EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book 300 FF 1 Operable Unit Remedial Investigation Phase II Report  Physical Separation of Soils Treatability Study

Download or read book 300 FF 1 Operable Unit Remedial Investigation Phase II Report Physical Separation of Soils Treatability Study written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This report describes the approach and results of physical separations treatability tests conducted at the Hanford Site in the North Process Pond of the 300-FF-1 Operable Unit. Physical separation of soils was identified as a remediation alternative due to the potential to significantly reduce the amount of contaminated soils prior to disposal. Tests were conducted using a system developed at Hanford consisting of modified EPA equipment integrated with screens, hoppers, conveyors, tanks, and pumps from the Hanford Site. The treatability tests discussed in this report consisted of four parts, in which an estimated 84 tons of soil was processed: (1) a pre-test run to set up the system and adjust system parameters for soils to be processed; (2) a baseline run to establish the performance of the system - Test No. 1; (3) a final run in which the system was modified as a result of findings from the baseline run - Test No. 2; and (4) water treatment.

Book 300 FF 1 Operable Unit Remedial Investigation

Download or read book 300 FF 1 Operable Unit Remedial Investigation written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 782 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Radioactive Waste Management

Download or read book Radioactive Waste Management written by and published by . This book was released on 1981 with total page 726 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase 1 and 2 Feasibility Study Report for the 300 FF 1 Operable Unit

Download or read book Phase 1 and 2 Feasibility Study Report for the 300 FF 1 Operable Unit written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The 300-FF-1 Operable Unit (OU) feasibility study (FS) presented in this document completes the FS process only through the first two study phases: Phase I, Remedial Alternatives Development, and Phase II, Remedial Alternatives Screening in accordance with CERCIA guidance for performing Remedial Investigations and Feasibility Studies (RI/FS) (EPA 1988a). This Phase I/II study provides a generalized view of workable remedial technologies as applied to the site contamination problems as a whole. Phase III, Detailed Analysis of Alternatives, will be performed at a later date to further evaluate screened alternatives based on the nine criteria in the CERCLA RI/FS guidance. The purpose of this Phase I/II FS is to develop and screen a range of alternatives for remediation of contamination present in the vadose zone of the 300-FF-1 OU. The scope of work for this Phase I/II FS includes five primary tasks: 1. Review existing documents and their associated data from relevant investigations and studies; 2. Establish remedial action objectives (RAO) and general response actions (GRA); 3. Identify applicable or relevant and appropriate requirements (ARARS) pertinent to all general response actions (including waste disposal); 4. Develop remedial alternatives (Phase I) applicable to the 300-FF-1 OU including identification and screening of technologies and process options, and assembly of remedial alternatives from representative technology types; 5. Screen alternatives (Phase II) developed in Phase I for implementability, effectiveness, and cost to identify those alternatives which warrant advancement to the detailed analysis phase (Phase III) of the FS.

Book Phase I and II Feasibility Study Report for the 300 FF 5 Operable Unit

Download or read book Phase I and II Feasibility Study Report for the 300 FF 5 Operable Unit written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018.

Book Phase 1  Remedial Investigation Report for the 300 FF 5 Operable Unit

Download or read book Phase 1 Remedial Investigation Report for the 300 FF 5 Operable Unit written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Volume two contains the following appendices: 300-FF-5 spring, sediment, Columbia River -- water and spring groundwater well analytical data; 300-FF-5 borehole soil analytical data; 300-FF-5 groundwater analytical data for 1st, 2nd, 3rd, and 4th sampling rounds; numerical groundwater flow and transport modeling; pertinent correspondence; data quality summary; monthly potentiometric surface contour maps of the unconfined aquifer in the 300-FF-5 operable unit; applicable or relevant and appropriate requirements; calculations of estimated future groundwater concentrations resulting from 300-FF-1 soil contamination; risk assessment example calculations; plume maps for 300-FF-5 operable unit contaminants of potential concern; analytical model input; and toxicity profiles for contaminants of potential concern at the 300-FF-5 operable unit.

Book Soil Washing Physical Separations Test Procedure   300 FF 1 Operable Unit

Download or read book Soil Washing Physical Separations Test Procedure 300 FF 1 Operable Unit written by and published by . This book was released on 1993 with total page 117 pages. Available in PDF, EPUB and Kindle. Book excerpt: This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit, {close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l, {close_quotes} (DOE-RL 1993).

Book Phase 1  Remedial Investigation Report for the 300 FF 5 Operable Unit

Download or read book Phase 1 Remedial Investigation Report for the 300 FF 5 Operable Unit written by and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase I Remedial Investigation Report for the 300 FF 1 Operable Unit

Download or read book Phase I Remedial Investigation Report for the 300 FF 1 Operable Unit written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 1993 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1995 with total page 534 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation feasibility Study Report for the 300 FF 5 Operable Unit

Download or read book Remedial Investigation feasibility Study Report for the 300 FF 5 Operable Unit written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 1995 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase I Remedial Investigation Report for the 300 FF 5 Operable Unit

Download or read book Phase I Remedial Investigation Report for the 300 FF 5 Operable Unit written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book SSSA Special Publication Series

Download or read book SSSA Special Publication Series written by and published by . This book was released on 1997 with total page 696 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Data Compilation Task Report for the Source Investigation of the 300 FF 1 Operable Unit Phase 1 Remedial Investigation

Download or read book Data Compilation Task Report for the Source Investigation of the 300 FF 1 Operable Unit Phase 1 Remedial Investigation written by and published by . This book was released on 1990 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides additional information on facility and waste characteristics for the 300-FF-1 operable unit. The additional information gathered and reported includes meetings and on-site visits with current and past personnel having knowledge of operations in the operable unit, a more precise determination of the location of the Process Sewer lines and Retired Radioactive Liquid Waste Sewer, a better understanding of the phosphoric acid spill at the 340 Complex, and a search for engineering plans and environmental reports related to the operable unit. As a result of this data-gathering effort, recommendations for further investigation include characterization of the 307 Trenches to determine the origin of an underlying uranium plume in the groundwater, more extensive sampling of near-surface and dike sediments in the North and South Process Ponds to better define the extent of horizontal contamination, and detection of possible leaks in the abandoned Radioactive Waste Sewer by either electromagnetic induction or remote television camera inspection techniques. 16 refs., 4 figs., 5 tabs.