Options for Congress

Download or read book Navy DD X GC X and LCS Ship Acquisition Programs Oversight Issues and Options for Congress written by and published by . This book was released on 2005 with total page 104 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy in FY2006 and future years wants to procure three new classes of surface combatants a destroyer called the DD(X), a cruiser called the CG(X), and a smaller surface combatant called the Littoral Combat Ship (LCS) Congress in FY2005 funded the procurement of the first LCS and provided advance procurement funding for the first DD(X) which the Navy wants to procure in FY2007 The FY2006-FY2011 Future Years Defense Plan (FYDP) reduces planned DD(X) procurement to one per year in FY2007-FY2011 and accelerates procurement of the first CG(X) to FY2011. The FY2006 budget requests $716 million in advance procurement finding for the DD(X) program $666 million for the first DD(X), which is planned for procurement in FY2007 and 550 million for the second DD(X), which is planned for procurement in FY2008 and $1,115 million for DD(X)/CG(X) research and development The budget requests $6l3.3 million for the LCS program, including $576.5 million in research and development funding $240.5 million to build the second LCS, and $336.0 million in additional research and development funding and $36.8 million in procurement funding for LCS mission modules On April 20, 2005, Department of Defense (DOD) deferred as "premature" a Navy proposal to hold a one-time, winner-take-all competition between Northrop Grumman's Ship System Division (NGSS) and General Dynamics' Bath Iron Works (GD/BIW) for the right to build all DD(X)s.

Book Navy Littoral Combat Ship  LCS  Program

Download or read book Navy Littoral Combat Ship LCS Program written by and published by . This book was released on 2008 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy is procuring a new type of surface combatant called the Littoral Combat Ship (LCS). The Navy substantially restructured the LCS program in 2007 in response to significant cost growth and schedule delays in the program. The Navy's proposed FY2009 budget requests $920 million in procurement funding for the procurement of two LCSs, which would be the fourth and fifth ships in the restructured LCS program. The LCS is a small, fast, relatively inexpensive combat ship that is to be equipped with modular "plug-and-fight" mission packages, including unmanned vehicles (UVs). The basic version of the LCS, without any mission packages, is referred to as the LCS sea frame. The Navy wants to procure a total of 55 LCSs. Congress originally funded a total of six LCS sea frames (LCSs 1 through 6) in the FY2005, FY2006, and FY2007 defense budgets. In 2007, as Congress was considering the proposed FY2008 defense budget, the Navy canceled LCSs 3 though 6 as part of its restructuring of the program, leaving only LCSs 1 and 2 under construction. As part of its final action on the FY2008 defense budget, Congress did the following: accepted the Navy's cancellation of LCSs 3 through 6; funded the procurement one additional LCS in FY2008 (LCS-5); significantly reduced the Navy's FY2008 funding request for the LCS program; amended the LCS sea frame unit procurement cost cap; required the Navy to use fixed-price-type contracts for the construction of LCSs procured in FY2008 and subsequent years; criticized the execution of the LCS program; expressed concerns for the program; and expressed support for continuing with the program in restructured form. The issue for Congress for FY2009 is whether to approve, reject, or modify the Navy's restructured LCS program. The LCS program raises potential oversight issues for Congress relating to cost growth, total program acquisition cost, procurement cost cap, technical risk, and operational evaluation and competition for production.

Book Navy Littoral Combat Ship  Lcs  Program

    Book Details:
  • Author : Congressional Research Congressional Research Service
  • Publisher : CreateSpace
  • Release : 2014-12-24
  • ISBN : 9781505904871
  • Pages : 120 pages

Download or read book Navy Littoral Combat Ship Lcs Program written by Congressional Research Congressional Research Service and published by CreateSpace. This book was released on 2014-12-24 with total page 120 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy had been planning to procure an eventual total of 52 LCSs, but on February 24, 2014, Secretary of Defense Chuck Hagel announced that "no new contract negotiations beyond 32 ships will go forward" and that the Navy is to submit "alternative proposals to procure a capable and lethal small surface combatant, generally consistent with the capabilities of a frigate. I've directed the Navy to consider a completely new design, existing ship designs, and a modified LCS." Following Hagel's February 24, 2014, announcement, the Navy began an internal study of options for small surface combatants (SSCs) to be procured following the 32 LCSs. The Navy states that study was completed on July 31, 2014, as required. On December 10, 2014, Secretary of Defense Chuck Hagel, after reviewing the Navy's work, approved a Navy plan to procure an SSC based on an upgraded version of the two LCS designs. The upgrade includes additional equipment for air defense, surface warfare, and antisubmarine warfare, plus some other changes. The Navy estimates that the changes will increase the cost of each LCS by $60 million to $75 million. The Navy states that it is now starting to develop an acquisition strategy for procuring the 20 modified LCSs. LCSs have been procured since FY2010 under a pair of 10-ship, fixed-price incentive (FPI) block buy contracts that the Navy awarded to the two LCS builders-Lockheed and Austal USA-on December 29, 2010. Under these contracts, which cover the years FY2010-FY2015, four LCSs (numbers 21 through 24) were to be requested for procurement in FY2015. The Navy's proposed FY2015 budget, however, requests funding for the procurement of three rather than four LCSs. Hagel's February 24 announcement and the Navy's request for three rather than four LCSs in FY2015 raise several potential oversight issues for Congress, including the Navy's plan for determining which of the two LCS builders would receive one LCS in FY2015 rather than two, and the analytical basis for the actions affecting the LCS program announced by Hagel on February 24. The LCS program has been controversial due to past cost growth, design and construction issues with the lead ships built to each design, concerns over the ships' survivability (i.e., ability to withstand battle damage), and concerns over whether the ships are sufficiently armed and would be able to perform their stated missions effectively. Prior to Secretary Hagel's February 24, 2014, announcement, some observers, citing one or more of these issues, had proposed truncating the LCS program. In response to criticisms of the LCS program, the Navy has acknowledged certain problems and stated that it was taking action to correct them, and disputed other arguments made against the program.

Book Littoral Combat Ship and Frigate

    Book Details:
  • Author : United States Government Accountability Office
  • Publisher : Createspace Independent Publishing Platform
  • Release : 2017-09-22
  • ISBN : 9781977540201
  • Pages : 26 pages

Download or read book Littoral Combat Ship and Frigate written by United States Government Accountability Office and published by Createspace Independent Publishing Platform. This book was released on 2017-09-22 with total page 26 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy envisioned a revolutionary approach for the LCS program: dual ship designs with interchangeable mission packages intended to provide mission flexibility at a lower cost. This approach has fallen short, with significant cost increases and reduced expectations about mission flexibility and performance. The Navy has changed acquisition approaches several times. The latest change involves minor upgrades to an LCS design-referred to now as a frigate. Yet, questions persist about both the LCS and the frigate. GAO has reported on the acquisition struggles facing LCS and now the frigate. This statement discusses: (1) the evolution of the LCS acquisition strategy and where it stands today; (2) key risks in the Navy's plans for the frigate based on the LCS program; and (3) remaining oversight opportunities for the LCS and frigate programs. This statement is largely based on GAO's prior reports and larger work on shipbuilding and acquisition best practices. It incorporates limited updated audit work where appropriate.